Notice ID: bf84ab0faf8349a5bcce9b8ea09323c4Solicitation
Hammerhead Barracks Renovation, Fort Hood, TX
Archived on September 30, 2020. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−05:00
- Posted
- June 1, 2020
- Notice type
- Solicitation
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W076 ENDIST FT WORTH
- Place of performance
- Fort Hood, Texas, Fort Hood, TX
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W9126G20R0017
- Notice ID
- bf84ab0faf8349a5bcce9b8ea09323c4
Description
This is the Phase 1 solicitation. Phase 1 proposals are due 08 April 2020. CONTRACT INFORMATION: This announcement is an unrestricted acquisition to revitalize/renovate five existing Hammer Head Barracks (B10009, B10010, B10011, B10016, B10018) and One Central Energy Plant (CEP B10017) at Fort Hood, TX. The Contract will include both Design and Construction of the required renovations. The North American Industrial Classification System code is 236220, which has a size standard of $39.5 million. A firm-fixed-price contract will be negotiated. The contract is anticipated to be awarded in August 2020. To be eligible for contract award, a firm must be registered with the System for Award Management (SAM) database. Register via the SAM Internet site at https://www.sam.gov/. No state level certifications will be accepted. PROJECT INFORMATION: Construction range is between $25,000,000 and $100,000,000. Five existing Hammer Head Barracks (B10009, B10010, B10011, B10016, B10018) and One Central Energy Plant (CEP B10017) will be renovated at Fort Hood, TX. Each barracks building is 3-Stories, a basement, and includes Company Operations Facilities that contain two arms vaults and chemical room (Gas Mask and similar equipment). Renovations will include: Standing Seam Metal Roofs, Exterior Finishes/EIFS, Interior Finishes(Walls/Ceilings/Floors), New Barracks Floor Plans (2 Bedrooms, 1 Kitchen, 1 Common Area, and 1 Bathroom), New HVAC Systems (Chillers and Cooling Towers for CEP, DOAS, Hydronic Boilers, Fan Coil Units), Plumbing Systems, Fire Protection Systems, Lighting & Electrical Systems, Telecommunication Systems, and Site Improvements (Drainage, Roadway/Sidewalk Upgrades, Utility Upgrades: Electrical, Sanitary Sewer, Domestic Water, and Natural Gas). There are no LEED requirements. This solicitation will be evaluated under the Two-Phase Design Build Process in accordance with FAR 36.3-Two-Phase Design-Build Selection Procedures. In Phase 1, interested firms or joint venture entities (referred to as "Offerors") will submit a proposal demonstrating their past performance and capability to successfully execute this requirement. The Government will evaluate the performance capacity in accordance with the criteria described in the Phase 1 solicitation and intends to select no more than five (5) of the Phase 1 offerors to compete in Phase 2. In Phase 2, the selected offerors will submit a technical proposal and a price proposal. The Government will evaluate the Phase 2 proposals, in accordance with the criteria described for Phase 2 in the solicitation, and award the contract to the responsible offeror, whose proposal conforms with all the terms and conditions of the solicitation and whose proposal is determined to represent the overall “best value” to the Government, considering all technical and non-technical factors including cost or price identified under Phases 1 and 2. 3. SUBMISSION INFORMATION: After solicitation issuance, contractors may view and or download this solicitation, specifications and all amendments at the following internet addresses: beta.sam website (https://beta.sam.gov). Type in the search box the solicitation number W9126G20R0017. The use of the websites requires prior registration. Plans and specifications will NOT be made available in paper format or on compact disc. It is the Offerors responsibility to monitor the beta.sam.gov website and or any other official government website for amendments to the solicitation. You must be registered with the SAM, to receive a Government contract award. Phase1 proposals are anticipated to be due in February 2020. If the Government elects to conduct a pre-proposal conference and site visit for Phase 2, it will be conducted after the Phase 2 selection has been made. The Primary Point of Contract for this project is Paige Stone, Contract Specialist, email is paige.e.stone@usace.army.mil. All questions MUST be received through projnet for record. The Government reserves the right to use only the Internet as notification of any amendments to this solicitation. It is the offerors responsibility to view the websites daily for amendments to the solicitation. Accordingly, prospective contractors may view and/or download the solicitation and all amendments from the beta.sam.gov address after solicitation issuance. Contractors shall register themselves at this website under the solicitation number to receive a copy of the solicitation.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W9126G20R0017- Market Research
- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Market ResearchNov 5, 2019
Hammerhead Barracks Renovation at Fort Hood, TX
- Pre-SolicitationJan 6, 2020
Hammerhead Barracks Renovation, Fort Hood, TX
- 4×SolicitationCurrentMar 6, 2020
Hammerhead Barracks Renovation, Fort Hood, TX
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
