GovChime
Notice ID: f0c9fb5303c2542ee2007ed577953813Special Notice

Y--Pascagoula Harbor Confined Dredged Material Disposal Site, Pascagoula, Jackson County, Mississippi

Archived on December 18, 2012. Full description on SAM.gov.

Overview

Posted
September 19, 2012
Notice type
Special Notice
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W074 ENDIST MOBILE
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 5, 2025

Identifiers

Solicitation number
W9127812R0027
Notice ID
f0c9fb5303c2542ee2007ed577953813

Description

AWARD RESULT Contract No.: W91278-12-C-0037 Solicitation No.: W91278-12-R-0027 Description: Pascagoula Harbor Confined Dredged Material Disposal Site, Pascagoula, Jackson County, Mississippi Awardee: Bertucci Contracting Company, LLC. P.O. Box 10582 Jefferson, Louisiana 70181 (504)835-0303 Date: 14 SEPTEMBER 2012 Amount: $13,112,902.20

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

LaNell Roberts, (251)694-3859 USACE District, Mobile

Documents

No documents available.

Lifecycle

Solicitation:W9127812R0027
  1. Special NoticeCurrentSep 19, 2012

    Y--Pascagoula Harbor Confined Dredged Material Disposal Site, Pascagoula, Jackson County, Mississippi

