Notice ID: 5e1206a0d6c44c428d4734e5e6994505Solicitation
W9127820R0118 - Zone 7, F-35 Munitions Storage Facilities, Tyndall AFB, FL
Archived on December 31, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−05:00
- Posted
- April 2, 2021
- Notice type
- Solicitation
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W074 ENDIST MOBILE
- Place of performance
- Tyndall AFB, FL, 32403
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W9127820R0118
- Notice ID
- 5e1206a0d6c44c428d4734e5e6994505
Description
Design and construct four igloos; new Admin w/ parking; aircraft support equipment storage facility; aircraft support equipment yard and a missile assembly shop for the F-35 mission. This project includes additions to building 7026 (4,800 SF), building 7020 (6,000 SF), building 7025 (2,640 SF) and building 7028 (7,172 SF) and the construction of a new Munitions Assemble Conveyor pad facility.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Amanda M. Milheiser
Secondary Contact
Carl M. Wade
Documents
No documents available.
Lifecycle
Solicitation:
W9127820R0118- Market Research
- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Market ResearchAug 12, 2020
Tyndall Zone 7 Munitions Storage
- Special NoticeFeb 4, 2021
W9127820R0118 - Zone 7, F-35 Munitions Storage Facilities, Tyndall AFB, FL
- Pre-SolicitationMar 15, 2021
W9127820R0118 - Zone 7, F-35 Munitions Storage Facilities, Tyndall AFB, FL
- SolicitationCurrentApr 2, 2021
W9127820R0118 - Zone 7, F-35 Munitions Storage Facilities, Tyndall AFB, FL
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The P002 project is a new construction requirement to deliver for the Navy (Marines) a 3-story Cybersecurity Operations Facility/Administrative facility located at Fort Meade, Maryland. The facility includes secure open office spaces, operational areas, large server area, building utilities and connections, with redundant mechanical and electrical systems, secure telecommunication distribution systems and a loading dock area. Mission support areas include joint staff offices, executive offices, training spaces, collaborative spaces, and meeting rooms.***Amendment 0001 dated 07 April 2025, the purpose of this amendment is to update the fill in provisions and clauses: 52.252-1 Solicitation Provisions Incorporated by Reference, 52.204-8 Annual Representations and Certifications, 52.211-12 Liquidated Damages-Construction, 52.228-1 Bid Guarantee, 252.236-7001 Contract Drawings and Specifications. All other terms and conditions of this solicitation remain unchanged.***Amendment 0002 dated 10 April 2025, the purpose of this amendment is to provide the sign-in sheet from the site visit and to provide a change to the specification All other terms and conditions of this solicitation remain unchanged.*** Amendment 0003 dated 09 May 2025, the purpose of this amendment is to provide the following; 1. RFI responses and its attachments, 2. Revised Proposal Submission Documents, 3. Revised Small Business Participation Plan Document, 4. Certificate of Corporate Authority and SF LLL Form, 5. Update to clause 52.36-1, Performance Work by Contractor, 6., Attachment D Supplemental Pricing Information Condensed, 7., Provide an update to CLIN 0006 8., Extend the solicitation close date from 23 May 2025 at 1100 am (EST) to 06 June 2025 at 1100 am (EST). All other terms and condition of this solicitation remain unchanged. ******Amendment 0004 dated 19 May 2025, the purpose of this amendment is to revise the important notes regarding this acquisition section of the solicitation to incorporate the following language Erosion and Sediment Control and Stormwater Management Permits Are Not Readily Available for This Project. Permits are expected to be received sometime in August 2025. All other terms and conditions of this solicitation remain unchanged.***** Amendment 0005 dated 03 June 2025, the purpose of this amendment is to extend the proposal due date to 20 June 2025 and provide additional responses to request for information. All other terms and conditions remain unchanged.*****Amendment 0006 dated 17 June 2025, the purpose of this amendment is to extend the proposal due date to 08 July 2025 at 1100 am. All other terms and conditions remain the same.