GovChime
Notice ID: 49314cb917d74277afb9a3f191f1da81Solicitation

Zone 1 – F-35 Flightline Facilities Tyndall AFB, FL

Archived on September 30, 2021. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−06:00
Posted
May 25, 2021
Notice type
Solicitation
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W074 ENDIST MOBILE
Place of performance
Tyndall AFB, FL, 32403
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W9127820R0035
Notice ID
49314cb917d74277afb9a3f191f1da81

Description

Pre-Qualification of Sources THIS PROJECT WILL BE ADVERTISED ONLY TO THOSE SOURCES THAT ARE PREQUALIFIED IN ACCORDANCE WITH (IAW) THIS ANNOUNCEMENT WHICH INCLUDES A SUBMITTAL OF A VALIDATED AND ACCEPTABLE RESPONSE TO THIS PREQUALIFCATION OF SOURCES (SEE ATTACHED requirements) This is a PREQUALIFICATION OF SOURCES announcement, issued in accordance with DFARS 236.272 and the U.S. Army Corps of Engineers Acquisition Instruction (UAI) 5236.272. No reimbursement will be made for any costs associated with providing information in response to this announcement or any follow up information requests. Respondents will be notified in writing of the results of the Prequalification of Sources Selection. In this acquisition, prequalification is necessary and justified because of the magnitude and complexity of the proposed requirement. Tyndall AFB Zone 1 is a very complex requirement of 11 buildings all built alongside an active military flight-line runway. Because of the nature of this requirement and the very tightly enclosed spaces, the lack of sufficient lay-down yards, and the already complicated logistical, material, and labor issues likely to be faced by the successful offeror, along with the requirements burden of preparing 11 complete designs, the decision to use the Design-Bid-Build construction method for Zone 1. This project is a Best Value, Design-Bid-Build solicitation. A detailed project description and overall project requirements for this project will be included in the Request For Proposals (RFP) package which shall ONLY be provided to the prequalified sources, determined through this announcement. This acquisition will consist of the construction of 11 facilities within the Flightline area of Tyndall AFB, FL, known as Zone 1 – F-35 Flightline Facilities. These facilities are: OPS/Aircraft Maintenance Unit Hangar 1, OPS/AMU/Hangar 2, OPS/AMU/Hangar 3, F-35 Parking Apron, F-35 Flight Simulator, F-35 Squadron Maintenance Complex, OG/MXG HQ, Maintenance Fuel Cell Hangar, Weapons Load Training Hangar, F-35 AGE Facility and Corrosion Control Facility. Facilities include all utilities, site improvements, pavements, detection/protection features, security enhancements and other supporting work necessary to make complete and usable facilities. OPS/ Aircraft Maintenance Unit Hangar #1: Maintenance Hangar (211-111) 3,284 SM = 35,350 SF Squadron Operations (141-753) 1,538 SM = 16,550 SF Aircraft Maintenance Unit (211-154) 2,578 SM = 27,750 SF Covered Outdoor Storage (452-252) 325 SM = 3,496 SF Construct a consolidated Maintenance Hangar, Squadron Operations, Aircraft Maintenance facility required to support the beddown of the Joint Strike Fighter (JSF) F-35A aircraft. Construct a complex that contains the Maintenance Hangar, Squadron Operations, and Aircraft Maintenance Unit (AMU) facility required to support the bed down of the Joint Strike Fighter (JSF) F-35A aircraft. The maintenance hangar required consists of six large bays which provide space for aircraft maintenance, tool rooms, aircraft weighing and other maintenance and inspection activities. F-35 Squadron Maintenance Complex 2a. Maintenance Backshops 3,445 SM = 34,000 SF 2a. Maintenance HQ465 SM = 5000 SF 2b. Aircraft Parts/Spares Storage 3437 SM = 37000 SF (Separate LRS Facility) 2b. Aircraft Parts/Spares Office 139 SM = 1500 SF (Separate LRS Facility) Construct a consolidated squadron maintenance facility with maintenance admin, backshops, and aircraft parts and spares storage. The complex will include a maintenance headquarters with administration and support space and maintenance back shops. A separate Logistics Readiness Storage facility is part of the project to include aircraft parts and spare offices, and a large storage facility to support the F-35 mission. Squadron maintenance provides maintenance activities for transient aircraft as well as F-35 and Weapon Evaluations Group (WEG) exercises. OG/MXG HQ: Group Headquarters: 31,027 SF = 2,883 SM. Construct a complex that contains Operations, Maintenance, and Reserve Group headquarters for the 325th OG, MXG, and MSO to support all increments, as well as the fighter reservists and aircraft carrier nuclear (CVN). The facility includes standard, private, and open office administrative space for all personnel and support. Space includes team/meeting/conferencing rooms, classrooms, and copy/file/storage rooms. A reception desk, waiting area, and lobby are also required to support visitors and other personnel. Maintenance Fuel Cell Hangar: Maintenance Fuel Cell (211-179) 2,743 SM = 29,530 SF Construct a properly sized and configured maintenance fuel cell hangar to conduct fuel cell maintenance for the 43 Flying Training Unit aircraft and other assigned aircraft with space to store the removable fuel tanks. The fuel cell hangar will provide spaces for fuel maintenance operations, administration, special