Notice ID: c527a38ddbe24fd39f83a6d44f6e6660Sources Sought
WATMAN STREAMFLOW SATOC IDIQ
Archived. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM UTC−05:00
- Posted
- January 9, 2023
- Notice type
- Sources Sought
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 541990: All Other Professional, Scientific, and Technical Services
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W075 ENDIST SACRAMENTO
- Place of performance
- Sacramento, CA, 95814
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- W9123823R0020
- Notice ID
- c527a38ddbe24fd39f83a6d44f6e6660
Description
SOURCES SOUGHT SYNOPSIS - W9123823R0020 Title: Sources Sought for Single Award Task Order Contract (SATOC) Indefinite Delivery Indefinite Quantity (IDIQ) for the WATMAN STREAMFLOW Measurement and Weather Station Maintenace for both SPK and SPN sites. This is a SOURCES SOUGHT SYNOPSIS for MARKET RESEARCH purposes only. The Government intends to solicit a soliciation as a Small Business Set-Aside with the intent of awarding a Firm-Fixed-Price (FFP) base IDIQ contract. Two FFP seed task order contracts will be awarded from this base; one for SPK and one for SPN. DISCLAIMER: THIS SOURCES SOUGHT ANNOUNCEMENT IS FOR INFORMATIONAL PURPOSES ONLY. THIS IS NOT A REQUEST FOR PROPOSAL. IT DOES NOT CONSTITUTE A SOLICITATION AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT. RESPONSES IN ANY FORM ARE NOT OFFERS AND THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. NO FUNDS ARE AVAILABLE TO PAY FOR PREPARATION OF RESPONSES TO THIS ANNOUNCEMENT. ANY INFORMATION SUBMITTED BY RESPONDENTS TO THIS SOURCES SOUGHT ANNOUNCEMENT IS STRICTLY VOLUNTARY. NO SOLICITATION, SPECIFICATIONS, OR DRAWINGS ARE AVAILABLE AT THIS TIME OTHER THAN WHAT IS POSTED WITH THIS NOTICE. REQUIRED KNOWLEDGE: Please see attached draft Performance Work Statement. BRIEF DESCRIPTION (see attached PWS for full description): This contract is for the performance of discharge measurements, rating-curve development, general maintenance and repair, and quality-controlled record work-up for streamflow and weather stations located throughout CA and contained within the U.S. Army Corps of Engineers (USACE) Sacramento District (SPK). Streamflow stations are in the northern and southern central valley and the foothills and mountains of the Sierra Nevada and northern Coastal Ranges. Discharge measurements need to be taken from a variety of cross-sections, including, bridges, cableways, or wading-based approaches and may be required during periods of high flow. Stream stage measurements are made using a range of automated sensors and station set-ups. General maintenance, repairs, and upkeep is required for both streamflow and weather stations. Weather stations are located throughout the northern and southern central valley, as well as the Sierra Nevada and northern Coastal Ranges, including high-elevation remote locations only accessible via helicopter or pack animal travel. The weather stations range in complexity with regards to meteorological observations. Weather stations in mountainous locations and foothills record air temperature, precipitation, and/or snow depth and snow water equivalent. Weather stations located at USACE-owned reservoirs measure air temperature, barometric pressure, incoming/outgoing radiation, precipitation, relative humidity, and wind-speed and wind-direction. ADDITIONAL INFORMATION: NAICS: 541990 - All Other Professional, Scientific and Technical Services Product Service Codes (PSC): B599, SPECIAL STUDIES/ANALYSIS- OTHER The solicitation is anticipated to be issued through the Governmentwide Point of Entry (GPE) (www.SAM.gov); date: TBD. Please do not request a copy of the solicitation, or additional plans and specifications, as they are not currently available. Draft plans and specifications will be made available for inspection without charge after the solicitation is released, when requested and delivered by electronic mail and/or data interchange. The solicitation will be made available without charge when accessed through the GPE or requested and delivered by electronic mail and/or data interchange. PLEASE NOTE: this project and/or the proposed solicitation and contract action may be changed, delayed, or canceled at any time. INTERESTED FIRMS: In your response please include the following information: -Firm's name, address, point of contact, phone number, and e-mail address -Firm's CAGE and Unique Entity Identifier (UEI) numbers if applicable -Firm's interest in bidding on the solicitation when it is issued -Firm's Capability Sheet as it relates to this project - Provide Example Projects: Provide at least two (2) but