Notice ID: 56d2f05aaa7c1def5316a7b40f7d91b6Award NoticeAwarded
DESIGN-BUILD REPLACE DORM 19
Awarded on September 30, 2019. Full description on SAM.gov.
Awarded tounder W9127819C0034 (source: SAM.gov award notice)• $44.1M
Overview
- Posted
- September 30, 2019
- Notice type
- Award Notice
- Agency
- Department of War
Notice details
- Place of performance
- EGLIN AFB, FL (OKALOOSA COUNTY) , Eglin Afb, FL
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 4, 2025
- Award date
- Sep 30, 2019
- Award amount (SAM.gov award notice)
- $44.1M
Identifiers
- Solicitation number
- W9127819R0039
- Notice ID
- 56d2f05aaa7c1def5316a7b40f7d91b6
- Award number (PIID)
- W9127819C0034
Description
06/28/2019 AMENDMENT 0004 The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended to 2:00 pm, July 9th, 2019.
Award Overview
Award Number
W9127819C0034
Award Amount (SAM.gov award notice)
$44.1M
Award Date
Sep 30, 2019
Awardee
Awardee UEI
HGPVHKAQ7QB7
Original Solicitation
Notice ID: 56d2f05aaa7c1def5316a7b40f7d91b6
Posted Date: Sep 30, 2019
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- —Signed Jun 25, 2025
- —Signed Apr 9, 2025
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W9127819R0039- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 6×Pre-SolicitationApr 25, 2019
DESIGN-BUILD REPLACE DORM 19
- SolicitationJun 28, 2019
DESIGN-BUILD REPLACE DORM 19
- AwardedCurrentSep 30, 2019
DESIGN-BUILD REPLACE DORM 19
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The U.S. Army Corps of Engineers (USACE) is issuing this solicitation for the design and construction of PN 110205 using Progressive Design-Build under 10 USC 2808a Other Transaction for Construction. See attachments for additional information. ***AMENDMENT 0004 PROVIDES REVISED Draft_PDB-OTA Agreement Articles TO UPDATE DPAS RATING AND PROGRAM LANGUAGE*** | 77% | Solicitation | 11/11/2026 |
Progressive Design-Build - Sustainment, Restoration and Modernization (SRM) Campaign for the 96th Medical Group (MDG) at Eglin Air Force Base, Florida This is not a Request for Quote (RFQ), only a Request for Information (RFI). No agreement or contract will result from this Special Notice. This notice does not constitute any commitment by the Government. Submissions will be evaluated strictly to gauge industry interest and to determine the technical capability of prospective entities to perform the specialized construction work described herein. | 77% | Special Notice | 11/12/2026 |
The U.S. Army Corps of Engineers (USACE) Europe District is planning a procurement to award a new Design-Build and Design-Bid-Build Multiple Award Task Order Contract (DB-DBB MATOC) for construction projects in Latvia and Lithuania. The MATOC will have a five-year ordering period with a maximum capacity of $49.5M shared amongst the awardees, and will expire at the end of the ordering period or when the maximum capacity is reached, whichever comes first. Note: Though the corresponding Sources Sought Notice (#W912GB27X1CPR) listed Estonia in addition to Lativa and Lithuania, the Government has opted to exclude Estonia from the MATOC footprint based on the results of market research conducted. The solicitation for this procurement will use the two-phase design-build procedures of FAR 36, FAR 16.5, FAR 15, and other regulations and supplements. The Government anticipates issuing a Phase 1 - Request for Qualifications in December of 2026, followed by a Phase 2- Request for Proposal in March of 2027 with a target of five awards in the third quarter of 2027. The Request for Qualifications will be posted here through the Procurement Integrated Enterprise Environment (PIEE) website. Interested offerors must be registered in PIEE to submit a response. Cybersecurity Maturity Model Certification (CMMC) The scope included in the upcoming solicitation requires the contractor(s) and/or subcontractor(s) to process, store, or transmit Federal Contract Information (FCI) or Controlled Unclassified Information (CUI) through their information system(s) and requires the contractor and/or subcontractor(s) to comply with CMMC requirements. For any task orders that follow the MATOC award, the CMMC level will be determined at the time of task order RFP. Cybersecurity compliance (NIST SP 800 / CMMC Level 1) is not reimbursable. Offerors must hold the required CMMC certification at the time of award and throughout task order performance. Proof of CMMC compliance is required to be uploaded to the Supplier Performance Risk System (SPRS) module. The Government will use SPRS to verify certification status at award, and any offeror without the required certification at that time will be ineligible for award as their proposal will have failed to meet a material requirement of the solicitation and will be determined unacceptable. See DFARS 252.204-7021 "Contractor Compliance with the Cybersecurity Maturity Model Certification Level Requirements" and DFARS 252.204-7025 "Notice of Cybersecurity Maturity Model Certification Level Requirements" for the definitions, requirements, reporting, and subcontract information for this contract/order/agreement. NATO Security Investment Programme (NSIP) Task orders awarded against this MATOC may be funded through the NSIP. Only firms from the 32 North Atlantic Treaty Organization (NATO) countries will be permitted to participate as part of such task orders, to include the prime contractor, subcontractor(s), or manufacturer(s). None of the work required on NSIP-funded task orders, including labor and services, shall be performed by firms not registered and incorporated in one of the 32 NATO member nations. Additionally, no materials or items of equipment, to include identifiable sub-assemblies, shall be manufactured or assembled by a firm other than from within the 32 NATO member nations for such task orders. 1. Assembly: An item forming a portion of equipment that can be provisioned and replaced as an entity and which normally incorporates replaceable part of groups of parts. 2. Sub-Assembly: A portion of an assembly consisting of two or more parts that can be provisioned and replaced as an entity. 3. Manufactured: Made on an industrial scale. 4. Assembled: Fit together parts of. 5. Made in: Form from parts in. Note: The solicitation issued resulting from this notice will be in a separate announcement using the same Notice ID. A company must be registered and active in SAM to be considered for contract award. Further instructions and information can be found at https://sam.gov/content/entity-registration | 76% | Pre-Solicitation | 12/12/2026 |
The U.S. Army Corps of Engineers, Baltimore District, is issuing this Market Survey to solicit input from the construction community including general contractors, subcontractors, union and open-shop firms, and industry associations regarding the potential use of a Project Labor Agreement for the Capitol Perimeter Enhancements project in Washington, DC. | 75% | Special Notice | 12/04/2026 |
This is a sources sought notice ONLY. This is not a request for proposals, quotations or bids. There will not be a solicitation, specifications or drawings available at this time. No contract will be awarded from this notice. Responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. The Government will not reimburse respondents for any costs incurred in preparing or submitting responses to this Sources Sought Notice. | 75% | Market Research | 12/04/2026 |
Additional Details
Solicitation Number
W9127819R0039
Archive Date
Jan 1, 2022
Office Address
MOBILE, AL, 36602-3630