purposes, and building support. The fuel maintenance operation areas include: an aircraft fuel hangar for three F-35 aircraft, tool crib, fuel shop, and storage for aircraft parts, hazardous material storage, personal protective equipment (PPE), and locker rooms/restrooms. The fuel system maintenance dock may need additional fire detection and suppression. Maintenance docks provide protected space for aircraft maintenance. They contain heating, plumbing, electricity, and compressed air systems and are usually insulated. The docks also include fume sensing and alarms, fire extinguishing systems, and wash down drainage trenches. Weapons Load Training Hangar: Weapons Munition Load Crew Training: 26,526 SF = 2,464 SM Construct a Weapons Load Crew Trainer Hangar facility to support Joint Strike Fighter F-35A aircraft. The facility requires space for three weapons load training bays which should include adequate high-bay area to train on aircraft parts, weapons storage areas, and training workstations. There should be large access doors for each bay to enable the movement of aircraft and weapons systems into and out of the facility. In addition, administrative space is required to include private offices, workstations, and admin support areas. A classroom is also required to facilitate the training of aircrew. F-35 Parking Apron Parking Apron, Paved (113-321) 73,224 SY = 61,224 SM Construct new aircraft parking apron and apron lighting. Additional pavement is required to support the F-35 aircraft and provide area for aircraft operations outside of the obstruction free area. Parking aprons provide aircraft parking, servicing, and loading. The requirement is based on the authorized number of aircraft and the parking apron is sized per AFMAN 32-1084, utilizing the dimensions of the aircraft, the required clearances between the parking spaces, and maneuvering space into and out of the apron. Apron lighting is also provided to support nighttime maintenance activities on the apron. UFC 3-260-01 Airfield and Heliport Planning and Design requires that fixed structures be no closer than 1,000 FT to the centerline of the runway. All new structures built along the parking apron are sited to meet this criteria and thus leave a void between the existing aprons on the new buildings. That space must be filled with additional pavement to allow access to the hangars and maintenance facilities as well as provide adequate space for taxi lanes with pull-through parking. The extension of the parking apron is also required to move aircraft out of the live ordnance loading area and the taxiway obstruction free areas to reduce the waivers and the associated hazards with operating in those areas. F-35 Simulator: Flight Simulator Facility 32,500 SF = 3,019 SM A flight simulator facility houses aircraft flight simulators and other special training devices. An adequately sized and configured facility is required to teach pilots how to use the aircraft in combat. The facility will include the following spaces: administrative, special purpose, assembly, storage, equipment issue, and specialized training and simulator areas. The simulator pods will each include cockpit, display room, IOS room, computer/equipment room, and briefing rooms. Additionally, the training area will house simulator equipment and gear and a classified security room. F-35 AGE Facility: Aircraft Support Equipment Storage: 2,428 SM = 26,138 SF Fuel Fill Stand 1 EA Construct a facility to store Aerospace Ground Equipment (AGE) to support the maintenance flight. This facility provides covered storage and surface maintenance for aerospace ground equipment. The facility includes reinforced concreted foundations and floor slab, split face concrete block walls, tilt up or steel panels, structural steel roof framing and standing metal seam roof. The project includes all utilities, site improvements, pavements, detection/protection features, security enhancements and other supporting work necessary to make a complete and usable facility. The facility will include space for covered storage, surface maintenance shop area, a maintenance support storage room, interior wash rack, run room, and small administrative area with an office for the flight chief, conferencing, training, and other support functions. An above ground storage tank and fueling fill stand area is required adjacent to the facility to service equipment and vehicles. Corrosion Control Facility: Corrosion Control Facility 36,900 SF = 3,428 SM Construct a corrosion control facility that provides for the corrosion resistant facility requirements of the ARMAN 32-1084 and the F-35 Facilities Requirement Document (FRD). The Corrosion Control Facility is a fully enclosed three bay hanger with internal wash capability along with a corrosion facility and its supporting spaces. The overall size is approximately 36,900sf and the facility type is an enclosed hanger Corrosion Control Facility (CCF). The new CCF will contain 3 enclosed hangar bays for the F-35 aircraft along with a paint blasting booth and separate coating shop for aircraft parts. Other supporting areas include tool crib, administrative, restrooms/ lockers and conference room. OPS/AMU/Hangar 2: Maintenance Hangar 3,284 SM = 35,350 SF Squadron Operations 1,538 SM = 16,550 SF Aircraft Maintenance Unit 2,100 SM = 22,600 SF Covered Outdoor