Notice ID: 340c26d5a40b4b79a5fbbad4efc4ed64Presolicitation
Vertical Construction Multiple Award Task Order Contract � 8(a) Set-Aside
Archived on July 1, 2020. Full description on SAM.gov.
Overview
- Posted
- March 2, 2020
- Notice type
- Presolicitation
- Set-aside
- 8(a) Set-Aside (FAR 19.8)
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W076 ENDIST FT WORTH
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- W9126G20R0052
- Notice ID
- 340c26d5a40b4b79a5fbbad4efc4ed64
Description
Solicitation W9126G20R0052 will be issued as a Request for Proposal (RFP) using the procedures outlined in Federal Acquisition Regulation (FAR) Part 15 for Military Construction (MILCON), Sustainment Restoration and Maintenance (SRM), and International and Interagency Services (IIS) for Design-Build (DB) and Design Bid Build (DBB) projects to serve the Southwestern Division (SWD), utilizing a competitive, Firm Fixed Price, (FFP), Multiple Award Task Order Contract (MATOC). The overall construction program will include, but not limited to: dormitories, dining facilities, classrooms, air traffic control towers, munitions training, office space, chapels, operations centers, warehouses, headquarter buildings, vehicle maintenance shops, supply support facilities, barracks, laboratories, instructional buildings, joint operations centers, checkpoints, utilizing the Design-Build (DB) and Design-Bid-Build (DBB) process. The scope of work includes new construction, in addition to maintenance, repairs, and alterations. The package is slated for 8(a) set aside with capacity in the amount of $640.8M. This will support and meet the needs of the SWD Program for FY21. This announcement is restricted to 8(a) firms only. It has been determined that competition will be limited to 8(a) firms located nationwide, and the assigned North American Industrial Classification System (NAICS) Code applicable to this project is 236220, Commercial and Institutional Building Construction, which has a size standard of $39,500,000 in average annual receipts. The RFP is anticipated to be issued on or about 22 April 2020. A firm-fixed price contract is anticipated to be awarded using Best Value Trade Off procedures. No public bid opening procedures are applicable for this solicitation. This MATOC will be administered by the Fort Worth District, U.S. Army Corps of Engineers and will have a base period of twelve (12) months plus four (4) twelve (12) month option periods. This MATOC will be for a total period of up to five (5) years for a maximum total of $640.8M. The Minimum Guarantee amount is $2,500 for the base year. The wages and benefits of service employees (see FAR 22.10) performing under this contract must be at least equal to those determined by the Department of Labor under the Davis-Bacon Act. After solicitation issuance, contractors may view and/or download this solicitation and all amendments at the following internet address: https://beta.SAM.gov.The use of the website requires prior registration at https://beta.SAM.gov.Plans and specifications will not be made available in paper format or on compact disc. It is the Offerors responsibility to monitor the https://beta.SAM.gov website for amendments to the solicitation The Government reserves the right to use only the Internet as notification of any amendments to this solicitation. Moreover, you must be registered with the System for Award Management (SAM), in order to receive a Government contract award. Your SAM record must indicate your firm is eligible for All Awards . You may register with SAM at https://www.sam.gov/.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W9126G20R0052- Pre-Solicitation
Formal solicitation typically follows within 30–60 days. (estimate)
- 2×Pre-SolicitationCurrentMar 2, 2020
Vertical Construction Multiple Award Task Order Contract � 8(a) Set-Aside
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The purpose of Solicitation Amendment 0004 is to execute the following administrative and evaluation updates:1. The optional 6-month extension of services IAW FAR 52.217-8 is hereby removed in its entiretyfrom this solicitation.2. Issue Evaluation Notices (ENs) to each offeror.3. Updated Solicitation Section M, paragraphs 2.3.1 -2.3.2.4. Added FAR Clauses 52.222-33 Alt III and 52.222-34 Alt II to the solicitation. | - | Solicitation | 07/21/2026 |