*****Amendment 0007 dated 01 July 2025, the purpose of this amendment is to incorporate the following language: The FAR requires the use of Project Labor Agreements (PLAs) in construction projects valued over $35 million. However, the Contracting Officer is currently seeking an exception to the requirement to use a PLA for this project. No exception to the PLA requirement has been granted at this time. A decision regarding the PLA exception is not expected for at least 60 days. The contracting officer will notify offerors of the outcome of the request for exception once known. As a result of this amendment the proposal due date has been extended from 08 July 2025, 1100, am (EDT) to 09 September 2025 at 1100 am (EDT). All other terms and conditions of this amendment remains unchanged.*****Amendment 0008 dated 06 August 2025; A project labor agreement waiver is not applicable to this project. Therefore, Project Labor Agreements are required in accordance with FAR 22.5 Use of Project Labor Agreements for Federal Construction Projects. Offerors shall submit an offer subject to Project Labor Agreement (PLA) requirements in accordance with FAR 22.504, general requirements for project labor agreements. Any PLA reached pursuant to the PLA requirements in the solicitation does not change the terms of the contract or provide for any price adjustment by the Government. The purpose of this amendment is: 1. Incorporate the applicable project labor agreement provisions and clauses; 52.222-33, Notice of Requirement for Project Labor Agreement, 52.222-34, Project Labor Agreement, 2. Include project labor agreement requirements for this solicitation in the Proposal Submission section, Basis for Award section and Important Notes Regarding This Acquisition section of this solicitation, 3. Provide updated language to CLINs 0003, 0004 and 0006, 4. Provide an updated wage determination MD20250082 dated 06/27/2025. No further RFIs will be accepted. All other terms and conditions of this solicitation remain unchanged.*****Amendment 0009 dated 11 August 2025, the purpose of this amendment is to replace sheet CS 101 in its entirety. All other terms and conditions remain unchanged.*****Amendment 0010 dated 18 August 2025, The purpose of this amendment is to notify all offerors that the overall contract is firm fixed-priced. As such all CLINS are included in the firm fixed-price and therefore all allowances for CLINs 0003 and 0004 are included in the firm fixed-price. If during construction American Water or BG and E indicate and can justify their level of effort shall exceed the allowance, the contractor shall follow the USACE REA or modification process as appropriate. Please see notes section of the price schedule for further clarification. A pdf version of the price schedule has also been uploaded to the solicitation. All other terms and conditions for this solicitation remain unchanged.*****Amendment 0011 dated 04 September 2025, The purpose of this amendment is to extend the proposal due date while we determine the proper course of action due to the filing of a COF-C protest. As a result of this amendment, the proposal due date changed from 09 September 2025 at 1100 am (EDT) to 14 October 2025 at 1100 am (EDT). All other terms and conditions of this solicitation remain unchanged.*****Amendment 0012 dated 08 September 2025, The purpose of this amendment is to update the Important Notes Regarding this Acquisition section of the solicitation to re-open the request for information (RFIs) in projnet. All RFIs must be submitted in projnet no later than 15 September 2025 at noon (EDT). Any RFIs received after the due date will not be accepted. All other terms and conditions of this solicitation remain unchanged.*****Amendment 0013 dated 06 October 2025, the purpose of this amendment is to provide the request for information (RFI) responses, Amendment 0013 Summary of Changes and to extend the proposal due date from 14 October 2025 at 1100 am (EDT) to 06 January 2026 at 1100 am (EST). All other terms and conditions of this solicitation remain unchanged.*****Amendment 0014 dated 19 December 2025, the purpose of this amendment is to change the proposal due date from 06 January 2026 at 1100 am (EST) to 24 February 2026 at 1100 am (EST). All other terms and conditions of this solicitation remain unchanged.*****Amendment 0015 dated 30 January 2026, The purpose of this amendment is to provide further clarifications to the Request for Information Responses via document attachments: Amendment 0015 Summary of Drawings Changes, Amendment 0015 Clarifications, AE305 Wall Sections - Exterior Walls, AE306 Wall Sections - Exterior Walls, AE307 Wall Sections - Exterior Walls, AE609 Door Details, AE805 Secure Window Type Schedule, AE806 - Secure Window Details, SF302 - Section and Details and SF306 Section and Details. All other terms and conditions of this solicitation remain unchanged.