Storage 325 SM = 3,496 SF Construct a complex containing the Maintenance Hangar, Squadron Operations, and Aircraft Maintenance facility required to support the bed down of the Joint Strike Fighter (JSF) F-35A aircraft. The maintenance hangar required consists of six large bays which provide space for aircraft maintenance, tool rooms, aircraft weighing and other maintenance and inspection activities. The hangars allow for these activities to be done efficiently and under complete cover. The hangar bays are sized to properly support F-35 aircraft, meet minimum prescribed clearances for egress and safety. The F-35A requires aircraft cooling units at each aircraft position. These cooling units provide cooled air to heat-sensitive components on the aircraft during maintenance procedures. The Squad Ops will be comprised of secure areas for OPS SAPF and SCIF and non-secure areas. It will provide space for flight planning, secure air crew briefing and debriefing areas, training and administration, storage, and care and issue of flight crew life support system equipment. OPS/AMU/Hangar 3: Maintenance Hangar 3,284 SM = 35,350 SF Squadron Operations 1,538 SM = 16,550 SF Aircraft Maintenance Unit 2,100 SM = 22,600 SF Covered Outdoor Storage 325 SM = 3,496 SF Construct a complex containing the Maintenance Hangar, Squadron Operations, and Aircraft Maintenance facility required to support the bed down of the Joint Strike Fighter (JSF) F-35A aircraft. The maintenance hangar required consists of six large bays which provide space for aircraft maintenance, tool rooms, aircraft weighing and other maintenance and inspection activities. The hangar allows for these activities to be done efficiently and under complete cover. The hangar bays are sized to properly support F-35 aircraft, meet minimum prescribed clearances for egress and safety. The F-35A requires aircraft cooling units at each aircraft position. These cooling units provide cooled air to heat-sensitive components on the aircraft during maintenance procedures. The Squad Ops will be comprised of secure areas for OPS SAPF and SCIF and non-secure areas. It will provide space for flight planning, secure air crew briefing and debriefing areas, training and administration, storage, and care and issue of flight crew life support system equipment. Note No. 1: Contractors must be registered in the System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM/ prior to award of this contract. The requirements for this Prequalification of Sources will only be available via beta.sam.gov. Registration for this prequalification of sources should be made via beta.sam.gov. The prequalification of sources will be available only as a direct download. It is the Contractor’s responsibility to monitor the website daily for any posted changes or amendments to this prequalification of sources. All notifications of changes to this prequalification of sources shall only be made through this posting and modifications hereto. NOTE: This Prequalification of Sources is in .pdf format and requires Adobe Acrobat Reader. Adobe Acrobat Reader may be downloaded free of charge at http://www.adobe.com/products/reader. Note No. 2: All respondents to this prequalification notice will be informed in writing whether they are invited or not invited to participate in the resultant acquisition. The determination will be based on the information submitted IAW the submittal requirements in response to this notice. Note No. 3: Submit questions concerning this prequalification request in writing to derrica.j.frazier-corbie@usace.army.mil and carl.m.wade@usace.army.mil no later than 6 November 2020. Note No. 4: Submit responses to this prequalification notice no later than 2:00 PM CST on 23 November 2020 to both derrica.j.frazier-corbie@usace.army.mil and carl.m.wade@usace.army.mil. Please confirm receipt. Note No. 5: The prospective offerors will submit a limited package on the prequalification criteria which will include the following criteria: 1) Bonding Capability; 2) Large Construction Contract Past Experience; and, 3) Specific Construction Experience, in accordance with the attached requirements. The selection process will be objective in that responding firms either meet or fail to meet the criteria. Failure to meet any one of the criteria may result in non-selection. The criteria were designed to ensure selection of clearly qualified contractors with experience and capability relevant to the anticipated requirements, provide competition, and minimize subjectivity in the Government's assessment. The standard of acceptability will be providing a “Yes” response to all of the questions and for the details given/submitted in the appropriate sections to be validated. For the prequalification of sources, evaluation will solely be based on the responses to the criteria and validation and will not include a trade-off process or additional evaluation of any rating factors that would be considered as part of the source selection process. Note No. 6: The responses must be signed by a principal of the firm to be considered valid. Submissions with electronic signatures are acceptable and have the full force and effect of ink signatures. All elements must be answered for the response to be considered valid. Narrative attachments shall be returned in Microsoft Word format AND Adobe PDF. -- END --