no more than three (3) example projects demonstrating experience with work similar to that described within the PWS. Include a brief description of the project, customers agency name and POC, period of performance, and dollar value -Firm's Business Size category: Other-Than-Small Business, Small Business, HUB Zone, Veteran Owned Small Business, Women Owned Small Business, 8(a) etc. -Firm's Joint Venture information if applicable. Interested Firms shall respond to this Sources Sought Synopsis no later 24 January 2023, 10:00 AM Pacific Standard Time. Please send responses via email to: Daniel E. Czech at Daniel.E.Czech@usace.army.mil and Davina Darden at davina.d.darden@usace.army.mil Firms must be registered in betaSAM.gov to be eligible for award of Government contracts.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W9123823R0020- Market Research
Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)
- 3×Market ResearchCurrentJan 9, 2023
WATMAN STREAMFLOW SATOC IDIQ
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
AMENDMENT 02 IS TO POST ATTACHMENTS 08 and 09 - Site Visit notes and Sign-in Sheet. NO CHANGES ON THE RFQ DATE AND TIME OF SUBMISSION. NO CHANGES ON THE TERMS AND PROVISIONS. X:NOGRN, SERVICE, MURAL MAINTENANCE AND COLOR INVESTIGATION AT THE AQUATIC PARK BATHHOUSE, SAFR. | - | Combined Synopsis | 06/18/2026 |
The U.S. Army Corps of Engineers (USACE), Caribbean District issues this Request for Proposals (RFP) to award an Indefinite Delivery Indefinite Quantity (IDIQ) Single Award Task Order Contract (SATOC) for Quality Assurance Services across Puerto Rico and the U.S. Virgin Islands. This procurement follows the presolicitation notice previously synopsized under solicitation number W51DQV26RA007. The contractor shall provide comprehensive quality assurance oversight supporting Civil Works, International and Interagency Services (IIS), and Military Construction (MILCON) projects, including navigation, flood risk management, coastal protection, environmental restoration, water resources, and military or federal installations. Services encompass monitoring contractor compliance with plans and specifications, reviewing engineering submittals and technical reports, conducting on-site field inspections of dams, levees, berms, cutoff walls, pump stations, flood control gates, and electrical systems, and performing certified sampling and laboratory testing of soil, concrete, and water. Contract personnel shall also perform daily safety monitoring and prepare daily quality assurance inspection reports. This action is a total small business set-aside under NAICS code 541990 (All Other Professional, Scientific, and Technical Services) with an applicable small business size standard of $19.5 million. The contract ordering period comprises a one-year base period, four 12-month option periods, and one six-month option period, not to exceed a total duration of five years and six months, with a maximum program capacity of $35 million across the contract life. | - | Solicitation | 11/20/2026 |
****AMENDMENT 0002: ADDS PRESOLICTATION PROJNET INSTRUCTIONS AND SLIDE DECK FORM INDUSTRY DAY PRESENTATION 3NOV26BE advised that oral statements and representations made during the Industry Day, and the information contained in the attached slide deck, at any time or prior to the award of the contract are not binding upon the Government unless reduced to writing and expressly incorporated into the solicitation or award. | - | Pre-Solicitation | Open |
*** 11/03/2026: AMENDMENT 06 ISSUED - SEE SUMMARY OF AMENDMENT AT BOTTOM OF POSTING*** ***SUMMARY ONLY - SEE ATTACHED COMBINED SYNOPSIS/SOLICITATION DOCUMENT FOR FULL DETAIL*** APS _ Combined Synopsis/Solicitation Brief: Combined Synopsis/Solicitation for Commercial Items Agile Professional Services ("APS”) Department of the Army Project Name: Agile Professional Services ("APS") Solicitation Number: W900KK-26-R-A023 NAICS Code: 541990 (All Other Professional, Scientific, and Technical Services) Set-Aside: Total Small Business Set-Aside Contract Type: Labor Hours/T&M 1. General Information This combined synopsis/solicitation is issued by Army Contracting Command - APG - Orlando Division to procure Agile Professional Services ("APS"). The acquisition is structured to support critical technical and professional operations under a flexible framework, to be proposed and developed by the successful offeror. Key acquisition parameters include: • Set-Aside Status: 100% Total Small Business Set-Aside. • Small Business Size Standard: $19.5M, or as defined by SBA regulations. • Primary NAICS Classification: 541990 — All Other Professional, Scientific, and