Notice ID: f78bafefb58c41f2a629886d01ddc0e7Solicitation
USACE SPK Design-Bid-Build Construction - GBSD Software Sustainment Center (SSC) Module Storage Magazines (MSMs) - Hill AFB, UT
Archived on May 18, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM UTC−06:00
- Posted
- May 4, 2023
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W075 ENDIST SACRAMENTO
- Last updated
- Dec 6, 2025
Identifiers
- Solicitation number
- W9123823B0014
- Notice ID
- f78bafefb58c41f2a629886d01ddc0e7
Description
HILL AIR FORCE BASE SOFTWARE SUSTAINMENT CENTER (SSC) MODULAR STORAGE MAGAZINES (MSMS). This project includes construction services for construct two (2) earth covered reinforced concrete Hayman Igloo Modular Storage Magazines or ?igloos? at Hill Air Force Base (HAFB), Utah. Construction shall include utilities, site improvements, and other requirements in accordance with the terms of the contract and stated in the attachments. North American Industrial Classification System (NAICS) code: 236220, Commercial and Institutional Building Construction Product or Service Code (PSC): Y1GA, Construction of Ammunition Storage Buildings Small Business Administration (SBA) Size Standard: $39,500,000.00 Annual Revenue In accordance with the Federal Acquisition Regulation 36.204(g), the estimated magnitude of construction for this project is estimated to be between $5,000,000 and $10,000,000. Requirement is a total (100%) small business set-aside. Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available. BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS. This Amendment is issued to: 1) Update Section 00 10 00, Delivery Schedule period of performance (POP) to 365 days after receipt of Notice to Proceed (NTP). 2) Update Clause 52.211-10 w ith 365 days after receipt of Notice to Proceed (NTP). 3) Correct language in Section 00 21 13 to show that ProjNet closed on 10 March 2023. 4) Correct bid deadline date in Section 00 21 13 to Thursday, 13 April 2023.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W9123823B0014- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 10×SolicitationCurrentFeb 15, 2023
USACE SPK Design-Bid-Build Construction - GBSD Software Sustainment Center (SSC) Module Storage Magazines (MSMs) - Hill AFB, UT
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Single Project RFP Set-Aside for Small Businesses NAICS Code: 236220 - Commercial and Institutional Building Construction The Indiana Air National Guard intends to issue a Request for Proposals (RFP) to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary for the Construction of a Munitions Maintenance and Inspection (M and I) facility, two earth-covered munitions storage igloos, Munitions Assembly Complex (MAC) Pad, inert storage, and above ground munitions storage facilities, according to design documents (i.e., specifications, drawings, etc.) developed by contracted A-E firm. The contract Period of Performance is estimated to be 545 calendar days after notice to proceed to include inspection and punch list. This project is set aside 100% for Small Businesses. The North American Industry Classification System (NAICS) Code is 236220, with a small business size standard of $45,000,000. The target price range for this project is between $14,000,000 and $18,000,000. The tentative date for issuing the solicitation is on-or-about 3 DEC 2026. The tentative date for the pre-proposal conference is on-or-about 17 DEC 2026, 2:00pm local time, location to be provided in the solicitation. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the preproposal conference. All questions for the pre-bid conference must be submitted by 15 DEC 2026 via email to 122.fw.contracting.org@us.af.mil. The Solicitation close date is tentatively planned for on-or-about 14 JAN 2026. Actual dates and times will be identified in the solicitation. The source selection process will be conducted in accordance with the Source Selection Procedures described in RFO FAR 15.103-1 Tradeoff Approach. Evaluation factors include PRICE, QUALITY, (including four (4) Significant Subfactors: Experience and Capability, Construction Schedule, Safety Rating, and Quality Control), and PAST PERFORMANCE (including six (6) Significant Subfactors: Quality Control, Timely Performance, Management Effectiveness, Compliance with Safety Standards, Compliance with Federal law and regulations, and Compliance with utilization of small business concerns requirements). The Government intends to evaluate proposals and make award without negotiation. NOTE: All dates in this presolicitation notice are subject to change. Interested offerors must be registered in the System for Award Management (SAM). To register go to www.SAM.gov. Instructions for registering are on the web page (there is no fee for registration). The solicitation and associated information will be available only from the Solicitation module of the Procurement Integrated Enterprise Environment (PIEE) website at https://piee.eb.mil. The solicitation will not be an invitation for bids and there will not be a formal public bid opening. All inquiries must be in writing, preferably via email to the persons specified in the solicitation. All answers will be provided in writing via posting to SAM.gov. If you have any questions concerning this procurement you are encouraged to email your questions to 122.fw.contracting.org@us.af.mil. Your attention is directed to FAR clause 52.219-14, LIMITATIONS ON SUBCONTRACTING, which states: By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded. In accordance with RFO FAR 36.101-4, the following information is provided: The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at RFO FAR 43.304. Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements. DISCLAIMER: The official plans and specifications will be located on the official Government webpage, and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors' responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible for various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the documents posted on the referenced web pages. The Government will not issue paper copies. Specification of brand name items: Monaco for compatibility with existing installation fire detection system. Tridium Niagara Framework for compatibility with existing installation DDC system. Advantor for compatibility with existing installation security/intrusion detection system. Lockmasters for continuity with existing installation door hardware. Noted justifications will be included with solicitation. Additional information for optional line items: In addition to the base work described above, the solicitation will include the following option line items: Building 790 Demolition Building 906 MAC Pad Site Lighting | 76% | Pre-Solicitation | Open |
This solicitation will close in 33 days. The solicitation is restricted to Small Businesses. Project Description: This project is for the construction of two (2) Munitions Storage Igloos at Ellsworth, AFB, South Dakota. The site contains two (2) existing earth-covered munition storage igloos that will need to be demolished that are 5145 square feet total. See PWS, Specifications and Drawings for more information. Estimated Construction Costs: The estimated construction cost of this project is between $6,000,000 and $8,000,000. | 73% | Solicitation | 12/08/2026 |
Response date renewed to Friday, 10 JUL 2026 at 5:00PM EST. Due to delays associated with the final phase of design, this Sources Sought Notice is being renewed to determine if new interest has developed since the original response date. If you previously submitted a response to the original notice or updated notice (Update Number 0001), you do NOT need to submit a new response. However, you are invited to submit a new response if relevant information previously provided on your Sources Sought Response Form has changed (e.g., bonding capacity increase). THIS IS A SOURCES SOUGHT NOTICE. This is NOT a solicitation. This is market research for a project to determine potential construction contractor sources including qualified and eligible Small Businesses. This notice is for planning purposes only. Not responding to this Sources Sought Notice does not preclude participation in any future solicitation should one be issued. It is the responsibility of interested parties to monitor the SAM.gov website for additional information pertaining to this Sources Sought Notice. The purpose of this requirement is to construct a Munitions Maintenance and Inspection (M and I) facility, two earth-covered munitions storage igloos, Munitions Assembly Complex (MAC) Pad, inert storage, and above ground munitions storage facilities, according to design documents (i.e., specifications, drawings, etc.) developed by contracted A-E firm. The construction schedule is estimated to be approximately 545 days (18 months). Solicitation of offers is planned to be published prior to 31 JUL 2026. The target price range for this project is between $14,000,000 and $18,000,000. Response INFORMATION: Interested parties must provide this office, in writing via single PDF, a notice stating their positive intent to submit an offer as a prime contractor no later than 28 MAY 2026 at 5:00PM EST. This notification, not to exceed seven typewritten pages (not inclusive of attachments), must include (1) Positive statement of intent to bid as a prime contractor, and (2) Completed Sources Sought Response Form (attached to this Notice). Responses may include information on projects completed during the past three years of a similar scope, both for government and private industry. If including past project information, provide the following details for each project: Type of project, Price, Contract number, Location, Customer and Customer point of contact. If Small Businesses are not available to provide for adequate competition for this project, it may be advertised as Unrestricted. Information shall be provided via emails to both: travis.kraick@us.af.mil and andrew.brown.69@us.af.mil. Include in the subject line: Sources Sought_Munitions Storage Area_[Insert Company Name] | 72% | Market Research | 07/10/2026 |