SUBJECT: Sources Sought (RFI) – Fort Wolters H Barracks, Mineral Wells, Texas DISCLAIMER. THIS IS A REQUEST FOR INFORMATION (RFI) / SOURCES SOUGHT NOTICE ONLY. This notice is issued solely for market intelligence, information, and planning purposes. It does not constitute a Request for Proposals (RFP), a Request for Qualifications (RFQ), or a commitment by the Government to write, issue, or award an agreement. The Government will not pay for any information or administrative costs incurred in response to this notice. All response costs will be borne solely by the interested party. PURPOSE. The U.S. Army Corps of Engineers (USACE), Fort Worth District, is conducting active public market intelligence to gauge industry interest, capacity, and capability from commercial construction firms, design-builders, and Non-Traditional Defense Contractors (NDCs). The intent is to gather critical feedback regarding advanced commercial construction methodologies, project delivery risks, and acquisition preferences to support our upcoming project delivery selection. ACQUISITION STRATEGY & NON-FAR MODEL. Statutory Authority: This project will potentially be executed as a Progressive Design-Build (PDB) or Design-Build to Budget (DBtB) project utilizing Other Transaction Authority (OTA) pursuant to 10 U.S.C. § 2808a. Non-FAR Environment: Prospective partners are advised that the Federal Acquisition Regulation (FAR) does NOT apply to this procurement. The negotiated, bilateral Other Transaction Agreement will serve as the sole governing contract. Standard FAR clauses are inapplicable, though federal statutory constraints (such as federal fiscal law, criminal statutes, and general civil laws) remain fully applicable. Phased Agreement Mechanics: PBD Procurement Process: Phase 1, Design & Pre-Construction Services, a design-builder will be selected through a qualifications-based selection (QBS) process. The government will then negotiate a fee for Phase 1 services. There is no requirement to submit price proposals or design concepts during the initial selection. Phase 2, Final Design & Construction, is executed via a bilateral modification to the OT Agreement upon successful negotiation of a Guaranteed Maximum Price (GMP) at approximately 65% design maturity. The Agreement contains an "off-ramp" clause allowing the Government to retain the design and procure construction separately if GMP negotiations fail. DBtB Procurement Process: Solicitation and evaluation during Phase 1 focuses on the qualifications, past performance, and integrated Design-Build experience of each offeror. The Government is evaluating the team and not necessarily how the offeror will design the structure. The Phase 1 evaluation results in the selection of three of the most highly qualified, competitive teams to proceed to Phase 2. Phase 2, the Government will issue the final RFP exclusively to the down-selected teams. This RFP includes the validated, performance-based requirements, establishes the firm Construction Cost Limit (CCL), and clearly defines the basic scope. Note: See link to provide industry feedback https://forms.osi.apps.mil/r/ZQ8Rm8MaN7 | 97% | Market Research | 11/04/2026 |
PN 100948 and 94937 Barracks, Fort Hood, Texas. This is a SOURCES SOUGHT notice; a market survey for information only for additional Project Labor Agreement (PLA) replies. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS NOTICE. | 95% | Market Research | 02/10/2026 |
This is a SOURCES SOUGHT notice; a market survey for information only, to be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS NOTICE. No reimbursement will be made for any costs associated with providing information or industry response to this notice or any follow up information requests. Not responding to this notice does not preclude participation in any future procurement. If a solicitation is released, it will be synopsized in the System for Award Management (SAM). It is the responsibility of potential offerors to monitor SAM for additional information pertaining to this requirement. The acquisition strategy will be determined based on responses received from this notice and/or other market research methods. The planned acquisition strategy will be posted in SAM upon completion of market research analysis. The purpose of this notice is to gain knowledge of interest, capabilities and qualifications of industry, to include the Small Business Community: Small Disadvantage Business (SDB), the 8(a) Program, Historically Underutilized Business Zones (HUB-Zone), Service-Disabled Veteran Owned Small Business (SDVOSB), Veteran Owned Small Business (VOSB), or Women-Owned Small Business (WOSB). All are highly encouraged to respond. The U.S. Army Corps of Engineers (USACE), Fort Worth District, intends to solicit and award a contract to construct a UEPH Barracks at Fort Hood. The anticipated acquisition will be competitive, Firm-Fixed-Price (FFP), Design-Bid-Build (DBB), definitive contract. The procurement will be conducted in accordance with RFO 15.103-1, using the Best Value, Tradeoff Process approach. The Government is seeking experienced construction firms to construct UEPH barracks at Fort Hood, Texas. The project will provide permanent party housing for 250 Soldiers in closer proximity to existing unit headquarters and motor pools. The facility will be designed in accordance with current Army standard barracks design criteria. Primary facilities include living and sleeping quarters, bathrooms, storage areas, service areas, a dayroom, a self-contained heating, ventilation, and air conditioning (HVAC) system, building information systems, antiterrorism measures, fire protection and alarm systems, Physical Access Control Systems (PACS), Closed-Circuit Television (CCTV), Energy