Notice ID: ae08dd099a04476bbeb6d68efb6ef683Solicitation
Two-Phase Design Build of Zone 8 Security Forces Mobility Storage, Tyndall AFB, FL (Bay County, FL)
Archived on April 30, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−06:00
- Posted
- November 18, 2020
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W074 ENDIST MOBILE
- Place of performance
- Tyndall AFB, 32403
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W9127820R0046
- Notice ID
- ae08dd099a04476bbeb6d68efb6ef683
Description
This solicitation requires the Design/Build Construction of a Security Forces Mobility Storage at Tyndall Air Force Base, Florida.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W9127820R0046- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationOct 8, 2020
Two-Phase Design Build of Zone 8 Security Forces Mobility Storage, Tyndall AFB, FL (Bay County, FL)
- 2×SolicitationCurrentNov 5, 2020
Two-Phase Design Build of Zone 8 Security Forces Mobility Storage, Tyndall AFB, FL (Bay County, FL)
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
AMENDMENT 0002 ISSUED. PLEASE SEE ATTACHMENTS FOR MORE DETAIL-------------------------------------------------AMENDMENT 0001 ISSUED. PLEASE SEE ATTACHMENTS FOR MORE DETAIL-------------------------------------------------PROJECT TITLE: DESIGN-BUILD TO BUDGET (DB2B) - TACTICAL UNMANNED AERIAL VEHICLE (TUAV) HANGAR, PROJECT LOCATION: FT. HUACHUCA, ARIZONA, TYPE: DESIGN-BUILD TO BUDGET (DB2B), NAICS CODE 236220. SIZE STANDARD $45,000,000. PLEASE NOTE THAT BUSINESS SIZE IN THE SYSTEM FOR AWARD MANAGEMENT (SAM) IS DETERMINED BY THE NAICS CODE. IF THE VENDOR SIZE IS NOT LISED CORRECTLY FOR A PARTICULAR NAICS CODE IN SAM, THE BUSINESS WILL BE CONSIDERED OTHER THAN A SMALL BUSINESS.THIS PROJECT IS SET-ASIDE 100% FOR SMALL BUSINESS. PROPOSALS RECEIVED FROM CONCERNS THAT ARE NOT SMALL BUSINESS CONCERNS SHALL BE CONSIDERED NONRESPONSIVE AND WILL BE REJECTED. CMMC LEVEL 1 (SELF) REQUIRED FOR AWARD. FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS ACQUISITION. NO CONTRACT AWARD WILL BE MADE UNTIL APPROPRIATED FUNDS ARE MADE AVAILABLE.NOTE: SAM IS COMPLETELY FREE OF CHARGE FOR BOTH REGISTRANTS AND USERS. | 73% | Solicitation | 10/19/2026 |
Construct a non-standard design Tactical Unmanned Aerial Vehicle (TUAV) Hangar for the storage and maintenance of Group 3, Unmanned Aircraft Systems (UAS). The project includes construction of a new addition and the alteration of an existing TUAV Hangar. The project scope comprises one aircraft storage hangar, one covered aircraft re-fueling pit, one covered fuel storage area, two aircraft monitor buildings, two aircraft monitor canopies, and associated aprons and taxiways. The installation of a fire suppression system (Fire and Life Safety Platform) and bundled Utility Monitoring and Control Systems, and Sustainability Energy enhancement measures are included. Supporting facilities include site development, utilities and connections, lighting, paving, walks, curbs and gutters, storm drainage, landscaping and signage. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards are incorporated. Comprehensive building and furnishings related to interior design services are required. Access for individuals with disabilities will be provided. Heating and air conditioning will be provided using self-contained systems. Facilities will be designed to a minimum life of 40 years in accordance with DoD Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Please see attachment for more details. | 73% | Pre-Solicitation | 08/28/2026 |
SOLICITATION NOTICE - DESIGN-BUILD TO BUDGET (DB2B) Airborne Equipment Parachute Repair Shop, Yuma Proving Ground, Yuma, Arizona. The U.S. Army Corps of Engineers (USACE), Los Angeles District, has a requirement for the Design-Build to Budget (DB2B) of the Airborne Equipment Parachute Repair Facility at Yuma Proving Ground, Arizona.This acquisition is a 100 percent Total Small Business Set-Aside conducted in accordance with RFO FAR Part 19 and RFO FAR 36.101-2. The Government is utilizing a Two-Phase Design-Build strategy under a single solicitation. Phase 1 involves a qualification pre-selection process to shortlist up to three (3) of the most highly qualified offerors. Only those selected will be invited to Phase 2 via solicitation amendment. Award will be a competitive Firm-Fixed-Price contract made to the Highest Technically Rated Offeror within the fixed budget ceiling.NAICS: 236220 (Commercial and Institutional Building Construction), size standard $45,000,000.00. PSC: Y1EZ - Construction Of Other Industrial Buildings. Period of Performance: 760 calendar days from receipt of Notice to Proceed.SUBMISSION AND REGISTRATION REQUIREMENTS:Submission Portal: All proposals for solicitation W912PL26RA046 must be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Portal. In order to submit a proposal, contractors must first be registered with the Proposal Manager role in PIEE. Hard copy, email, or facsimile submissions will NOT be accepted.System for Award Management (SAM): All offerors, including any Joint Venture (JV) entities, must have an active and valid registration in the SAM database at the time of proposal submission to be eligible for award. Proposals from contractors without an active SAM registration will not be considered. Registration is free of charge.Amendments: All solicitation documents, amendments, and communications will be posted to both the SAM database and the PIEE Solicitation Portal. It is the responsibility of the offeror to monitor these websites for updates. The Government is not responsible for any inability to access the websites.All Offers and Bidders are also advised that this procurement may be delayed, canceled, or revised at any time during the solicitation, evaluation, and final award process. | 72% | Solicitation | 10/29/2026 |
Pre-Solication notice change 0001: The purpose of this change is to notify prospective offerors of a revision to the anticipated project scope of work: The anticipated facility size is revised from approximately 13,000SF down to approximately 10,315 SF. PRESOLICITATION NOTICE (SYNOPSIS): DESIGN-BUILD TO BUDGET (DB2B) Airborne Equipment Parachute Repair Shop, Yuma Proving Ground, Yuma, Arizona The U.S. Army Corps of Engineers (USACE), Los Angeles District, intends to issue a Request for Proposal (RFP) for the design and construction of the Airborne Equipment Parachute Repair Shop (Airdrop Rigging Facility) located at Yuma Proving Ground (YPG) in Yuma, Arizona. This procurement is a 100% Total Small Business Set-Aside. Proposed Solicitation Number: W912PL26RA046 Product Service Code (PSC): Y1EZ – Construction of Other Industrial Buildings NAICS Code: 236220 – Commercial and Institutional Building Construction Small Business Size Standard: $45.0 Million Set-Aside Status: 100% Total Small Business Set-Aside Contract Type: Firm-Fixed-Price (FFP) Procurement Method: Two-Phase Design-Build Selection Procedures (in accordance with RFO FAR Subpart 36) Acquisition Strategy: Design-Build to Budget (DB2B) Best Value Tradeoff Process SCOPE OF WORK: The anticipated scope of work is for a complete design-build solution for a new, approximately 10,315 square foot climate-controlled Airdrop Rigging Facility. The facility must constructed in close proximity to the existing airdrop rigging, parachute repair facilities and aircraft loading site, to allow for environmentally controlled storage and inspection of rigged materials prior to airdrop. The scope of work includes, but is not limited to: Complete Design & Compliance: Develop a complete design that complies with DoD antiterrorism/force protection requirements (UFC 4-010-01) and ensures a minimum facility life of 40 years in accordance with DoD's Unified Facilities Criteria (including energy efficiencies, building envelope, and integrated building systems performance). Site Work & Utilities: Perform all site work to prepare the building site and account for storm drainage, including moderate site grading, demolition and relocation of an existing fire access lane, connection to nearby utilities, and the construction of a new septic system for sanitary sewer. This section also incorporates the full design, procurement, structural/electrical provisions, and installation of a overhead 50-ton crane. Facility Features: Construct the facility to include a partially raised loading dock, motorized roll-up doors, and specialized storage rooms with adequate spacing for tools, materials, and the joint inspection of materials within the building envelope. Aircraft Cargo Conveyance: Integrate a military aircraft cargo conveyance roller system (compatible with C-130 and C-17 cargo configurations) installed inside multiple high-bay rigging lanes, with the final quantity, layout, and configuration of lanes optimized by the Contractor to maximize throughput and rigging capacity within the fixed budget ceiling. Climate Control HVAC: Install all necessary facility climate-control systems, including self-contained cooling and heating HVAC