Technical Services. • Contract Vehicle Type: Labor Hours/T&M 2. Solicitation Details This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. This combined synopsis/solicitation is prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2025-06, effective August 27, 2025.and DFARS Publication Notice (DPN) July 2, 2026. As described in the attached FAR 52.212-2, The Army will adopt aspects of FAR Part 15 evaluation procedures. Considering the novel, and commercial, nature of these services this is deemed necessary to balance fairness, transparency, and competition with the interests of expediency and flexibility 3. Description of Requirement CPE ST3 has a need for Agile Professional Services (APS) support services to provide the organization with the ability to augment its Military and Government Civilian workforce in order to execute its mission. The services will be limited to providing professional support services, under a Performance Based Services model, to CPE ST3 and CPE ST3 customers for limited requirements which are related to CPE ST3’s mission. Since its inception, CPE ST3 has relied on contractor support to conduct its mission in all phases of life cycle management due to insufficient personnel within the organization to successfully perform the required services. This model of a Government footprint with a scalable contractor workforce has enabled CPE ST3 to be very flexible and agile in its mission to support the changing needs of the Army. The services to be performed will include related activities in support of all aspects of providing responsive integrated and interoperable infrastructure for simulation, training, testing, and threat solutions. APS support services are required for effective, efficient, and responsive full lifecycle management of efforts to include, but not limited to: vision statements and doctrine, development of architectures, program support (e.g., acquisition and budget planning, business and financial programming and execution, modeling, simulation, simulator, training device, and instrumentation development, documentation, fielding and execution, system analysis and integration, integrated logistics support, strategic planning, contingency and mission support, security cooperation/international relations, program oversight, independent verification validation and test evaluation, prototype development, sustainment and operations, and analysis of emerging technologies support), and subject matter experts on military tactics, techniques, and procedures. Potential areas of growth are envisioned but not limited to be in the areas of Cyber and Information Warfare, Robotics, Unmanned Vehicles, Home Station Training, Multi-Sensory Simulation, Artificial Intelligence, Hypersonics, Directed Energy, Electronic Warfare, Autonomous Systems, Multi-Domain Integration, Target and Threat Systems, Environment Modeling, Human Performance Training, Security Cooperation, Nuclear Engineering, and Medical Training. The critical performance requirement is the successful development and transition of CPE ST3 from a traditional, staffing-based support model to a task-based, outcome-driven Agile delivery framework that is to be developed by the Performer. Success will be measured by the contractor's ability to develop and iterate, through performance under the resultant contract, a framework that both provides the following, and is able to be replicated across future requirements. 4. Period of Performance / Performance Locations: Total Performance Period shall not exceed 66-months: Base Period – (15-Mar-27 to 14-Sep-27) Agile Development and Transition In Option Period 1 – (15-Sep-27 to 14-Sep-28) – Enterprise Performance Option Period 2 – (15-Sep-28 to 14-Sep-29) – Enterprise Performance Option Period 3 – (15-Sep-29 to 14-Sep-30) – Enterprise Performance Option Period 4 – (15-Sep-30 to 14-Sep-31) – Enterprise Performance Option Period 5 – (15-Sep-31 to 14-Mar-32) – Enterprise Performance and Transition Out Option Period 6 – (15-Mar-32 to 14-Sep-32) – Option to Extend the Term of Service under FAR 52.217-8 * Work will be performed at Government facilities, Contractor facilities, and Remote locations. Primary Government sites include Orlando, FL, and Redstone Arsenal, AL (including 24/7 operations). Additional Government sites include: Fort Campbell, KY; Fort Hood, TX; Fort Drum, NY; Fort Irwin, CA; Fort Polk, LA; Fort Rucker, AL; Fort Bragg, NC; Hohenfels, Germany; and Camp Humphreys, South Korea. 5. Applicable FAR Provisions/Provisions: See Attachment 7. The provisions and clauses apply to this acquisition and are incorporated by reference or full text as applicable. The full text of the FAR and DFARS clauses may be accessed electronically at https://www.acquisition.gov/. 