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W9127820R0035
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Special NoticeJul 14, 2020

    Zone 1 – F-35 Flightline Facilities Tyndall AFB, FL

    Notice 1802fb8e44254582a418ce113407e0e6 on SAM.gov

  2. Pre-SolicitationAug 13, 2020

    Zone 1 � F-35 Flightline Facilities Tyndall AFB, FL

    Notice f1554b3378a64a5b8a46e050fd118554 on SAM.gov

  3. 7×
    SolicitationCurrentOct 23, 2020

    Zone 1 – F-35 Flightline Facilities Tyndall AFB, FL

    Notice 49314cb917d74277afb9a3f191f1da81 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Progressive Design-Build - Sustainment, Restoration and Modernization (SRM) Campaign for the 96th Medical Group (MDG) at Eglin Air Force Base, Florida This is not a Request for Quote (RFQ), only a Request for Information (RFI). No agreement or contract will result from this Special Notice. This notice does not constitute any commitment by the Government. Submissions will be evaluated strictly to gauge industry interest and to determine the technical capability of prospective entities to perform the specialized construction work described herein.
-Special Notice11/12/2026
Please mark your calendar and plan to join us for an Industry Day Meeting highlighting Military Construction (MILCON) project opportunities, including project presentation, open discussion and networking, with the Space Launch Delta 45 (SLD45) program managers, the U.S. Army Corps of Engineers project management and contracting, and design teams for business opportunities regarding construction of the FY27 SPOTFi Program at Cape Canaveral SFS, FL. July 30, 2026 Hilton Garden Inn Cocoa Beach Oceanfront 2080 North Atlantic Ave., Cocoa Beach, FL 32931 7:30 – 8:00 Check-In 8:00 – 11:00 FY27 SPOTFi Program Presentation 11:00 – 12:00 Networking Note: RSVP required via email: kyle.m.rodgers@usace.army.mil and jessica.raulerson@usace.army.mil Limited to 2 personnel per contractor.
-Special NoticeOpen
***Amendment 0001 was posted on 21 July 2026.*** ***The Sign-in Sheet for the 23 June 2026 Site Visit was posted on 29 June 2026.*** DESCRIPTION: Request for Proposal (RFP) Solicitation Number W912QR26RA012, is issued for the alteration and renovation of the existing 78,625 square foot LTC Luis E. Martinez ARC training building, construction of a new 19,363 square foot collocated Area Maintenance Support Activity (AMSA) and Vehicle Maintenance Shop (VMS), and new 50,747 square foot Organizational Storage Building located in Perrine, FL. Supporting facilities include land clearing, building demolition, paving, concrete aprons, vehicle wash rack/platform, bi-level equipment loading ramp, mobile kitchen trailer pad, SATS Trailer canopy, fencing, general site improvements and utility connections. Swing space using temporary relocatable facilities, 13,200 square feet, at Homestead Air Reserve Base will also need to be provided prior to start of construction at the Perrine Army Reserve Center. Contractor will be responsible for the temporary facility design, installation including utilities, maintenance, and removal at the end of the construction contract period. The Contract Duration is estimated at 1,065 calendar days from Contract Award. TYPE OF CONTRACT AND NAICS: This RFP is for one (1) Firm-Fixed-Price (FFP) contract. The North American Industrial Classification System Code (NAICS) for this effort is 236220 - Commercial and Institutional Building Construction. TYPE OF SET-ASIDE: This is a Full and Open procurement. A small business sub-contracting plan will be required prior to award. SELECTION PROCESS: This is a Design/Bid/Build procurement. The proposals will be evaluated using a Best Value Trade Off source selection process. Past performance and technical information contained in the Offeror’s proposal will be reviewed, evaluated, and rated by the Government. The proposal for this procurement, at a minimum, will consist of the following: Prime Contractor Past Performance, Technical Factor(s) such as management plan, Subcontracting plan, and Price and Pro Forma information such as bonding and financial capability will also be required to meet the minimum requirements of the solicitation. All evaluation factors, other than price, when combined, are considered approximately equal to cost or price. DISCUSSIONS: The Government intends to award without discussions but reserves the right to conduct discussions should it be deemed in the Government's best interest. SOLICITATION WEBSITES: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found at federal Contract Opportunities website, https://sam.gov and the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module