*****Amendment 0016, dated 30 January 2026, The purpose of this amendment is to, remove the Project Labor Agreement Requirements from this solicitation, remove clause 52.222-33, Notice Requirement for Project Labor Agreement from the solicitation, re-open the Request for Information in Projnet. All RFls must be submitted no later than 06 February 2026 at 1100 am (EST) and to change the proposal due date from 24 February 2026 at 1100 am (EST) to 13 March 2026 at 1100 am (EST). All other terms and conditions of this solicitation remain unchanged.*****Amendment 0017, dated 19 February 2026. The purpose of this amendment is to provide the Request for Information responses, Amendment 0017 Summary of Changes, RFI supporting documents, Wage Determination MD20260082 dated 02 January 2026 and a copy of the price schedule. All other terms and conditions of this solicitation remain unchanged.*****Amendment 0018 dated 03 March 2026, the purpose of this amendment is to provide Amendment 0018 Summary of Changes, Remove existing sheets M502 and M503 and replace them with sheets M-502 Mechanical Details and M-503 Mechanical Details . All other terms and conditions of this solicitation remain unchanged.*****Amendment 0019, dated 12 March 2025, the purpose of this amendment is to provide clarifications to spec 13 27 33.10. Please note, the proposals are due on 13 March 2026 at 1100 Eastern Daylight Time (EDT). All other terms and conditions of this solicitation remain unchanged.***** | 74% | Solicitation | 03/13/2026 |
The purpose of Block 14 (Description of Amendment/Modification): Amendment 0002 toSolicitation W912DY26RA136 (FY26 Luke AFB Dorm Building 635 Renovation) is to incorporatethe following changes:1) Extend the proposal due date from 08 September 2026 to 10 September 2026 at 2PM CDT.Incorporate the following documents:2) Attachment 1: SOW Revision, dated 02 September 20263) Attachment 12: Amended DIV 01Specifications, dated 27 August 20263) Attachment 17: Appendix 16 - Bldg. 635 Concept Floor Plan4) Government Response to Additional Questions.All other terms and conditions of the original solicitation remain unchanged. The Purpose of this Amendment 0003 is to provide submission requirements within Section L. Proposal due date remains unchanged at 10 September 2026, 1400 CDT. | 73% | Solicitation | 09/10/2026 |
AMENDMENT 0009 - This is a design build project to construct a 45,025SF Communications Squadron headquarters facility with reinforced concrete foundation, concrete slab, structural steel frame, standing seam metal roof and exterior. Portions of this facility must be constructed to comply with Intelligence Community Directive 705 criteria and standards. The facility should be compatible with applicable Department of Defense, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective. The facility must be able to withstand wind loads and seismic effects as prescribed in applicable codes and design guides. The facility will include a 500KW generator which is authorized by the Air Force Manual 32-1062. The project will include all supporting facilities such as site improvements, utilities, communications, pavements, parking, and sidewalks necessary to provide a complete and useable facility. Facilities will be designed as permanent construction in accordance with Department of Defense Unified Facilities Criteria 1-200-01.This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facilities Criteria4-010-01.THIS PROJECT IS AN UNRESTRICTED REQUEST FOR PROPOSAL (RFP), BEST VALUE TRADE-OFF. The procurement method used will be 1-step best value trade-off. Eligible offerors will be required to provide a technical and price proposal for consideration of award. The technical proposal will be evaluated based on the evaluation criteria stated in the RFP. When the U.S. Army Corps of Engineers (USACE) uses a Best Value Trade-Off procurement, it is seeking to award a contract to the contractor that provides the greatest overall benefit in response to the requirement, not necessarily the one with the lowest price. This method allows for a tradeoff between non-cost factors and cost/price, and lets the Government accept a proposal that is not the lowest priced or the highest technically rated to achieve the best value. Evaluation Method: The project will be a negotiated