GovChime
Notice ID: 37488fe2fbd1a1e3353cc5adfe31a408Combined Synopsis/Solicitation

Mauriceville Temporary Classroom Project

Archived on December 1, 2017. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:00 PM UTC−06:00
Posted
November 15, 2017
Notice type
Combined Synopsis/Solicitation
NAICS
532490: Other Commercial and Industrial Machinery and Equipment Rental and Leasing
Agency
Department of WarDepartment of the Army

Notice details

Office
W076 ENDIST FT WORTH
PSC
54: PREFAB STRUCTURES/SCAFFOLDING
Last updated
Sep 10, 2025

Identifiers

Solicitation number
W9126G18Q0006
Notice ID
37488fe2fbd1a1e3353cc5adfe31a408

Description

The project's scope of work is as follows: The contractor shall install forty (40) classrooms and two (2) restroom structures on the western parking lot on the northern side of the school, ten (10) of these shall have a ADA compliant restroom located in the classroom. For units which will require placement on the grass to the north of the school the contractor shall place geotextile on the ground surface and cover with 12" of class 5. Units shall be connected to the water/sewer services at the locations indicated on the drawings and make all required connections to the structure(s). The contractor shall also place sixteen (16) classrooms and one (1) restroom structure on the eastern parking lot on the northern side of the school. Units shall be connected to the water/sewer services at the locations indicated on the drawings and make all required connections to the structure(s). The contractor will tie into the overhead electrical service at the location specified and install ground based transformers to power each of the classroom/restroom groups in accordance with local and state codes. All structures shall be double blocked and installed in accordance with the manufacturer's recommendations and Federal, State, and local codes. Structures shall be installed at a height so as to clear the existing light pole foundations. Poles may be removed from foundations to ease installation. Raised walkways shall be installed connecting all the structures in each group. The walkway shall have ADA compliant ramps and stairs on side of the group. Raised coverings shall be installed over all walkways and one covered path shall be installed connecting each group to the main school building. The base lease period for the classroom and restroom structure leases will run for six (6) months from the install deadline (Jan 3 2018 - Jun 02 2018). There are seven (7) option periods. The first runs for an additional (6) months (Jun 03 2018 - Dec 02 2018) followed by six (6) one (1) month option periods. The Corps has established a conceptual layout to fit the number of classrooms and restroom facilities required into the areas available. The contractor is allowed to propose an alternative layout to accommodate the schools needs as long as they're able to fit the classroom/restrooms in the area's defined on the drawing. See contract clause 52.212-2 for more information.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W9126G18Q0006
  1. Combined Synopsis
  1. 10×
    Combined SynopsisCurrentNov 4, 2017

    Mauriceville Temporary Classroom Project

    Notice 37488fe2fbd1a1e3353cc5adfe31a408 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W9126G18Q0006

Archive Date

Dec 1, 2017

Office Address

FORT WORTH, TX, 76102-6124