website, https://piee.eb.mil/. Paper copies of the solicitation will not be issued. Telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. To download the solicitation for this project, contractors are required to register at the System for Award Management at https://sam.gov. Amendments, if/when issued, will be posted to the above referenced websites for electronic downloading. This will be the only method of distributing amendments prior to closing; therefore, it is the Offerors’ responsibility to check the websites periodically for any amendments to the solicitation. The solicitation documents can be downloaded by following the "PIEE Solicitation Module Link for W912QR26RA012" Linkin the Links / Attachments Section below. REGISTRATIONS: Offerors shall have and shall maintain an active registration in the following database: System for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at http://www.sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror. POINT-OF-CONTACT: The point-of-contact for this procurement is Alex Hamilton, Alex.J.Hamilton@usace.army.mil. PARTNERING WITH US: https://www.usace.army.mil/Business-With-Us/Partnering/
-Solicitation07/30/2026
RFIs are clarified. Please see RFI Responses Amendment 0005 Revised.docx.
-Combined Synopsis02/20/2026
AMENDMENT 1 The purpose of this amendment is to add Attachment 3 Spec 26 41 01.0010 Lightning Protection System ----------------------------------------------------------------------------------------------------------- Outdoor Fitness Facility, Building 389— Supply, Delivery, and Limited Installation Support Notice Type: Sources Sought / Market Research Notice Number: HARBSS-2027-01 Contracting Office: 482d CONF/PK Location of Performance: Homestead Air Reserve Base, Florida Response Due Date/Time: November 26, 2026, 5:00 PM EST Response Submission: Nika Salemi, nika.salemi.2@us.af.mil Proposed NAICS Code: 236220, Commercial and Institutional Building Construction Proposed Product Service Code (PSC): 5670 Building Components, Prefabricated 1. Notice Purpose THIS IS A SOURCES SOUGHT NOTICE ISSUED FOR MARKET-RESEARCH AND PLANNING PURPOSES ONLY. THIS NOTICE IS NOT A SOLICITATION, REQUEST FOR PROPOSAL, REQUEST FOR QUOTATION, INVITATION FOR BID, OR COMMITMENT BY THE GOVERNMENT TO AWARD A CONTRACT. The 482d Contracting Flight, Homestead Air Reserve Base (HARB), FL, seeks information from capable commercial sources, including all small-business socioeconomic categories, to determine the availability and capability of firms that can perform the requirement described in Attachment 1 KYJM19-9003 Outdoor Fitness SOW, Red Horse Project, 12 Nov 2026. Responses will be used to support acquisition planning, including consideration of the appropriate contract type, acquisition approach, and potential small-business set-aside strategy. The Government will not reimburse respondents for any costs associated with preparation or submission of information in response to this notice. A response to this notice is not required to respond to a future solicitation, if issued. Any future solicitation will be announced separately. 2. Requirement Overview The 482d Contracting Flight, Homestead Air Reserve Base (HARB), FL is conducting market research for the Outdoor Fitness Facility, Building 389 project at Homestead Air Reserve Base (HARB), Florida. The anticipated requirement is primarily for the procurement, delivery, and associated submittals for construction materials and equipment required to support construction of an outdoor fitness facility. Air Force RED HORSE personnel will perform the majority of construction and installation activities. Contractor installation responsibilities are limited principally to the steel picket fence and, if applicable, a separate lightning-protection system. The contractor would be expected to: Procure and deliver all materials identified in the Government-furnished bill of materials (BOM), Attachment 2 Outdoor Fitness Facility, BOM Template. Furnish the Pre-Engineered Building (PEB) package, including engineered shop drawings and all associated structure materials. Coordinate concrete-truck deliveries to support Government construction execution. Furnish the specified construction equipment for the required durations, fueled and ready for operation at the work site. Install a new steel picket fence, including site restoration for areas disturbed by fence installation. Install a lightning-protection system if the proposed PEB cannot include a compliant built-in lightning-protection system. The provided BOM identifies, among other materials and equipment, rubber fitness flooring, concrete masonry materials, electrical distribution materials, outdoor fans, motion-activated lighting, concrete, base course, PEB-related items, and construction-equipment rentals. 