Notice ID: 42ca367c38e63e318b700b4b47116a44Award NoticeAwarded
Reach I Contract 1
Awarded on July 30, 2018. Full description on SAM.gov.
Awarded tounder W9123818C0022 (source: SAM.gov award notice)• $31.2M
Overview
- Posted
- July 30, 2018
- Notice type
- Award Notice
- Agency
- Department of War
Notice details
- Place of performance
- The confluence of the American and Sacramento Rivers, adjacent to Discovery Park, Interstate 5 and Garden Highway., SACRAMENTO, 95814
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Sep 10, 2025
- Award date
- Jul 30, 2018
- Award amount (SAM.gov award notice)
- $31.2M
Identifiers
- Solicitation number
- W9123818B0007
- Notice ID
- 42ca367c38e63e318b700b4b47116a44
- Award number (PIID)
- W9123818C0022
Description
***FOR SUBCONTRACTOR OPPORTUNITIES ONLY*** In accordance with the solicitation process identified in Sources Sought Number W91238-18-S-1618, dated 13 April 2018, the following solicitation is posted for subcontractor opportunities only. Reach I Contract 1 Levee Improvement Construction Project This solicitation is proceeding as a 100% Total Small Business Set Aside for those prequalified small business concerns identified on the Prequalified Sources List (PSL) dated 18 May 2018. Only those small business concerns identified on the PSL are eligible to submit a bid for this project. Scope of the Project Description: The Natomas Basin Reach I Contract 1 is located on the reach of Natomas levee adjacent to the American River in Sacramento, California. Reach I Contract 1 includes installation of approximately two miles of cement-bentonite cutoff walls between Gateway Oaks Boulevard and Northgate Boulevard, mostly centered on Garden Highway. The cutoff walls will have an average depth of 45 feet. Excavation spoils will be hauled to a site identified herein to be spread and compacted. A landside drainage blanket will be installed on the levee slope underneath Interstate 5. Relocation and/or removal of waterlines, sanitary force mains, and other utilities will be included in this contract. Multiple lane closures, road closures, and bicycle trail closures are also included, requiring traffic control, detours, and signage for both vehicles and pedestrian/bicyclists. Repaving and striping of roads and trails is also included. The prime contractor shall self-perform 100 percent of the cutoff wall effort. In accordance with DFARS 236.204(i), the estimated magnitude is between $10M & $25M. This proposed contract action will be conducted using FSC Code: Y1LC, Construction of Tunnels and Subsurface Structures and North American Industry Classification System Code (NAICS): 237990 Other Heavy and Civil Engineering Construction and the small business size standard is $36.5 million. The only PLAN-HOLDER'S/BIDDER'S LIST now available is attached to this notice. When viewing the Synopsis/Pre-solicitation Notice, you will click on the 'ADD ME TO INTERESTED VENDORS' to enter your information. This function does not, however, allow you to identify yourself as a Subcontractor. It is recommended that you identify your category in parentheses at either the beginning or end of your company name. For example: XYZ Construction (Sub). IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK FEDBIZOPPS FREQUENTLY FOR ANY CHANGES TO THIS NOTICE.
Award Overview
Award Number
W9123818C0022
Award Amount (SAM.gov award notice)
$31.2M
Award Date
Jul 30, 2018
Awardee
Awardee UEI
L3C5J596P4W7
Original Solicitation
Notice ID: 42ca367c38e63e318b700b4b47116a44
Posted Date: Jul 30, 2018
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $71.5MSigned Sep 2, 2025
- $71.8MSigned Jan 28, 2025
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W9123818B0007- Awarded
This opportunity has been awarded.
- 5×
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W9123818B0007
Archive Date
Aug 14, 2018
Office Address
SACRAMENTO, CA, 95814-2922