09-Nov-2026: Posting Amendment 0004. Offer due date extended to 24 Nov 2026, 3:30 PM HST. Updating water and electricity utility charge rates in solicitation. Incorporating Questions and Answers to the plans and specifications. Incorporating project KNMD209085 and KNMD209086, drawings and specifications Addendum A.____26-Oct-2026: Posting Amendment 0003, Questions and partial answers to the plans and specifications. Additional answers once received to questions related to the plans and specifications will be incorporated in a future amendment. ____21-Oct-2026: Posting Amendment 0002. Extending the offer due date to 12 Nov 2026, 10:00 AM HST. Incorporating new wage determination, questions and answers to the solicitation, and questions and partial answers to the plans and specifications. Additional answers once received to questions related to the plans and specifications will be incorporated in a future amendment. ____07-Oct-2026: Posting Amendment 0001, preproposal conference slides and sign-in attendance sheet in PIEE/Solicitation Module. The purpose of Amendment 0001 is to change Questions due NLT 16 Oct 2026, 5:00 PM HST, and the offer due date to 30 Oct 2026, 3:30 PM HST. ____23-Sep-2026: This is a Solicitation Notice, Request for Proposal. Single Project RFP Set-Aside for Small Businesses NAICS Code: 236220 - Commercial and Institutional Building Construction. The Hawaii National Guard intends to issue a Request for Proposals (RFP) to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary for the Construction of KNMD209085 Munitions Maintenance and Inspection Facility and KNMD209086 Conventional Munitions Cube Storage Addition located on the Hawaii Air National Guard campus, at Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii. These projects will be concurrent. KNMD209085 Munitions Maintenance and Inspection Facility - Construct a new Munitions Maintenance and Inspections facility by utilizing conventional design and construction methods to accommodate the facility mission. This project has a statutory cost limitation $14M for Unspecified Minor Military Construction (UMMC) Project - Adjustment of Dollar Limitations for Location pursuant to 10 USC Section 2805. Project square footage is estimated at 2,400 SF. Work covered in this project includes but is not limited to: Micro-pile Foundations: Specialized foundation engineering featuring micro-piles to mitigate challenging soil conditions and ensure seismic structural integrity. Cast-in-Place Concrete: Constructing robust concrete slab-on-grade, concrete walls, capping beams, and associated structural masonry elements. Structural Framing and Enclosure: Utilizing cold-formed metal framing, insulated metal wall panels, and structural steel support systems. Roofing: Installation of high-performance standing seam metal roofing, complete with prefinished gutters, downspouts, and weather barrier wraps. Specialized Systems: Installation of mechanical HVAC systems (including specialized 20-ton air conditioning systems), interior plumbing, lightning/grounding protection, and communication infrastructure. Fire Protection: A complete fire alarm-mass notification system and wet-pipe sprinkler suppression system. In addition to the base work described above, the solicitation will include the following option line items: 1. MAC Pad - Construct 1,167 SY concrete pad for the Material Assembly Center (MAC), required for constructing munitions, along with new asphalt pavement for access and egress to the facility maintenance bays. KNMD209086 Conventional Munitions Cube Storage Addition - Construct an addition to the Munitions Cube Storage Facility (B3552) utilizing conventional design and construction methods to support the F-22 mission. This project has a statutory cost limitation $14M for Unspecified Minor Military Construction (UMMC) Project - Adjustment of Dollar Limitations for Location pursuant to 10 USC Section 2805. Project square footage is estimated at 1,320 SF. Work covered in this project includes but is not limited to: Substructure and Enclosure: Micro-pile foundations, concrete wall structures, cast-in-place concrete slabs, and 12 in. thick concrete walls designed for high-hazard storage specifications. Framing and Roofing: Structural steel framing, roof joists, and standing seam metal roofing matching existing facility standards. Exterior Elements: Erection of new asphalt pavement adjacent to the existing facility access to provide adequate logistics and material handling access around the new facility addition. Specialized Protection: Maintenance facility lightning and grounding protection systems, along with integrated fire detection and alarm reporting systems connected back to the base reporting system. APPLICABLE TO BOTH PROJECTS: RAB Lighting exterior wall packs and area lights are sole source/brand name specific for compatibility with existing installation systems (noted justifications will be included with solicitation). Project Phasing and Security Gates: The contractor will be required to erect a temporary security fence around the construction zone in accordance with the project staging and phasing drawings. Escort Requirements: Escort personnel shall be required when erecting the temporary security fence, performing work occurring outside the temporary security fence, and connecting utilities to the existing system. Secured Zone Access: Once the temporary security fencing is approved and accepted by the Contracting Officers Representative (COR), no escort shall be required within the active secured work zone during construction, allowing the contractor to work within the secured boundary unimpeded. The magnitude of construction is between $10,000,000 and $25,000,000 total. KNMD209085 Munitions Maintenance and Inspection Facility project duration will be 733 calendar days after notice to proceed to include inspection and punch list. KNMD209086 Conventional Munitions Cube Storage Addition project duration will be 456 calendar days after notice to proceed to include inspection and punch list. This action is being solicited as a set-aside 100% for Small Businesses. The North American Industry Classification System (NAICS) Code is 236220, with a small business size standard of $45,000,000. A pre-proposal conference is scheduled 01 October 2026, 08:00 am local time, location to be provided in the solicitation. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the preproposal conference. All questions for the pre-bid conference must be submitted by 28 September via email to cezar.y.deveas.mil@army.mil and copy to anthony.g.reyes1.civ@army.mil. The solicitation closing date is 28 October 2026. Actual dates and times will be identified in the solicitation. The source selection process will be conducted in accordance with the Source Selection Procedures described in FAR 15.2, DFARS 215.2, and AFARS 5115.2. Evaluation factors include Technical Capability, Past Performance and Price. The Government intends to award a contract without conducting discussions. Interested offerors must be registered in the System for Award Management (SAM). To register go to www.SAM.gov. Instructions for registering are on the web page (there is no fee for registration). The solicitation and associated information will be available only from the Contract Opportunities page at SAM.gov. The solicitation and associated information will be posted within Procurement Integrated Enterprise Environment (PIEE) Solicitation Module and subsequently uploaded into the Contract Opportunities page at SAM.gov. Per the solicitation requirements, Offerors are required to submit their proposals through the vendor portal for solicitations within the PIEE platform. A Proposal Manager role is required to submit an offer to a solicitation posted in the PIEE Solicitation Module. A PIEE Solicitation Module Vendor Access Instructions is attached. If your company is new to PIEE and has no Account Administrator, the link below provides the general steps in getting started as a vendor to use the PIEE Solicitation Module and other PIEE applications: https://pieetraining.eb.mil/wbt/xhtml/wbt/portal/overview/vendorRegister.xhtml. This solicitation is not an invitation for bids and there will not be a formal public bid opening. All inquiries must be in writing, preferably via email to the persons specified in the solicitation. All answers will be provided in writing via posting to SAM.gov. If you have any questions concerning this procurement you are encouraged to email your questions to cezar.y.deveas.mil@army.mil and copy to anthony.g.reyes1.civ@army.mil. Your attention is directed to FAR clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states -By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractors 85 percent subcontract amount that cannot be exceeded-. In accordance with RFO FAR 36.101-4, the following information is provided: (a) There are no agency-specific policies or procedures that apply to the definitization of equitable adjustments for change orders under construction contracts. (b) No data is available regarding the timely definitization of equitable adjustments for change orders under construction contracts. DISCLAIMER: The official plans and specifications are located on the official Government webpage and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible for various reasons. The Government is not responsible for any loss of Internet connectivity or for an offerors inability to access the documents posted on the referenced web pages. The Government will not issue paper copies. | 72% | Solicitation | 11/24/2026 |
The United States Army Corps of Engineers (USACE), Sacramento District (SPK), requires a design-build (DB) and design-bid-build (DBB) ? Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for Construction Services in support of SPK programs located primarily in the following army installations: Military Ocean Terminal Concord (MOTCO)/ Bay Area/ Central California, Presidio of Monterey/ Fort Hunter Liggett/ Camp Parks/ Camp Roberts/ DDJC Tracy. Secondary locations within the Sacramento boundaries of California and Utah. Specific needs will be determined based upon project requirements as described in each task order. Selected firms will work on a variety of projects that may include but not necessarily limited to new construction (including new work, additions, alterations, maintenance, and repairs) of commercial and institutional buildings and related structures. Anticipated work may include the following: New facilities to include but not limited to: Access Control Points, water tower, pavement repair and renovation of existing facilities to include but not limited to administrative buildings, training rooms, interior/exterior repairs, roofing, building mechanical systems (e.g. HVAC). Utility Infrastructure to include but not limited to water lines, sewer lines, roads, electrical, and communication utilities.-----AMENDMENT 0001 IS ISSUED TO:UPDATE SECTION 00 21 00, PARAGRAPH 2.7 TOTAL PAGE LIMIT AND 3 TOTAL PAGE LIMIT, IN ATTACHMENT 5.-----AMENDMENT 0002 IS ISSUED TO: UPDATE SECTION 00 21 00, IN ATTACHMENT 5.-----AMENDMENT 0003 IS ISSUED TO: Extend the solicitation due date to 04 December 2025.-----AMENDMENT 0004 IS ISSUED TO: UPDATE SECTION 00 21 00, IN ATTACHMENT 5.-----AMENDMENT 0005 IS ISSUED TO: INCLUDE PROJNET BIDDER INQUIRIES/GOVERNMENT RESPONSE IN ATTACHMENT 7. | 71% | Solicitation | 12/04/2025 |
Additional Details
Solicitation Number
W9123823B0014
Archive Date
May 18, 2023
Office Address
SACRAMENTO, CA, 95814-2922