6. Proposal Submission Instructions Phase I responses to this solicitation are due by 28 October 2026 / 10:00am (Eastern). Submission due dates for all subsequent Phases will be issued via Advisory Notifications / Invitations. a. Electronic Submission Requirement All proposals must be submitted electronically via the Department of Defense Secure Access File Exchange (DoD SAFE) application at https://safe.apps.mil . Hardcopy submissions or proposals sent directly via standard email will not be accepted. b. Requesting a DoD SAFE "Drop-off Request" Link Because guest (non-government/commercial) users cannot initiate file uploads on DoD SAFE without a government-issued invitation, all offerors must request a "Drop-off Request" link . The Request Process: To receive an upload link, the offeror must send an email to ST3ProfessionalServices@army.mil. The Cut-off Deadline: Requests for a DoD SAFE drop-off link must be received no later 10:00am Eastern on 27 October, 2026. Link Validity: Once the Government processes your request, you will receive an automated email from DoD SAFE containing a unique link and instructions. This link is valid for exactly 14 days from the date of receipt. WARNING: The Government will not be held responsible for late proposals resulting from an offeror's failure to request a drop-off link by the established deadline. c. Submission Protocol Upon receipt of the automated DoD SAFE email link: Click the link inside the automated email to access the secure upload portal. Upload all required solicitation attachments, ensuring they are named clearly. Click "Submit" or "Drop-off" to complete the upload process. d. Timeliness of Submissions The Submission Timeframe: For a submission to be considered timely, the completed DoD SAFE upload must be finalized, and the automated system notification must arrive in the Government recipients' inboxes on or before the official Proposal Due Date and Time. Upload Buffer: Depending on your network speed and the size of your proposal volumes, uploads can take time. Offerors are highly encouraged to start their upload several hours before the deadline. Technical difficulties, network latency, or Offeror delays in upload initiation will not be used as a justification to accept late submissions. * Late Submissions: Late submissions will be handled in accordance with FAR 52.212-1(f). See FAR 52.212-1, Instructions to Offerors — Commercial Items; for proposal submission instructions. 7. Additional Information i. Questions: The deadline to submit questions for this RFP has passed. ii. Security Clearance Requirements: See DD254 for specifics. a. Probable Facility Clearance without Storage b. Probable Secret, Top-Secret, and TS/SCI requirements for certain employees. 8. Attachments: i. Statement of Objectives (SOO), dated 8 September 2026 ii. FAR 52.212-1 – Instructions to Offerors - Proposal Submission instructions iii. FAR 52.212-2 – Evaluation Criteria – Evaluation Plan iv. Wage Determinations a. WD 2015-4377 REV 33 20260820 NC b. WD 2015-4553 REV 31 20260730 FL c. WD 2015-4603 REV 34 20260820 AL d. WD 2015-4631 REV 34 20260812 AL e. WD 2015-4719 REV 34 20260812 KY f. WD 2015-5197 REV 33 20260812 LA g. WD 2015-5237 REV 32 20260812 TX h. WD 2015-5629 REV 29 20260513 CA i. WD 2015-5775 REV 32 20260812 NY v. PWS Template vi. QASP Template vii. Provisions and Clauses viii. CDRLs a. A001 – Contractor’s Progress and Status Report b. A002 – Phase-Out Transition Plan c. A003 – Agile Dashboard d. A004 – Agile Management Plan ix. DD 254 a. SAP Addendum (incorporated into Attachment 9 (“ix.”)) b. SCI Addendum (incorporated into Attachment 9 (“ix.”)) x. APS Pricing Workbook xi. Army DSO JIRA Settings (TO BE PROVIDED PRIOR TO PHASE II PROPOSAL SUBMISSIONS) xii. Compliance Matrix (Government Format) Acknowledgement of Amendments: 1. Amendment 01: The purpose of this amendment was to provide Attachment-6_Quality_Assurance_Surveillance_Plan_(QASP)_Proposal_Template_-_APS_20260903 2. Amendment 02: The purpose of this amendment was to do provide responses to Industry questions, to revise the Combined Synopsis/Solicitation, to provide for revised submission dates, and to provide updated Attachments 1, 2, 3, 4.e, 5, and 10. 3. Amendment 03: The purpose of this Amendment was to update the proposal submission instructions incorporating submission requirements and instructions for the use of DOD SAFE as the sole method of submission. 