Notice ID: a6bebb0ddd7d4d6b97d04b4180d3d0deSolicitation
W9126G22R0056
Archived on October 6, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−05:00
- Posted
- September 7, 2022
- Notice type
- Solicitation
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W076 ENDIST FT WORTH
- Place of performance
- Fort Polk, LA, 71459
- Last updated
- Dec 6, 2025
Identifiers
- Solicitation number
- W9126G22R0056
- Notice ID
- a6bebb0ddd7d4d6b97d04b4180d3d0de
Description
AM00003 UPDATES WAGE DETERMINATIONS. Construct a standard design Information Systems Facility. Project includes an information system processing area divided into specified security zones that address special use space for a Data Center, Network Operations Center (NOC), Local Session Controller Node (LSCN), and administration and warehousing. Construction includes redundant mechanical and electrical systems with backup power, secure organizational vehicle parking, loading/service areas, fire protection and alarm systems, Intrusion Detection System (IDS) installation, and Utility Monitoring Control Systems (UMCS) connection. Adherence to TEMPEST security standards will be provided. Low Impact Development Integrated Management Practices (LID-IMPs) and sustainability and energy enhancement measures are included. Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, landscaping, and signage. Heating and air conditioning will be provided by connection to a self-contained system. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided. Comprehensive building and furnishings related interior design services are not required. Facilities will be designed to a minimum life of 40 years in accordance with DoD Unified Facilities Code (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Access for individuals with disabilities will be provided. Cooling is estimated at 128 tons for the administrative and support areas, 232 tons for the Data Center, and 245 tons for redundant mechanical systems. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9126G22R0056' to obtain more details.*
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W9126G22R0056- Market Research
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 3×Market ResearchNov 29, 2021
Information Systems Facility (ISF) at Fort Polk, LA
- 4×
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The U.S. Army Corps of Engineers (USACE), Fort Worth District, on behalf of the Department of the Air Force (DAF), is issuing this Program Solicitation to identify a Design-Build Team for the 91st Cyber Operations Center at Joint Base San Antonio (JBSA), Lackland Air Force Base, Texas. The project involves the design and construction of an approximately 42,000-square-foot, multi-story facility to support the mission requirements of the Air Combat Command 91st Cyber Operations Squadron. The facility will be designed and constructed to meet applicable security and technical standards for a mission-critical cyber operations environment. This acquisition will use a Progressive Design-Build (PDB) delivery model executed under an Other Transaction (OT) Agreement pursuant to 10 U.S.C. § 2808a. The acquisition will be conducted in two phases: Phase 1—Design and Pre-Construction Services: The selected Design-Build Team will collaborate with the Government to refine project requirements, advance the design, validate cost and schedule, and support development of the Phase 2 scope. Phase 2—Construction Packages: Subject to successful Phase 1 performance, successful negotiation, required approvals, authorization, and availability of funds, the Government may authorize subsequent construction packages through Agreement Amendment. Anticipated packages include: Phase 2A—Site/Civil and Early Construction: Site development, civil work, and other early construction activities. Phase 2B—Building Construction: Final design completion and construction of the 91st Cyber Operations Center facility. The Government may authorize additional construction packages, as appropriate. The Government is under no obligation to proceed with Phase 2A, Phase 2B, or any additional package. The Government will use a two-step, qualifications-based selection process: White Paper Submission and Evaluation Pitch Meetings, by invitation only Interested Design-Build Teams are invited to submit a White Paper in accordance with the solicitation and its attachments. The White Paper is the only submission required at this time. White Papers must address all requirements in Attachment 1, Request for White Paper Submission Requirements. Questions: All questions must be submitted through the ProjNet Bidder Inquiry System no later than 11 November 2026, in accordance with the solicitation instructions. White Paper Due Date: White Papers are due no later than 17 November 2026 at 1400 Central Time. Submission Method: Submit White Papers by email to the Solicitation Points of Contact identified in the solicitation. Required Email Subject Line: “White Paper for 91st Cyber Operations Center” Refer to the attached Program Solicitation, Attachment 1—Request for White Paper Submission Requirements, and Attachment 2—Project Requirements Document for the complete project scope, submission instructions, evaluation approach, and applicable requirements. | 71% | Solicitation | 11/18/2026 |
SPECIAL NOTICE Title: Akeroyd Blood Donor Center Progressive-Design Build, Fort Sam Houston in San Antonio, Texas. The U.S. Army Corps of Engineers (USACE) is issuing this special notice to announce an upcoming solicitation for Progressive Design-Build under 10 U.S.C. 2808a Other Transaction Authority for Construction for the Akeroyd Blood Donor Center at Fort Sam Houston in San Antonio, Texas. This notice is for informational and planning purposes to allow interested parties to prepare for the official solicitation release. See Attachment for Project specific information as well Industry Day registration. | 71% | Special Notice | 10/27/2026 |
This project is to design and construct a new Border Patrol Station (BPS) just west of Freer, Duval County, Texas. The new Freer BPS will include the following major facilities: main administrative-training building/comprehensive processing/holding area, communication tower, parking areas, impound lot area, short stay kennels, above ground refueling area, vehicle maintenance facility, carwash facility, ATV facility, and facility maintenance facility. It will also include an outdoor firing range as a bid option. | 71% | Awarded | Open |
Update 0006 is to issue Amendment 0005. // Update 0005 is to issue Amendment 0004. // Update 0004 is to issue Amendment 0003. // Update 0003 is to issue Amendment 0002. // Update 0002 is to issue Amendment 0001. // Update 0001 is to add the Site Visit Sign-in Sheet. // The proposed project is a 100% Small Business Set-Aside for a Design-Bid-Build Construction contract for a Military Working Dog Kennel Facility, Fort Hood, Texas. For details, see attached Solicitation located in the PIEE Solicitation Module. | 71% | Solicitation | 07/30/2026 |
Amendment 0003 // Design-Bid-Build RFP for Construct Central Energy Plant, Fort Hood, TX | 71% | Solicitation | 06/22/2026 |
Additional Details
Solicitation Number
W9126G22R0056
Archive Date
Oct 6, 2023
Office Address