    Notice f0c9fb5303c2542ee2007ed577953813 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Purpose: The U.S. Army Corps of Engineers, Savannah District, is seeking information from industry to determine the availability and capability of qualified contractors is to provide general construction for the new construction, rehabilitation, replacement, repair, and construction-related maintenance of Dredged Material Containment Areas (DMCAs) and associated infrastructure within Savannah and Brunswick Harbors. All work shall be performed in a safe, timely, and cost-effective manner. This notice is issued for the purpose of conducting market research. This is not a Solicitation Announcement, nor is it a Request for Proposal. The Government is contemplating a potential acquisition strategy. The results of this market research will contribute to determining the method of procurement. The Government is seeking to identify capable firms, including small businesses, that have recent and relevant experience in performing DMCA-related construction work, such as site preparation, dike construction and repair, weir/structure rehabilitation, erosion control, grading, and general access improvements. Task orders will be executed using the Design-Bid-Build (DBB) delivery method. The Contractor will perform construction in accordance with Government-furnished designs. Requirements: Work under this contract is restricted to the designated DMCAs, bird islands, and directly associated supporting infrastructure located within the Savannah and Brunswick Harbor operational footprints: Savannah Harbor Facilities: Disposal Areas 1N, 2A, 12A, 13A, 13B, 14A, and 14B; Jones/Oysterbed Island (JOI); and associated bird islands. Brunswick Harbor Facilities: Andrews Island DMCA. The Government anticipates awarding a Firm-Fixed Price Indefinite Delivery Indefinite Quantity (IDIQ) Construction Contract with an expected effective date in late FY27 – early FY28. The anticipated contract period of performance is five (5) years. The contract will provide for the construction, rehabilitation, replacement, repair, and construction-related maintenance of Dredged Material Containment Areas (DMCAs) and associated infrastructure within Savannah and Brunswick Harbors. All work shall be performed in a safe, timely, and cost-effective manner in accordance with the requirements of this contract and individual task orders. The Contractor shall furnish all necessary supervision, labor, materials, equipment, transportation, temporary facilities, construction quality control, and other resources required to complete construction activities under individual task orders in accordance with the applicable contract requirements. Individual task orders will establish specific work limits, requirements, and completion criteria. Task orders will be issued based on the Government’s requirements and may specify performance durations (e.g., calendar days). Representative construction and maintenance tasks may include, but are not limited to construction, rehabilitation, repair, and maintenance of designated DMCA infrastructure, including dikes, embankments, roads, access areas, drainage and water-control systems, shoreline protection, marine access features, and associated structural, mechanical, and electrical components. Supporting activities may include earthwork, excavation, material handling, dewatering, vegetation and debris removal, erosion control, site restoration, surveys, utility protection, temporary facilities, waterborne access, testing, and documentation necessary to complete authorized task orders. All work shall comply with applicable environmental, material handling, disposal, seasonal, and access requirements. General building construction and HVAC work are excluded. Interested Firms: If you are interested in this contract and/or your firm has the potential capacity to perform these requirements, please provide the following information by 27 Nov 2026. • Complete the following survey using the link: https://forms.osi.apps.mil/r/H8muyzF7RS?origin=lprLink
76%
Market Research11/27/2026
Award Notice for the Pointe Mouillee Confined Disposal Facility Cells 1 and 2 Fill Management
74%
AwardedOpen
The U.S. Army Corps of Engineers, New England District is issuing a Sources Sought Announcement for the upcoming dredging project located in Providence, Rhode Island. This announcement is to determine the interest, availability and capability of Small and Large Business concerns as described below. The NAICS code for this procurement is 237990. The solicitation for this project is anticipated to be issued on or about 15 March 2027. The construction will begin in September 2027 and is expected to take approximately 2 years to complete. The estimated construction cost is between $80,000,000 and $100,000,000. The Providence River Maintenance Dredging project involves two major sequences of dredging and disposal activities. The first work sequence will be the construction of a new Confined Aquatic Disposal (CAD) cell adjacent to the Providence River. The second work sequence under this contract will include maintenance dredging of the Providence River and Harbor Federal Navigation Project (FNP) to its authorized depths and dimensions. The proposed work consists of mechanically dredging approximately 5,500,000 cubic yards (cy) of material using closed clamshell buckets for both major sequences of work over the course of two years. The new CAD cell will be in the Edgewood Basin area located adjacent to the Providence FNP (hereafter the “Edgewood Shoals North (ESN) CAD cell”). To access the CAD cell area, an access channel will be dug between the Providence FNP and the CAD cell area. The access channel will be approximately 100 ft wide and -25 MLLW deep. The CAD cell will have surface dimensions of approximately 1000 ft. by 1000 ft. and be dug to a depth of -60 MLLW. The material excavated to build the access channel is generally a mix of sandy silt and shell fragments. Within the CAD cell area the material is generally described as soft grey to black organic silt with some layers of firm sandy silt and some shell fragments and coarse-grained material. Material excavated from the access channel and CAD cell area will be placed at four locations: Port Edgewood Basin, the Fox Point Reach CAD cells, Prudence Island Disposal Site, and the Rhode Island Sound Disposal Site. This work consists of mechanically dredging approximately 3,200,000 cy to construct thew ESN CAD cell and its access channel, which must be completed before maintenance dredging of the FNP can begin. The maintenance dredging proposed work consists of mechanically dredging the Providence River FNP to the full -40 MLLW depth plus 2-feet of allowable overdepth. 