Notice ID: 4123402d389848598b2a37331d6d2d77Solicitation
USACE SPK Design Build Construction - GBSD Technology and Collaboration Center - Hill AFB, UT
Archived on August 1, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM UTC−07:00
- Posted
- July 17, 2023
- Notice type
- Solicitation
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W075 ENDIST SACRAMENTO
- Place of performance
- Hill AFB, 84056
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W9123822R0050
- Notice ID
- 4123402d389848598b2a37331d6d2d77
Description
The scope of this project for Design-Build (DB) construction services is to construct a Ground Based Strategic Deterrent (GBSD) Technology and Collaboration Center (TACC) to provide a mix of secure and unclassified office, technical, and collaboration areas sized to accommodate various workgroups and teams necessary to develop and sustain the next generation Intercontinental Ballistic Missile (ICBM) weapon system. New construction will have armor-plated concrete footings and foundation, structural steel frame, insulated walls and roof, lightning protection, fire detection/suppression, and intrusion detection. Finished ceiling heights will be typical for administrative and collaboration areas. Designated areas will be constructed to ICD/ICS 705 technical standards. Secure office and some technical areas will have a raised floor system necessary for distributing and flexibility in reconfiguring multiple systems. The project includes a ground-level parking area with curbs and lighting to support both office and collaboration areas, all supporting utilities such as water, storm water and sanitary sewer, and communications connections, plus roadway improvements with curb, gutter, and sidewalks necessary to integrate the facility into the base system. In accordance with DFARS 236.204(ii) the magnitude of construction is estimated to be between $25,000,000 and $100,000,000.BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0050' to obtain more details.*
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Jeremy Grimley
Documents
No documents available.
Lifecycle
Solicitation:
W9123822R0050- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 4×SolicitationCurrentSep 13, 2022
USACE SPK Design Build Construction - GBSD Technology and Collaboration Center - Hill AFB, UT
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W9123822R0050
Archive Date
Aug 1, 2023
Office Address
SACRAMENTO, CA, 95814-2922