Y--Pre-solicitation Notice 2-Step Design Build Best Value Trade-off for Operational Training Complex (ORTC) at Fort Hood ,Texas

Archived on May 8, 2012. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
7:00 AM UTC+02:00
Posted
April 4, 2012
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Agency
Department of WarDepartment of the Army

Notice details

Office
W076 ENDIST FT WORTH
Place of performance
USACE District, Fort Worth PO Box 17300/819 Taylor Street, Fort Worth TX 76102-0300 US
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 5, 2025

Identifiers

Solicitation number
W9126G12R0002
Notice ID
4f4c7b2e63112e2f2db3bc7debb52400

Description

NOTE: This is a SOURCES SOUGHT Inquiry for the purpose of obtaining market research only. Proposals are being requested nor accepted under this synopsis. The U.S. Army Corps of Engineers, Fort Worth District, will use information obtained under this synopsis to develop an acquisition strategy to meet a needs of the U.S Army for an Operational Readiness Training Complex at Fort Hood, TX, SATOC C-type contract, Two Phase design build. The intent of this synopsis is to access industry's of large and small business size for interest in performing construction work for the following buildings for the design and construction of: one (1) standard design Transient Training Battalion Headquarters, one (1) transient Non-Commissioned Officers and one (1) Officers Quarters, transient Barracks; with building information systems, fire protection and alarm systems, and energy monitoring and control systems (EMCS) connection. Sustainable design and development and Energy Policy Act of 2005 features shall be included. Supporting facilities include site infrastructure upgrade, utilities and connections, lighting, paving, parking, walks, storm drainage, landscaping, and signage. The site infrastructure work included in this project consists of constructing new primary infrastructure utility systems to support the new ORTC facilities utility requirements, construct new POV parking lots, fire & emergency access lanes, roads, sidewalks, and landscaping. The work includes the construction of new water distribution mains including a new 250,000 gallon elevated water tower, sewer mains, gas distribution mains, and electrical/communication ductbanks. There will be demolition and relocation of portions of the existing utility systems to clear the sites for the new facility, utility, & infrastructure construction. Heating will be provided by self contained system. Estimated air conditioning is 778 tons. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards shall be provided. Comprehensive building and furnishings related interior design services are required. The anticipated North American Industry Classification System (NAICS) codes for this program is 236220, Commercial and Institutional Building Construction with a corresponding Standard Industrial Code (SIC) of 1542. Magnitude of Project ($25,000,000 to $100,000,000. The anticipated solicitation issuance date is on or about October 24, 2011 and the estimated proposal due date will be on or about November 25, 2011. Award is anticipated in April, 2012. Construction duration is limited to 720 calendar days. The proposed construction project will be a Firm Fixed Price contract. The solicitation will be a TWO PHASE design build Request for Proposal with the contract awarded based on a "Best Value" evaluation of contractor qualifications and prices. Offeror's response to this Synopsis shall be limited to 5 pages and shall include the following information: (1) Company Name, Address, City, State and Zip. Point of Contact, Telephone and Fax Numbers, Email, DUNS and Bradstreet Number, Cage Code, Federal Tax Identification Number and include the Small Business Administration (SBA) District Office. (2) Provide a narrative to describe your firms recent and relative construction experience and past performance delivering similar requirements; recent and past construction work in the area state; recent and relevant experience with federal government work preferred as described above to meet the Air Force Program needs. (3) Provide a narrative to identify which SBA identified regions(s) your firm is located and interested in providing the required construction services. Include in your narrative the maximum contract amounts your firm is capable of providing and whether or not your firm can provide the anticipated minimum bonding capacity of $25, million. (4) Provide a listing of sub-contractors and their size. (5) Provide a listing of your network suppliers/ subcontractors that you anticipate using to meet the above Army Program needs. (6) Provide a narrative to describe any industry concern/ constraints regarding the ability to execute the Army Program requirements at Ft Hood, Texas (7) Provide information as stated above if this would be a joint-venture for any or all firms involved. (8) Offeror's Business Size (9) Letter of Bonding Capability from Surety for Construction bonding level per contract and aggregate construction bonding level, both expressed in dollars. All responses received under this sources sought synopsis will be considered. Responses to this synopsis is limited to the above nine elements. No additional information shall be submitted. The submissions may be submitted electronically in PDF via email. The contractor is responsible to ensure the file will open correctly. Interested Offerors shall respond to this Sources Sought Synopsis by responding to ladell.p.barnes@usace.army.mil by 2:00 pm Central Standard Time, October 21, 2011. The Point of Contact for this action is LaDell P. Barnes, Contract Specialist, Fort Worth District Corps of Engineers, at 817-886-1162. IF YOU SUBMITTED A RESPONSE TO ANY PREVIOUS SOURCES SOUGHT NOTICES FOR A SIMULAR MILCON SPONSORED CONTRACTS, YOU ARE REQUIRED TO PLEASE PREPARE A NEW CAPABILITY NARRATIVE AS REQUESTED UNDER THIS SYNOPSIS. RESPONSES TO ANY PREVIOUS SYNOPSIS WILL NOT BE CONSIDEREED UNDER THIS ANNOUNCEMENT.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

ladell barnes, 817 886 1162 USACE District, Fort Worth

Documents

No documents available.

Lifecycle

Solicitation:W9126G12R0002
  1. Market Research
  2. Pre-Solicitation
  3. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 4×
    Pre-SolicitationSep 29, 2011

    Y--Pre-solicitation Notice 2-Step Design Build Best Value Trade-off for Operational Training Complex (ORTC) at Fort Hood ,Texas

    Notice c0b9e427ef5ba466b6a8f5cace874619 on SAM.gov

  2. Market ResearchOct 11, 2011

    Y--Operational Readiness Training Complex, Ft Hood TX

    Notice cb5dcecb85d30c4659b79c10372ed0fc on SAM.gov

  3. 6×
    Pre-SolicitationDec 23, 2011

    Y--Pre-solicitation Notice 2-Step Design Build Best Value Trade-off for Operational Training Complex (ORTC) at Fort Hood ,Texas

    Notice 62571c4579f8b8855beecd7d3c94be0e on SAM.gov

  4. SolicitationCurrentApr 4, 2012

    Y--Pre-solicitation Notice 2-Step Design Build Best Value Trade-off for Operational Training Complex (ORTC) at Fort Hood ,Texas

    Notice 4f4c7b2e63112e2f2db3bc7debb52400 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W9126G12R0002

Archive Date

May 8, 2012