GovChime
Notice ID: 59b5cfefa80b482abb02817cd4fe669dSolicitation

Sacramento River East Levee (SREL) Contract 1

Archived on January 30, 2020. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
10:00 AM UTC−08:00
Posted
January 15, 2020
Notice type
Solicitation
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W075 ENDIST SACRAMENTO
Place of performance
Sacramento
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W9123820B0003
Notice ID
59b5cfefa80b482abb02817cd4fe669d

Description

****Bid Abstract posted**** ***Amendment 0002 includes another revised pricing schedule, revised specificaiton section, and revised drawings. Previous out dated pricing schedules will be inactivated, and a revised, conformed solicitation will be posted, as the Contract Line Items have moved to match the pricing schedule.*** ***Amendment 0001 includes revised plans, specs, new Exhibit A and B, price schedule, updates response date, changes acceptance period to 45 days and provides information on ProjNet and the PSL. Note: Due to ProjNet being down until 31 December 2019, the Government will open ProjNet back up from 2 Jan - 6 Jan 2020 and will respond to all inquiries by 8 Jan 2020. In the meantime, please send inquiries to DeAnna Mannel at DeAnna.L.Mannel@usace.army.mil. All inquireis that are emailed to DeAnna will also need to be submitted through ProjNet once the site opens back up. *** ***The drawings and specificaitons are too large to post to this notice. Please contact DeAnna Mannel @ DeAnna.L.Mannel@usace.army.mil for the files to be sent via a file transfer site. *** The Project is located within the City of Sacramento, California, along various segments of the Sacramento River East Levee (SREL) from just north of US 50 to just west of Freeport Blvd. The combined length of the levee segments to be remediated under this contract is approximately 3.0 miles (see attached). The SREL lies within a heavily urbanized area with residential, recreation, and industrial use areas. Backyards and other structures are at or near the landside levee toe along significant stretches. During the last three decades, Sacramento Area Flood Control Agency (SAFCA) and USACE have designed and constructed improvements along several portions of the subject levee. Improvements included shallow and deep seepage cutoff walls, seepage and stability berms, and erosion protection. The levee repair design is constrained by limited levee access, residences and other structures at or near the landside toe, and limited working space along the waterside berm, if present. The work includes, but is not limited to, providing and maintaining all temporary facilities; implementing Storm Water Pollution Prevention Plan requirements; complying with all applicable permit requirements and environmental mitigation measures for the Project; developing staging areas designated for Contractor's use to the extent needed; coordinating with Agencies and stakeholders as necessary; degrading and reconstructing 2+ miles of levee (~150,000 cubic yards) to support construction of both Deep Mix Method (DMM) and slurry trench cutoff walls; constructing drained stability berms and seepage berms (~30,000 cubic yards); reusing excavated soils that meet specification criteria for reuse as levee fill; importing soil for levee fill as necessary; managing and disposing of excess excavated soils; removing and replacing 2+ miles of paved bike paths, researching, potholing, protecting, removing, and replacing existing utilities as shown on the plans and as needed to perform the work; removing all temporary facilities; and restoring and seeding all disturbed areas. The work required under this contract must be completed within one season, which is likely to require multiple cutoff wall headings be constructed concurrently. The contractor must finish within one construction season with all work completed within calendar year 2020. The line of flood protection must be fully restored not later than 31 October 2020. Work at Miller Park must be completed after Labor Day.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

DeAnna L. Mannel
Contract Specialist

Secondary Contact

Melissa A. DeNigris
Contract Specialist

Documents

No documents available.

Lifecycle

Solicitation:W9123820B0003
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 7×
    SolicitationCurrentDec 9, 2019

    Sacramento River East Levee (SREL) Contract 1

    Notice 59b5cfefa80b482abb02817cd4fe669d on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W9123820B0003

Archive Date

Jan 30, 2020

Office Address

SACRAMENTO, CA, 95814-2922