systems (estimated at 170 tons of capacity) to maintain strict temperature and humidity parameters. Communications & Security: Provide complete communications infrastructure, conduits with pull strings placed under new roadways for future communication installations, and a closed-circuit television (CCTV) system. Commissioning & TAB: Provide full system testing, adjusting, and balancing (TAB) and total building commissioning. Warranty & Maintenance: Deliver a comprehensive warranty and a plan for long-term maintenance support. ACQUISITION STRATEGY This project is being executed as a Design-Build to Budget (DB2B) Two-Phase procurement utilizing the Best Value Tradeoff source selection process under RFO FAR Subpart 36.3 Two-Phase Design-Build Selection Procedures Budget Ceiling: The contract budget ceiling is $8,200,000.00. Offerors compete on value (quality, technical functionality, and durability via proposed "Betterments ") for that set price. Any proposal that exceeds the $8,200,000.00 price cap will be rated Unacceptable and will be ineligible for award or stipend. Selection Process: This will be a negotiated procurement using the Best Value Trade-Off source selection process. Phase I involves a pre-selection process in which the Government will shortlist up to 3 of the most highly qualified offerors. Only those selected during Phase I will be invited to participate in Phase II, which will be initiated through an amendment to the original solicitation. Both Phase I and Phase II will be evaluated in accordance with the evaluation criteria set forth in the solicitation. REGULATORY COMPLIANCE & LIMITATIONS ON SUBCONTRACTING Construction Magnitude: In accordance with RFO FAR 36.204, the estimated magnitude of construction for this project is Between $5,000,000.00 and $10,000,000.00. Limitations on Subcontracting: In accordance with RFO FAR 52.219-14 (Limitations on Subcontracting), the prime contractor must perform at least 15% of the cost of the contract, excluding the cost of materials, with its own employees for this general construction procurement. SAM.GOV and PIEE REGISTRATION Offerors must have and maintain active registrations in the following systems to be eligible for award: System for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at http://www.sam.gov/ to be eligible for a Government contract award. Joint Ventures (JV): If the Offeror is a Joint Venture, the JV entity shall have a valid SAM registration in the SAM database representing the JV as one distinct business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror. PIEE Portal: All proposal volumes must be submitted electronically through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) at https://piee.eb.mil/. It is the responsibility of the Offeror to register and confirm receipt of proposals in PIEE-SOL. SOLICITATION WEBSITE & DISTRIBUTION The official solicitation, when posted on or about 25 September 2026, will be available free of charge by electronic posting only and may be found at the Contracting Opportunities website on http://www.sam.gov/. Paper copies of the solicitation will not be issued. Telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed using Adobe Acrobat Reader. Amendments, if/when issued, will be posted to the above-referenced website for electronic downloading. This will be the only method of distributing amendments prior to closing; therefore, it is the Offeror's responsibility to check the website periodically for any amendments to the solicitation. | 72% | Pre-Solicitation | 09/11/2026 |
Amendment 0002 - Clarified procedures related to Affiliated Company evaluation in accordance with DFARS 215.305(a)(2)(C). No extension has been provided. All other terms and conditions remain unchanged. Amendment 0001/0101 - Proposal due date has bene extended to 18 December 2025 at 1100 hrs vs the PIEE Solicitation Module. Additional Clarification has been provided for the Compliance Gate (in red) on the conformed solicitation. The U.S. Army Corps of Engineers (USAGE) Savannah District is issuing a Two-Phase Design-Build Solicitation for a Multiple Award Task Order Contract under which task orders for General Construction are expected to be issued for projects within the Savannah District area of responsibility (AOR), primarily Georgia and North Carolina. Task Orders issued under any resultant contract(s) will be Firm-Fixed Price and may be either for Design-Build or Design-Bid-Build General Construction Note. This solicitation will result in a D-Type