The U.S. Army Corps of Engineers (USACE), Fort Worth District, on behalf of the Department of the Air Force (DAF), is issuing this Program Solicitation to identify a Design-Build Team for the 91st Cyber Operations Center at Joint Base San Antonio (JBSA), Lackland Air Force Base, Texas. The project involves the design and construction of an approximately 42,000-square-foot, multi-story facility to support the mission requirements of the Air Combat Command 91st Cyber Operations Squadron. The facility will be designed and constructed to meet applicable security and technical standards for a mission-critical cyber operations environment. This acquisition will use a Progressive Design-Build (PDB) delivery model executed under an Other Transaction (OT) Agreement pursuant to 10 U.S.C. § 2808a. The acquisition will be conducted in two phases: Phase 1—Design and Pre-Construction Services: The selected Design-Build Team will collaborate with the Government to refine project requirements, advance the design, validate cost and schedule, and support development of the Phase 2 scope. Phase 2—Construction Packages: Subject to successful Phase 1 performance, successful negotiation, required approvals, authorization, and availability of funds, the Government may authorize subsequent construction packages through Agreement Amendment. Anticipated packages include: Phase 2A—Site/Civil and Early Construction: Site development, civil work, and other early construction activities. Phase 2B—Building Construction: Final design completion and construction of the 91st Cyber Operations Center facility. The Government may authorize additional construction packages, as appropriate. The Government is under no obligation to proceed with Phase 2A, Phase 2B, or any additional package. The Government will use a two-step, qualifications-based selection process: White Paper Submission and Evaluation Pitch Meetings, by invitation only Interested Design-Build Teams are invited to submit a White Paper in accordance with the solicitation and its attachments. The White Paper is the only submission required at this time. White Papers must address all requirements in Attachment 1, Request for White Paper Submission Requirements. Questions: All questions must be submitted through the ProjNet Bidder Inquiry System no later than 11 November 2026, in accordance with the solicitation instructions. White Paper Due Date: White Papers are due no later than 17 November 2026 at 1400 Central Time. Submission Method: Submit White Papers by email to the Solicitation Points of Contact identified in the solicitation. Required Email Subject Line: “White Paper for 91st Cyber Operations Center” Refer to the attached Program Solicitation, Attachment 1—Request for White Paper Submission Requirements, and Attachment 2—Project Requirements Document for the complete project scope, submission instructions, evaluation approach, and applicable requirements. | - | Solicitation | 11/18/2026 |
SPECIAL NOTICE Title: Akeroyd Blood Donor Center Progressive-Design Build, Fort Sam Houston in San Antonio, Texas. The U.S. Army Corps of Engineers (USACE) is issuing this special notice to announce an upcoming solicitation for Progressive Design-Build under 10 U.S.C. 2808a Other Transaction Authority for Construction for the Akeroyd Blood Donor Center at Fort Sam Houston in San Antonio, Texas. This notice is for informational and planning purposes to allow interested parties to prepare for the official solicitation release. See Attachment for Project specific information as well Industry Day registration. | - | Special Notice | 10/27/2026 |
SUBJECT: Sources Sought Notice/RFI – Ready Building, Fort Bliss, Texas DISCLAIMER: This Sources Sought (SS) is for planning and market research purposes only and does not constitute a Request for Proposals (RFP) or an Invitation for Bids (IFB). This notice is issued under the authority of 10 U.S.C. § 2808a (Other Transaction Authority for Construction and Repair) and is not subject to the Federal Acquisition Regulation (FAR). No solicitation is available at this time. The Government will not pay for any information submitted in response to this notice. PURPOSE: The U.S. Army Corps of Engineers (USACE), Fort Worth District, is conducting active public market intelligence to gauge industry interest, capacity, and capability from commercial construction firms, design-builders, and Non-Traditional Defense Contractors (NDCs). The intent is to gather critical feedback regarding Design-Build to Budget (DBtB), project delivery risks, and acquisition preferences to support the upcoming project delivery selection. PROJECT DESCRIPTION The planned procurement will construct a Ready Building, Project Number 570628, at Biggs Army Airfield, Fort Bliss, El Paso, Texas. The project will provide a permanent, properly sized Ready Building supporting continuous, 24-hour operations for an on-call Air MEDEVAC crew. The facility will provide approximately 4,836 square feet of permanent single-story construction. The facility will provide operational space for a five-person aircraft crew, living and readiness space for one five-person crew, and surge capacity for an additional five-person crew. The facility must enable aircraft crews to remain postured for rapid response, with direct access to the aircraft parking apron for MEDEVAC launches and weekend aircraft maintenance. The existing temporary facility is undersized and is not adjacent to the aircraft parking apron. The existing facility will remain operational until construction of the new Ready Building is complete. The temporary facility is outside the new construction footprint and is included in the project demolition scope after completion of the new facility. The project site is adjacent to the Biggs Army