procurement using the Best Value Trade-Off process to ensure a competitive, firm-fixed price contract. The solicitation will be available on or about 16 April 2026. The solicitation and all amendments for this acquisition will be posted on SAM.GOV, http://sam.gov/. It is the responsibility of the offerors to check the designated government point of entry - sam.gov - frequently for any amendments or changes to the solicitation. All Offerors are also advised that this procurement may be delayed, cancelled, or revised at any time during the solicitation, evaluation and/or final award process Subcontracting Goals:? The SDVOSB goal of (5% Subcontract value/3% Contract value) is reflective of the 2024 NDAA, number of SDVOSBs among the possible NAICS code scopes and past performance above? The SDB goal is (8% Subcontract value/5% Contract value) given the high numbers of SDBs within the NAICS codes of possible scopes in addition to SDB past performance below and DFARS 219.705-4.? The WOSB goal is (5% Subcontract value/4% Contract) value given the high numbers of WOSBs within the NAICS codes of possible scopes in addition to WOSB past performance above.? The HUB goal is (1.5% Subcontract value/1% Contract) value given the very low numbers of HUBs within the NAICS codes of possible scopes in addition to the HUB past performance above.? The SB goal is (40% Subcontract value/30% Contract) given the high numbers of SBs within the NAICS codes of possible scopes in addition to the SB past performance above. This SB goal is higher than the DoD recommended goal of 30% | 73% | Solicitation | 08/12/2026 |
This is a design build project to construct a 45,025SF Communications Squadron headquarters facility with reinforced concrete foundation, concrete slab, structural steel frame, standing seam metal roof and exterior. Portions of this facility must be constructed to comply with Intelligence Community Directive 705 criteria and standards. The facility should be compatible with applicable Department of Defense, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective. The facility must be able to withstand wind loads and seismic effects as prescribed in applicable codes and design guides. The facility will include a 500KW generator which is authorized by the Air Force Manual 32-1062. The project will include all supporting facilities such as site improvements, utilities, communications, pavements, parking, and sidewalks necessary to provide a complete and useable facility. Facilities will be designed as permanent construction in accordance with Department of Defense Unified Facilities Criteria 1-200-01.This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facilities Criteria4-010-01.THIS PROJECT IS AN UNRESTRICTED REQUEST FOR PROPOSAL (RFP), BEST VALUE TRADE-OFF. The procurement method used will be 1-step best value trade-off. Eligible offerors will be required to provide a technical and price proposal for consideration of award. The technical proposal will be evaluated based on the evaluation criteria stated in the RFP. When the U.S. Army Corps of Engineers (USACE) uses a Best Value Trade-Off procurement, it is seeking to award a contract to the contractor that provides the greatest overall benefit in response to the requirement, not necessarily the one with the lowest price. This method allows for a tradeoff between non-cost factors and cost/price, and lets the Government accept a proposal that is not the lowest priced or the highest technically rated to achieve the best value. Evaluation Method: The project will be a negotiated procurement using the Best Value Trade-Off process to ensure a competitive, firm-fixed price contract. The solicitation will be available on or about 16 April 2026. The solicitation and all amendments for this acquisition will be posted on SAM.GOV, http://sam.gov/. It is the responsibility of the offerors to check the designated government point of entry - sam.gov - frequently for any amendments or changes to the solicitation. All Offerors are also advised that this procurement may be delayed, cancelled, or revised at any time during the solicitation, evaluation and/or final award processSubcontracting Goals:? The SDVOSB goal of (5% Subcontract value/3% Contract value) is reflective of the 2024 NDAA, number of SDVOSBs among the possible NAICS code scopes and past performance above? The SDB goal is (8% Subcontract value/5% Contract value) given the high numbers of SDBs within the NAICS codes of possible scopes