Indefinite Delivery Contract (IDC). Due to changes in the contract writing system and the solicitation timeline, references to other Solicitation numbers may present. W912HN26RA005, W912HN25RA020, & W912HN24R4000 are applicable to this Solicitation. The awarded MATOC Contracts will have a base period of five (5) years. The Government will perform a Best Value Decision using Two-Phase Design-Build selection procedure in accordance with Federal Acquisition Regulation (FAR) Part 36.301. The order limitation of task orders shall range between $7M and $30M. Task orders issued under this MATOC will be firm-fixed price. All other resultant task orders may include options. NAICS: The North American Industry Classification System (NAICS) code is 236220-Commerical and Institutional Building Construction, with a size standard of $45M. Type of Set-Aside: This acquisition is being offered as a 100% Small Business Set-Aside under NAICS code identified above. Proposal Due Date: 18 December 2025 at 1100hrs EST via the PIEE Solicitation Module. Description of Work: Task orders placed under this MATOC shall be that of a design-build, design-bid-build construction, or construction only in nature. This MATOC for General Construction projects is intended to provide an agile acquisition tool to procure new construction, renovation, maintenance or repair and incidental work to include, site work, mechanical systems, plumbing, utility systems, structural, electrical, and HVAC. Evaluation Criteria: The Government will use a best value decision for award of this procurement. Only those Offerors whose proposals provide the best overall value will be awarded contracts with a minimum guarantee of $2,500.00. The evaluation factors for this solicitation and are as follows: Solicitation Compliance Criteria: The government will perform an assessment of minimum "go/no go" or gate solicitation compliance criteria that an offeror's proposal must meet before advancing to Phase One in the proposal evaluation process. This is not an evaluation of any factors, but to confirm the inclusion of the minimum requirements of the proposal as stated in the solicitation. If an offeror does not pass the solicitation compliance criteria review, the proposal is not further evaluated in Phase One and is eliminated from consideration for award preventing additional unnecessary expenditure of the Government's and offeror's time and money on an unviable offer. Each Offeror's Past Performance Summary Sheet (Attachment 2) will be reviewed as part of Phase One Compliance. Each submitted project provided on the project summary sheet will be reviewed against the submission requirements identified in Paragraph 6.2.8. Offeror's submitted projects identified on the Past Performance Summary Sheet (Attachment 2) shall meet the minimum submission requirements of a current or completed awarded project value of no less than $15 Million each and three (3) Design-Build, 2 New Construction and 1 Renovation. Offeror's proposals that meet the minimum submission criteria identified in Paragraph 6.2.8 will be provided a "Go" and the proposal will advance to the Phase One evaluation process. Offeror's proposals that do not meet the minimum submission criteria identified in Paragraph 6.2.8 will receive a "No-Go", and that proposal will not advance to the Phase One Evaluation. Offerors whose proposals receive a "No-Go" will be notified in accordance with FAR 15.503 (a)(1). Attachment 2 shall be completed in its entirety. The Summary Sheet shall be the same projects submitted under FACTOR 1, Past Performance. No narrative information will be reviewed with the Phase One Compliance Review, only the completed fields of the attachment. Factor 1, Past Performance will be evaluated in its entirely after receiving a "Go" from the compliance gate. To ensure the Government can target award to a pool of eight (8) MATOC holders, the Government will target twelve (12) of the most highly qualified offers to advance from Phase One to Phase Two. This solicitation includes a notice to offerors that, pursuant to FAR 15.306(c)(2), the contracting officer may also limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. PHASE One: FACTOR 1: PAST PERFORMANCE FACTOR 2: DESIGN EXPERIENCE The Government will evaluate the performance capability of the proposals in accordance with the criteria provided in the solicitation and will target twelve (12) of the most highly qualified Offerors to participate in Phase Two. PHASE Two: FACTOR 3: TECHNICAL CAPABILITY (Management Approach) PRICE: Price will not be rated but will be a factor in establishing a competitive range prior to discussions (if held) and in making the best value decision for award of any resultant contract(s). In Phase Two of the process, the Government will evaluate both price and technical capability (management approach) The award will be made to a target of eight (8) Offerors whose proposals represent the best overall value to the Government. Awards will be made to the Offerors whose technical submittal and price proposal contain the combination of criteria requested which offers the best overall value to the Government. Proposals shall include sufficient detailed information to allow complete evaluation. The Government reserves the right to reject any and all offers. Offerors are reminded that while the Government may elect to consider data obtained from other sources, the burden of proof of acceptability rests with the Offeror. Consolidation: This MATOC constitutes consolidation in that it combines construction projects at multiple discrete sites into one contract, this approach provides the best combination of competitive procedures, streamlined acquisition, qualified prime contractors, efficient use of manpower, and some cost efficiency—thereby providing the best way to support SAS’s MILCON/Large SRM program. Per FAR 7.107-2(d)(3), quantifiable benefits of administrative/personnel cost savings for this $400 Million procurement must exceed the 10% threshold, or $40 Million, to clearly justify a financial benefit of consolidation. Although the savings demonstrated above do not meet the threshold in FAR 7.107-2(d)(3), when comparing a MATOC and other procurement methods, other benefits are clearly demonstrated. The consolidation of requirements under this MATOC is critical to SAS’s success in meeting DoD requirements can be met when projects are not received in sufficient time to compete as full and open standalone requirements. Although this procurement will be set aside for small businesses, all firms will be invited to compete and will receive fair consideration for a contract under this MATOC. Considering the discussion provided above, consolidation is necessary and justified as the benefits of consolidation substantially exceed the benefits of the alternative contracting approaches. Fulfilling this requirement through separate, stand-alone contracts would result in considerable risk of higher costs and scheduling constraints to the Government. Consolidation of the requirements promotes flexibility to complete the work in the time frame required due to funding constraints. Consolidation will not negatively impact small business participation in these programs but will promote competition and motivate both lower costs to the contractor and overall better pricing for the Government. Solicitation Website: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found on the System of Award Management System (SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Therefore, telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Contractors must register at the SAM website at https://www.sam.gov to download the solicitation for this project. If/when issued, Amendments will be posted to the above-referenced website for electronic downloading. This will be the only method of distributing amendments before closing; therefore, the Offerors must check the website periodically for any amendments to the solicitation. Registrations: System for Award Management (SAM)-Offerors shall maintain an active registration in the SAM database at https://www.sam.gov to be eligible for a Government contract award. Suppose the Offeror is a Joint Venture (JV). In that case, the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If an Offeror is not actively and successfully registered in the SAM database at the time of award, the Government reserves the right to award to the next prospective Offeror. Procurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronic via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried, etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/. Point of Contacts: For this acquisition, the contracting officer, Mr. Greg Graham, whose e-mail address is gregory.m.graham@usace.army.mil., and the Contract Specialist, Alicia Scott whose e-mail address is alicia.d.scott@usace.army.mil. | 70% | Solicitation | 12/18/2025 |
Additional Details
Solicitation Number
W9127820R0046
Archive Date
Apr 30, 2021
Office Address
MOBILE, AL, 36602-3630