Monitoring and Control Systems (EMCS) connections, and special foundations. The estimated air-conditioning capacity is 260 tons. Supporting facilities include site development, utilities and connections, exterior lighting, paving, waterway road and pedestrian crossings, parking, sidewalks, curbs and gutters, storm drainage, information systems, landscaping, and signage. The project will include Post-Construction Award Services (PCAS) and comprehensive interior design services related to the building and furnishings. The facility will incorporate accessibility features for individuals with disabilities, cybersecurity measures, sustainability and energy-efficiency measures, and antiterrorism features in accordance with applicable Department of Defense (DoD) minimum antiterrorism standards for buildings. The facility will be designed for a minimum service life of 40 years in accordance with DoD Unified Facilities Criteria (UFC) 1-200-02, including applicable requirements for energy efficiency, building envelope performance, and integrated building systems. The target price range for this project is between $99,000.00 and $121,000,000. The estimated Period of Performance is 1,000 calendar days. The North American Industry Classification System code (NAICS) for this procurement is 236220 – Commercial and Institutional Building Construction, which has a small business size standard of $45.0M. The Product Service Code is Y1FC – Construction of Troop Housing Facilities Respondents are reminded that all construction performance must follow the USACE Safety and Health Requirements Manual (EM 385-1-1), and must also comply with all Federal, State and local laws, ordinances, codes and/or regulations. Anticipated solicitation may be issued within 2nd Quarter of Fiscal Year 2027 with an estimated award of 4th Quarter of Fiscal Year 2027. Small Businesses are reminded that RFO clause 52.219-14 – Limitations on Subcontracting will be applicable to this contract; and to pay specific attention to paragraphs (e)(3) and (g). (e)(3) For General Construction, it (the contractor) will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded. (g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants. (1) In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture. Work performed by the small business protégé in the joint venture must be more than administrative functions. (2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture. Work performed by the 8(a) participants in the joint venture must be more than administrative functions The Supplier Performance Risk System (SPRS) is the Department of Defense, single, authorized application to retrieve supplier performance information. SPRS is a web-enabled enterprise application that gathers, processes, and displays data about the performance of suppliers and must be completed prior to an award in accordance with DFARS 204.76, DFARS 252.204-7020, DFARS 252.204-7024 and DoDI 5000.79. Review NIST SP 800-171 for further information. Contractors are required to achieve, at the time of award, a level 1 Cybersecurity Maturity Model Certification (CMMC). Contractors are required to maintain a current (ie., not more than 3 years old) CMMC at the specified level throughout the life of the contract. See Provision 252.204-7025 and DFARS Clause 252.204-7021. Responses from firms interested in this notice shall not exceed 10 pages and shall include the following information: 1. Firm’s name, UEI #, CAGE Code, address, point of contact, phone number, and e-mail address. 2. Firm’s interest in bidding on the solicitation when it is issued. 3. Firm’s experience to perform the magnitude and complexity outlined in the Scope of Work above by providing: Brief description of the project, customer name, and dollar value of the project – provide UP TO 3 examples. 4. Firm’s Business Size – LB, SB, 8(a), HUBZone, SDVOSB, or WOSB. 5. Will the firm submit a response as a Joint Venture or other arrangement? If YES, specific type: Joint Venture, Mentor-Protégé, Teaming Arrangement, or Other 6. Firm’s Bonding Capacity (construction bonding level per contract and aggregate construction bonding level, both expressed in dollars) [via letter from bonding company]. 7. Experience working on Army facilities? This announcement and all information will be issued via the Government Point of Entry, Procurement Integrated Enterprise Environment and Offerors must be active in SAM to be eligible for award of Government contracts. Award will not be issued to non-compliant offerors until SAM Registration is complete, otherwise offerors will not be eligible for award. Interested Firms shall respond to this notice no later than November 11, 2026, at 2:00pm, Central Standard Time. Email your response to Christine Noriega, Contract specialist at christine.noriega@usace.army.mil and Matthew S. Dickson. Contracting officer at matthew.s.dickson@usace.army.mil | 80% | Market Research | 11/11/2026 |
The U.S. Army Corps of Engineers (USACE), CHARLESTON District, is requesting market intelligence information to identify qualified industry partners capable of supporting a potential Repair and Replace, Design Build to Budget, Other Transaction (OT) Agreement under 10 U.S.C. 2808a for the stated Fort Jackson Barracks Replacement, Columbia, SC. See attachments. | 77% | Market Research | 11/20/2026 |
Pre-Solicitation Notice Construct Central Energy Plant, Fort Hood, TX | 76% | Pre-Solicitation | 04/10/2026 |
Additional Details
Solicitation Number
W9126G20R0017
Archive Date
Sep 30, 2020
Office Address
FORT WORTH, TX, 76102-6124