in addition to SDB past performance below and DFARS 219.705-4.? The WOSB goal is (5% Subcontract value/4% Contract) value given the high numbers of WOSBs within the NAICS codes of possible scopes in addition to WOSB past performance above.? The HUB goal is (1.5% Subcontract value/1% Contract) value given the very low numbers of HUBs within the NAICS codes of possible scopes in addition to the HUB past performance above.? The SB goal is (40% Subcontract value/30% Contract) given the high numbers of SBs within the NAICS codes of possible scopes in addition to the SB past performance above. This SB goal is higher than the DoD recommended goal of 30% | 73% | Pre-Solicitation | Open |
***AMENDMENT 0004 WAS POSTED ON 09 JUNE 2026*** ***AMENDMENT 0003 WAS POSTED ON 03 JUNE 2026*** ***AMENDMENT 0002 TO EXTEND THE BID DUE DATE HAS BEEN POSTED ON 21 MAY 2026.*** ***The Site Visit Roster has been uploaded on 05 May 2026.*** ***AMENDMENT 0001 to replace the Plans Set has been posted on 17 April 2026*** **16 April 2026 - An Amendment is forthcoming to provide the missing Plan documents. Please monitor this posting for Amendment 0001** Request for Proposal (RFP) Solicitation Number W912QR26BA007, is issued for the construction a 20,289 SF Area Maintenance Support Activity (AMSA) located at 4148 Edinburg Road, New Castle, PA. Building(s) will be of permanent construction with reinforced concrete foundations; concrete floor slabs; reinforced concrete or masonry walls; low-slope or sloped roof; Heating, Ventilation and Air Conditioning (HVAC); and plumbing, mechanical, security and electrical systems. Supporting facilities include land clearing, paving, concrete aprons, vehicle wash rack/platform, bi-level equipment loading ramp, fencing, general site improvements and utility connections. Facility will be designed as permanent construction in accordance with the DoD Unified facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200- 02, High Performance and Sustainable Building Requirements. This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01. The project duration is estimated at 802 calendar days from Contract Notice to Proceed (NTP). TYPE OF CONTRACT AND NAICS: This RFP will be for one (1) Firm-Fixed-Price (FFP) contract. The North American Industrial Classification System Code (NAICS) for this effort is 236220 - Commercial and Institutional Building Construction. This award is Subject to the Availability of Funds (SAF). TYPE OF SET-ASIDE: This acquisition will be a Full and Open procurement. A small business sub-contracting plan will be required prior to award. SELECTION PROCESS: This is a Design/Bid/Build procurement, Invitation For Bid (IFB), sealed bid. DISCUSSIONS: The Government intends to award without discussions but reserves the right to conduct discussions should it be deemed in the Governments best interest. SOLICITATION WEBSITES: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found at federal Contract Opportunities website, https://sam.gov and the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module website, https://piee.eb.mil/. Paper copies of the solicitation will not be issued. Telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. To download the solicitation for this project, contractors are required to register at the System for Award Management at https://sam.gov. Amendments, if/when issued, will be posted to the above referenced websites for electronic downloading. This will be the only method of distributing amendments prior to closing; therefore, it is the Offerors responsibility to check the websites periodically for any amendments to the solicitation. The solicitation documents can be downloaded by following the "PIEE Solicitation Module Link for W912QR26BA007" Link in the Links / Attachments Section below. REGISTRATIONS: Offerors shall have and shall maintain an active registration in the following database: System for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at http://www.sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror. POINT-OF-CONTACT: The point-of-contact for this procurement is Alex Hamilton, Alex.J.Hamilton@usace.army.mil. PARTNERING WITH US: https://www.usace.army.mil/Business-With-Us/Partnering/ Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ and then clicking on: "View FFP Contract Changes Playbook Here." | 72% | Solicitation | 06/16/2026 |
Additional Details
Solicitation Number
W9127820R0118
Archive Date
Dec 31, 2021
Office Address
MOBILE, AL, 36602-3630