2,300,000 cy (1,200,000 cy required depth, with up to 1,100,000 cy overdepth) of shoaled material consisting generally of poorly graded medium to fine sand with silt. The dredge material from this maintenance portion of work will be placed in the ESN CAD cell. Environmental coordination and permitting is being completed by the U.S. Army of Engineers, New England District. All dredging and disposal activities for this project have prescribed work windows that incorporate environmental and recreational time of year restrictions. Refer to the Draft Specification Section provided with this announcement for specifics on the time of year work restrictions. In order to accomplish all dredging requirements within the specified dredging window it is expected that the Contractor will need to meet a production rate of 300,000 CY per 30 calendar days. The U.S. Army Corps of Engineers, New England District is requesting responses to the questions below from both small and large businesses[MC1] . Draft drawings showing a concept design plan and draft Specification Section of 01 11 00 SUMMARY OF WORK have been provided with this announcement to help provide more context for the contract work and responses to these questions. Considering the different disposal locations, are there suggestions on a bid structure that will provide for the most accurate costs of different disposal locations? Any draft restrictions that may impact dredging and/or disposal operations? Any concerns on the period of performance of September 2027 to September 2029 considering the environmental windows and amount of work? If so, why? Any comments about the bed leveling planned in the Fox Point Reach? Are there concerns about this part of the plan, if so, why? Interested firms should also demonstrate their project experience, by providing two (2) projects within the last ten years, which meet the following requirements: Dredging by mechanical means demonstrating a minimum production rate of 300,000 cubic yards in one consecutive 30-day period. Experience with placement of dredged material at an open water placement site in New England during the fall/winter months of October through March. Interested firms should submit a capabilities package to include the following: business classification (i.e. HUBZone, etc.), type of equipment the firm is proposing to use on the project, and two (2) example projects performed by the firm in the last ten (10) years (including Points of Contact for those projects) showing experience with the proposed equipment at the production rate listed above. Please indicate the team subcontractor(s) (if any), including their prior experience and qualifications meeting the same qualifications listed above, which will be used to support the bidder's effort. Firms may use subcontractor experience to demonstrate experience with the requirements, but the role and work performed by each team member (prime and subcontractors) on projects demonstrating that team member's experience shall be the same as the role for that team member for this project. Bid bond will need to be provided with the bid. Responses are limited to twenty pages and due by December 03 , 2026. Responses should be addressed to the U.S. Army Corps of Engineers, New England District, 696 Virginia Road, Concord, MA 01742-2751, ATTN: Kyle Hall, or electronically to Kyle.K.Hall@usace.army.mil. The Government will not pay for any material provided in response to this market survey nor return the data provided. This notice is for information purposes only and is not a request to be placed on a solicitation mailing list nor is it a Request for Proposal (RFP) or an announcement of a solicitation. The results of this survey will be considered to be in effect for a period of one year from the date of this notice. Government Agency URL: www.nae.usace.army.mil Government Agency URL Description: New England District, Corps of Engineers
72%
Market Research12/03/2026
The U.S. Army Corps of Engineers, Enterprise Dredge Delivery Center (EDDC) requires a contract to provide maintenance dredging for (3) dredging projects. The areas of consideration for these dredging services are: Calcasieu Bar River Channel, Pascagoula Harbor, and Panama City Harbor. Calcasieu River Bar Channel: Work for the Calcasieu River Bar Channel will require one fully crewed and equipped self-propelled trailing suction type hopper dredge. The dredge must have the capability to dredge maintenance material up to a depth of -45ft MLLW and place dredged material into the Ocean Dredge Material Disposal Sites (ODMDS).Pascagoula Harbor: Work for the Pascagoula Harbor maintenance dredging will require a hopper dredge. The dredge must have the capability to dredge maintenance material up to a depth of -46 ft MLLW and place dredged material in the Ocean Dredge Material Disposal Site (ODMDS). Dredged material shall be placed within Pascagoula ODMDS. The transport distance to the designated placement area varies depending on dredge assignment but typically is within 3-5 miles of the dredge cut. Panama City Harbor: Work for the Panama City Harbor maintenance dredging will require a medium to small hopper. The dredge must have the capability to dredge maintenance material up to a depth of -40 ft MLLW and place dredged material within channel adjacent to the entrance jetty. Dredged material shall be placed within the channel adjacent to the jetty. The transport distance to the designated placement area varies depending on dredge assignment but typically is within one mile of the dredge cut. The Contractor shall commence dredging no later than 30 January 2027 in Calcasieu River Bar Channel. The order of work is as follows: (1) Calcasieu River Bar Channel, (2) Pascagoula Harbor, (3) Panama City Harbor. This solicitation is unrestricted. The contract issued will be Firm Fixed Price. This solicitation will be issued in electronic format only and will be available on or about 23 October 2026. The bid opening date will be specified in the solicitation when it is issued. No additional media (CD-ROM, floppy disks, facsimiles, etc.) will be provided. Paper copies of this solicitation will not be available. Other methods of requesting a package will not be honored. The North American Industry Classification System (NAICS) code is 237990, Other Heavy and Civil Engineering Construction and the size standard is $37,000,000.00. Offerors must be registered in the System for Award Management (SAM) in order to be eligible to receive an award from any Government solicitation. Call 1-866-606-8220 for more information or visit the SAM website at www.sam.gov. After completing SAM, in order to download documents contractors and their subcontractors must register at www.sam.gov. In order to locate solicitation, Contractors can go to www. sam.gov and search for the solicitation number. Contractors can register to be put on a plan holders list that others can access through the www.sam.gov website. It is the Offerors responsibility to check the Internet address provided as necessary for any posted changes to this solicitation and all amendments. For additional information or assistance, please contact Cori Caimi, Contract Specialist, email cori.a.caimi@usace.army.mil or Rosalind Shoemaker, Contracting Officer, phone (910) 251-4436, email rosalind.m.shoemaker@usace.army.mil.
71%
Solicitation12/07/2026
71%
AwardedOpen

Additional Details

Solicitation Number

W9127812R0027

Archive Date

Dec 18, 2012