GovChime
Notice ID: 7d4bca43924b52162497afb58d5c46b1Solicitation

Z--The Mission and Installation Contracting Command- Presidio of Monterey (MICC-POM) has a new requirement to install HDPE pipe to collect and convey storm water into the existing natural drainage channel.

Archived on September 18, 2012. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
7:00 AM UTC+02:00
Posted
July 11, 2012
Notice type
Solicitation
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
Agency
Department of WarDepartment of the Army

Notice details

Office
W6QM MICC-PRESIDIO (RC-W)
Place of performance
Camp Parks Parks Reserve Forces Training Area Building 331 Dublin CA 94568 US
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 5, 2025

Identifiers

Solicitation number
W9124N12R0081
Notice ID
7d4bca43924b52162497afb58d5c46b1

Description

The Mission and Installation Contracting Command- Presidio of Monterey (MICC-POM) has a new requirement to install two (2) twenty four (24) inch square traffic rated grate inlets and approximately two hundred (200) lineal feet of HDPE pipe to collect and convey storm water into the existing natural drainage channel east of the project location on Government owned land at Camp Parks, Parks Reserve Forces Training Area, Dublin, California. Solicitation W9124N-12-R-0081 will be available on or about 5 July 2012. A SITE VISIT is scheduled for 10 July 2012 at 10:00 AM (Pacific Time). Site Visit Location: Camp Parks, Parks Reserve Forces Training Area, Dublin, California. Please meet near pedestrian foot bridge at North West side of Building 340 North Parking Lot. From the main gate, travel North on Camp Parks Blvd, turn left on 4th Street, right on Davis Ave. go past building 340, the parking lot will be on your left in between 9th Street and 10th Street. The Site Visit Point of Contact (POC) is Ms. Patty Skinner, Office Phone: (925) 875-4626. Proposals are due 20 July 2012 at 2:00 PM (Pacific Time) This acquisition is a 100 percent set aside for Service Disabled Veteran Owned Small Businesses (SDVOSB) only. The North American Industry Classification System (NAICS) code for this project is 238910 with a size standard of $14 Million. Performance period is 45 calendar days after issuance of the Notice to Proceed (NTP). Estimated magnitude for this project is less than $25,000. Payment and performance bonds are not required for this project. The contract will be a single award, Firm-Fixed-Price type contract. Solicitation number W9124N-12-R-0081 will be available on or about 5 July 2012 on the Federal Business Opportunities (FBO) website (http://www.fbo.gov) and the Army Single Face to Industry (AFSI) website (https://acquisition.army.mil/asfi/). For information on how to register your company on FBO, to view or receive updates and notifications to the solicitation, please reference the FBO Vendor Guide located on the FBO web site home page. NO paper copies of the solicitation will be furnished. Prospective contractors must be registered in the Central Contractor Registration Database (www.ccr.gov), prior to award of a government contract. Offerors are further advised that failure to register in the Central Contractor Registration Database will render your firm ineligible for award. Registration requires applicants to have a DUNS number. Recommend registering immediately in order to be eligible for timely award. The point of contact for this requirement is Jeff Post, jeff.post1@us.army.mil.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Jeffrey M Post, 831-242-6560 MICC - Presidio of Monterey (RC - West)

Documents

No documents available.

Lifecycle

Solicitation:W9124N12R0081
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    Pre-SolicitationJun 18, 2012

    Z--The Mission and Installation Contracting Command- Presidio of Monterey (MICC-POM) has a new requirement to install HDPE pipe to collect and convey storm water into the existing natural drainage channel.

    Notice 0f875611165d80b4d5288cea1359153e on SAM.gov

  2. SolicitationCurrentJul 11, 2012

    Z--The Mission and Installation Contracting Command- Presidio of Monterey (MICC-POM) has a new requirement to install HDPE pipe to collect and convey storm water into the existing natural drainage channel.

    Notice 7d4bca43924b52162497afb58d5c46b1 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W9124N12R0081

Archive Date

Sep 18, 2012