3. Anticipated Scope 3.1 Material Procurement and Delivery The contractor shall be capable of procuring, delivering, and warranting the materials and equipment identified in the Government-furnished BOM. The contractor shall provide required material and equipment submittals before ordering materials, and the Government will approve final submittals in writing before purchase. Anticipated submittals include: Steel picket fence; PEB signed and sealed shop drawings; Outdoor ceiling fans; Lighting; Smart meter; Electrical panel; Fitness flooring; Bird netting; Material warranty plan, including roof, flooring, and other applicable equipment warranties; and Fence material and labor warranty. 3.2 Pre-Engineered Building Package The contractor shall be capable of providing a complete PEB material package based on Government design drawings, including digitally signed and sealed shop drawings prepared by a Professional Engineer. The PEB package is expected to include, at a minimum: Lifting-rack/support beams; A fixed steel beam with predrilled holes for 25-foot ropes; Toe-hold bars located three inches above the finished floor; Factory coating and painting, with Government-selected colors; Medium-bronze exterior roof panels and manufacturer-standard light interior roof panels; Standing seam metal roofing; Gutters and downspouts; Built-in copper lightning protection, where available; and Black, heavy-duty polyethylene bird netting with ¾-inch mesh meeting or exceeding the specified mesh-quality and break-strength requirements. The PEB shall be designed in accordance with the SOW’s specified structural and high-velocity-wind requirements. The SOW requires a minimum 20-year material warranty, a current Miami-Dade Notice of Acceptance for the PEB and insulation, and a roof assembly capable of the stated uplift and wind criteria. Zinc-plated metal is prohibited. 3.3 Lightning Protection System — Conditional Installation If a compliant PEB with built-in lightning protection is unavailable, the contractor shall be capable of furnishing and installing a conventional lightning-protection and grounding system following completion of RED HORSE construction activities. The contractor’s capability should include: Copper lightning-protection materials; Installation shop drawings; UL-listed and labeled components; Fence-bonding connections; Grounding-system testing and test-point documentation; Third-party inspection and written certification by an entity independent of the system designer and installer; and Compliance with the project’s cited lightning-protection requirements. 3.4 Steel Picket Fence Installation and Site Restoration The contractor shall be capable of furnishing and installing a steel picket fence around the outdoor-fitness-facility overhang structure. The fence must be located at least five feet from the roof overhang and include an accessible, lockable gate/door. The fence-related scope includes required access and equipment doors, hardware, and restoration of disturbed areas using St. Augustine sod. 3.5 Construction Equipment The contractor shall be capable of furnishing the construction equipment identified in the BOM for the stated rental periods or project duration. Anticipated equipment includes a 12,000-pound telehandler forklift, skid loaders with buckets and forks, a water truck, scissor lifts, straight-track manlifts, a double-drum roller, a mini excavator with hammer, a dump truck, and concrete forms with pins. Equipment shall be delivered to the project site, fueled, and ready for operation. The contractor will not be responsible for subsequent refueling unless otherwise established in a future solicitation. 3.6 Installation Access and On-Site Requirements Potential sources should be capable of working on an active military installation and complying with applicable installation access, identification, safety, security, and operations-security requirements. For contractor-performed installation work, the contractor must be capable of providing an English-fluent site superintendent who remains on site during contract performance. Excavation, if required, will require coordination and permits before work begins; the SOW specifies that permit requests must be submitted at least three weeks before excavation. Normal anticipated work hours for fence installation are 0730–1630, Monday through Friday, excluding Federal holidays, unless alternate hours are approved in writing. 