Airfield aircraft parking apron. The project site is anticipated to fall within a seismic design condition that may result in Seismic Design Category D requirements. The final Seismic Design Category will be determined by the project Designer of Record in accordance with applicable codes and project-specific site conditions. The Ready Building is a Risk Category IV facility because of its emergency-response function. The project must comply with applicable Unified Facilities Criteria, antiterrorism/force-protection, fire/life-safety, seismic, cybersecurity, and installation requirements. Fort Bliss utility systems are privatized. Required services include electric power, natural gas or an approved alternative fuel approach, water, sanitary sewer, and telecommunications. Utility-system owners are anticipated to provide and own required connections to the facility service disconnect or other defined point of demarcation. The civil utility plan identifies a need for utility-owner rerouting of water and gas around the proposed lid pond. Budget & Schedule: Construction Cost Limitation (CCL): $7,200,000.00 Solicitation Release: 02 March 2027 Agreement Award: 21 May 2027 Construction Completion Date: 365 calendar days from Notice to Proceed Beneficial Occupancy Date: 05 July 2028 INSTRUCTIONS TO INDUSTRY Review Attached Project Information Packet (PIP) Interested firms are directed to review the attached document. This packet provides comprehensive project requirements, constraints, and the complete questionnaire reference. Submit Responses via Microsoft Forms To streamline the collection and analysis of industry feedback, responses to the market research questionnaire must be submitted electronically via the following link: Online Feedback Form: https://forms.osi.apps.mil/r/ZwqwSLBZpb Response Due Date: 13 NOVEMBER 2026 BY 2PM. All electronic responses must be submitted via the online form no later than: 13 NOVEMBER 2026 BY 2PM. POINTS OF CONTACT Agreements Specialist: SFC Jordan LeeAnn Kennedy Jordan.L.Kennedy@usace.army.mil Office: 817-886-1189 Agreements Officer (AO): Lindsay Chvilicek Lindsay.M.Chvilicek@usace.army.mil Office: 817-886-1189 | - | Special Notice | 11/13/2026 |
SUBJECT: Sources Sought Notice/RFI –B-21 Field Training Detachment Facility, Dyess AFB DISCLAIMER: This Sources Sought (SS) is for planning and market research purposes only and does not constitute a Request for Proposals (RFP) or an Invitation for Bids (IFB). This notice is issued under the authority of 10 U.S.C. § 2808a (Other Transaction Authority for Construction and Repair) and is not subject to the Federal Acquisition Regulation (FAR). No solicitation is available at this time. The Government will not pay for any information submitted in response to this notice. PURPOSE: The U.S. Army Corps of Engineers (USACE), Fort Worth District, is conducting active public market intelligence to gauge industry interest, capacity, and capability from commercial construction firms, design-builders, and Non-Traditional Defense Contractors (NDCs). The intent is to gather critical feedback regarding advanced commercial construction methodologies, project delivery risks, and acquisition preferences to support our upcoming project delivery selection. PROJECT DESCRIPTION This project will construct a two-story, approximately 55,617 gross square foot Field Training Detachment facility for B-21 maintenance training at Dyess Air Force Base, Texas, with an estimated Construction Cost Limitation (CCL) of $66,200,000. The facility will feature a steel-frame structure with a metal roof, concrete masonry unit exterior walls, and a drilled concrete pier foundation system designed for local expansive soil conditions. Functional requirements include high bay trainers and classrooms for B-21 maintenance, substantial secure space constructed in compliance with Intelligence Community Directive (ICD) 705 standards with construction security surveillance, a 440-ton HVAC capacity, ducted communications, utilities, and associated site infrastructure and paving. INSTRUCTIONS TO INDUSTRY Review Attached Project Information Packet (PIP): Interested firms are directed to review the attached document. This packet provides comprehensive project requirements, constraints, and the complete questionnaire reference. Submit Responses via Microsoft Forms: To streamline the collection and analysis of industry feedback, responses to the market research questionnaire must be submitted electronically via the following link: Online Feedback Form: https://forms.osi.apps.mil/r/bTXNv35d0c Response Due Date: All electronic responses must be submitted via the online form no later than October 27, 2026, at 2:00 PM Central Time (CT). POINTS OF CONTACT Contract Specialist: Benjamin, benjamin.j.aldrich@usace.army.mil, (817) 886-1095 Contracting Officer: Christopher R. Preston, II, Christopher.r.preston@usace.army.mil, (817) 940-2482 | - | Market Research | 10/30/2026 |
Additional Details
Solicitation Number
W9126G20R0052
Archive Date
Jul 1, 2020
Office Address
FORT WORTH, TX, 76102-6124