4. Amendment 04: The purpose of this amendment was to update the Combined Synopsis Solicitation, Proposal Submission Instructions -1, Evaluation -2, and the Pricing Workbook for clarity and changes to Phase II information. This amendment does NOT impact the Phase I Proposal Submission Requirements / Deadline. 5. Amendment 05: The purpose of this Amendment was to update the following: 1) Revise Section 7 (Proposal Submission Instructions) of the Combined Synopsis/Solicitation Attachment, updating the DoDSAFE "drop request" date, updating the submission due date; and 2) Revise Section 6 of the SAM.Gov posting to reflect the above. 6. Amendment 06: The purpose of this Amendment was to update the following: a) Revise Attachment 10 – APS Pricing Workbook with revised Periods of Performance, b) Revise and incorporate the Government’s required template for Attachment 12 – Compliance Matrix, c) Revise Attachment 02 - FAR 52.212-1 – Instructions to Offerors - Proposal Submission instructions with the Government’s required template usage for Attachment 12 – Compliance Matrix, d) Revise Attachment 03 - FAR 52.212-2 – Evaluation Criteria – Evaluation Plan with the Government’s required template usage for Attachment 12 – Compliance Matrix, and e) Revise Section 5 of the SAM.Gov posting for the Period of Performances and Government’s Tentative Milestone Schedule. **SUMMARY ONLY - SEE ATTACHED COMBINED SYNOPSIS/SOLICITATION DOCUMENT FOR FULL DETAIL*** | - | Combined Synopsis | 10/28/2026 |
This is Amendment 02.... The purpose of this posting is to notify all interested parties of the release of Amendment 02 for the TRIOSS II Request for Proposals (RFP). This amendment is to clarify some information that the Program Team believes is necessary to make sure all Offerors understand the information that was put out on the last amendment. 1. The Government does intend to award the contract in December 2026. The start date for the contract is going to be the first date of the base period of performance, which is 01 March 2027. This date is the day the Offeror’s proposed phase-in period will start. No work for this contract shall be paid for before the start of the PoP. To note this, Section H on the SF33, along with attached Sections L, M, and the PWS have been update. These sections that have been changed are uploaded today as (Amendment 02) and the wording that changed is highlighted in red. 2. The Government has updated the answers to questions 17, 25, and 32 on Attachement 07. 3. The Government wanted to point your attention to the answer in question 24, Under the Wage Determinations the classifications that are currently being used is under the 15000- Instructional Occupations Series. 15090-Technical Instructor. The section L.3.3.18 was updated on Amendment 01. Please see attachements..... ______________________ ______________________ The U.S. Army Contracting Command (ACC-APG) Orlando Contracting Division (OCD), on behalf of the Capability Program Executive Office Simulation, Training, Test & Threat (CPE ST3), is officially announcing the soliciting proposals for the TRAINING INSTRUCTOR OPERATOR SERVICES SUPPORT II (TRIOSS II). This requirement is to procure continuous, uninterrupted I/O support for the MSTCs as well as support for other miscellaneous courses and training events located at Army MSTCs throughout the CONUS and OCONUS. The anticipated contract is for a single award Firm Fixed Price Mandatory Minimum Staffing Baseline (MMSB) contract which has a base period and four 1-year option periods. Detailed instructions, performance work statements, and submission guidelines are fully detailed within the attached solicitation W900KK-27-R-A003. Proposals are due 09 November 2026 at 09:00 EDT. Late submissions will not be considered for evaluation. All questions must be received no later than 15 October 2026 at 11:00 AM Eastern Standard Time (EST), see Section L for submission instructions. Notice of Intent (Requested): To assist the Government in administrative preparations and oral presentation scheduling, all interested Prime Contractors intending to submit a proposal are requested to notify the Government via email at usarmy.orlando.cpe-st3.mbx.trioss-ii@army.mil within one (1) week of this posting. Note: This notification is voluntary and does not preclude the evaluation of any timely received proposal. Oral Presentations: Will be scheduled for in-person presentations at ACC-APG Orlando Contracting Division in Orlando, Florida and will be coordinated with Offerors after all proposals have been received, logged and reviewed to be compliant. | - | Combined Synopsis | 11/09/2026 |
Additional Details
Solicitation Number
W9123823R0020
Archive Date
Not specified
Office Address
SACRAMENTO, CA, 95814-2922