4. Requested Capability Statement Information Interested firms should submit a capability statement of no more than 10 pages, excluding product literature and certifications. Responses should address the following: Company Information Legal business name; Unique Entity Identifier (UEI); CAGE code, if assigned; SAM registration status and expiration date Physical address; Point of contact, telephone number, and email address; and Identification of any General Services Administration schedule, multiple-award contract, or other contract vehicle the Government could consider, if applicable. Business size and Socioeconomic Status under the proposed NAICS code(s) Business Size Under Proposed NAICS Code 236220 Small Business Status Small Disadvantaged Business Status 8(A) Business Development Program Status HUBZone Small Business Status Service-Disabled Veteran-Owned Small Business Status Veteran-Owned Small Business Status Women-Owned Small Business Status Economically Disadvantaged Women-Owned Small Business Status Technical Capability Demonstrated capability to procure, deliver, and manage the full BOM; Demonstrated capability to furnish a PEB meeting the project’s engineering, wind-resistance, warranty, and Miami-Dade Notice of Acceptance requirements; Ability to provide shop drawings signed and sealed by a qualified Professional Engineer; Capability to provide construction equipment in the quantities and durations described in the BOM; Capability to install steel picket fencing and restore disturbed site areas; and If applicable, capability to install, test, and obtain independent third-party certification of a lightning-protection system. Relevant Experience Provide up to three recent projects of similar size, complexity, and technical characteristics completed within the past five years. For each project, identify the customer, location, period of performance, brief scope, total contract value, and a customer point of contact if release is authorized. Schedule and Supply-Chain Information Estimated lead time for PEB engineering, fabrication, and delivery; Estimated lead time for major material categories and equipment rentals; Known supply-chain risks or long-lead items; Ability to coordinate concrete deliveries; and Recommended phasing approach to support RED HORSE construction. Commerciality and Alternatives Identify whether the proposed supplies are commercial products; Identify any commercially available alternatives that meet or exceed the salient project requirements; Identify material substitutions or specification clarifications that may improve availability, schedule, resiliency, or lifecycle cost; and Clearly identify any requirement that the respondent believes limits competition, along with a technically acceptable alternative. Rough-Order-of-Magnitude Information Provide a nonbinding rough-order-of-magnitude estimate, broken out by: PEB package; Materials procurement and delivery; Construction equipment; Fence installation and site restoration; Conditional lightning-protection installation; and Any other significant cost driver. This information is requested for planning only and will not be treated as an offer or proposal. 5. Response Instructions Submit responses via email to nika.salemi.2@us.af.mil no later than 5:00 PM EST on November 26, 2026. Use the following subject line: Sources Sought Response – Outdoor Fitness Facility B-389 – [Company Name] Email X of X (insert number of the email and total number of emails) Do not submit classified information. If a respondent believes its submission contains proprietary information, the respondent shall clearly identify the specific proprietary portions of its submission. 6. Government Reservation of Rights This Sources Sought notice is issued solely for planning and market-research purposes. The Government may use information received in response to this notice to refine the requirement, determine the appropriate acquisition strategy, assess the availability of capable small-business concerns, and determine whether to issue a future solicitation. The Government is not obligated to issue a solicitation or award a contract as a result of this notice. The Government may revise, cancel, or take no further action regarding this requirement. 7. System for Award Management Firms are encouraged to provide their SAM registration status and expiration date with their response. While SAM registration is not required to submit a response to this Sources Sought notice, any firm submitting an offer or quotation under a future solicitation must be registered in the System for Award Management at the time required by the applicable solicitation and Revolutionary FAR Overhaul requirements.
-Market Research11/26/2026

Additional Details

Solicitation Number

W9127820R0035

Archive Date

Sep 30, 2021

Office Address

MOBILE, AL, 36602-3630