GovChime
Notice ID: 63c522dcedb7462ba2839776cf5e1b30Solicitation

Sacramento River East Levee (SREL) Contract 2

Archived on December 30, 2020. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
10:00 AM UTC−08:00
Posted
December 15, 2020
Notice type
Solicitation
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W075 ENDIST SACRAMENTO
Place of performance
Sacramento, 95814
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W9123821B0001
Notice ID
63c522dcedb7462ba2839776cf5e1b30

Description

Please note, all bids are due at 10am, however, the WebEx will not begin until 10:30, to ensure all bids are downloaded from DOD SAFE timely. All bids must be uploaded and the email sent from DOD SAFE to the Contracti Specialist by 10am, no exceptions will be made for technical difficulites. ****Amendment 0004 posted a revised pricing schedule, revised drawing and 2 revised spec sections.**** ****Amendment 3 extends the bid opening date, and posts specification and drawing revisions. Also includes additional specification attachments.***** ****Amendment 2 extends bid opening date and posts several revisions.**** ****Site Visit Sign-In Sheet posted 17 Nov 2020**** **** Site Visit Slides posted 10 Nov 2020 **** Please see attachments and bring a printed copy to the site visit. ****Amendment 1 changes the site visit date and time**** The Government anticipates issuing an Invitation for Bid with the intent of awarding a Firm-Fixed Price construction contract for Sacramento River East Levee, Contract 2 Project Description: The scope of work for Sacramento River East Levee (SREL) Contract 2 is construction of approximately 1.8 miles of varying types of seepage cutoff walls including open trench Soil-Bentonite (SB) and Slag Cement-Cement-Bentonite (SCCB) Cutoff Walls, Deep Mix Method (DMM) Cutoff Walls, and Jet Grout Cutoff walls. Construction of the cutoff walls is along discontinuous reaches of SREL within the Miller Park, Little Pocket, and Big Pocket areas of Sacramento, CA. The scope also includes relocation and removal of multiple utilities within the work areas, working adjacent to an active railroad line, modification of existing relief wells, removal and replacement of City of Sacramento Sump 63 in the Big Pocket, and removal, handling, and disposal of contaminated soils. Night work is permitted for construction of Jet Grout cutoff walls only. All work is required to be completed No Later Than (NLT) December 2021 with the levee reconstruction completed NLT 30 September 2021. Multiple concurrent efforts will be required to complete work within the given period of performance. In accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be between $25,000,000 to $100,000,000. This prospective contract action will be conducted using NAICS Code is 237990 - Other Heavy and Civil Engineering Construction. The size standard is $39.5M. Product Service Code is Y1LC - Construction of Tunnels and Subsurface Structures. The solicitation will proceed unrestricted and must use contractors from the Pre-Qualified Sources List (PSL) for the included features of work. The solicitation is estimated to be issued on or about 30 October 2020 with bids due tentatively on 30 November 2020. The IFB will be issued on the Government Point of Entry known as beta.sam.gov and will establish a firm bid due date/time. If applicable, the site visit date, time and location will be identified in the solicitation. BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W9123821B0001
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationOct 15, 2020

    Sacramento River East Levee (SREL) Contract 2

    Notice 1d942175eba94c53a2936e03a56fed1d on SAM.gov

  2. 9×
    SolicitationCurrentOct 30, 2020

    Sacramento River East Levee (SREL) Contract 2

    Notice 63c522dcedb7462ba2839776cf5e1b30 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W9123821B0001

Archive Date

Dec 30, 2020

Office Address

SACRAMENTO, CA, 95814-2922