Notice ID: 18c3d6f392dd4a9bbde0afbd18203b85Solicitation
TWO-PHASE DESIGN AND CONSTRUCTION OF INTEGRATED CAPABILITIES OFFICE (ICO) HQ, CAPE CANAVERAL SPACE FORCE STATION, FLORIDA
Archived on November 16, 2022. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM
- Posted
- July 1, 2022
- Notice type
- Solicitation
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W074 ENDIST MOBILE
- Place of performance
- Cape Canaveral, FL
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W9127822R0003
- Notice ID
- 18c3d6f392dd4a9bbde0afbd18203b85
Description
TWO-PHASE DESIGN BUILD INTEGRATED CAPABILITIES OFFICE (ICO) HQ, CAPE CANAVERAL SPACE FORCE STATION, FL (BREVARD COUNTY, FL).THIS PROJECT IS ADVERTISED ON AN UNRESTRICTED BASIS.THIS PROJECT IS A REQUEST FOR PROPOSAL (RFP), TWO-PHASE DESIGN-BUILD SOURCE SELECTION SOLICITATION. The description of work includes the construction of a Headquarters Building approximately 68,000 GSF two-story facility for an Integrated Capabilities Office (ICO) HQ, parking area, and an approximately 16,500 GSF supporting Utilities Area building which consists of a Central Utility Plant and Industrial Shop area utilizing conventional design and construction methods. The first floor of the HQ building includes mixed classification spaces and the entire second floor will be a SCIF with classification Open Storage with Security in Depth (SID) as defined in UFC 4-010-05, Change 1, and ICS 705. Using the six-sided approach, the SCIF perimeter floors, ceilings, and walls require minimum STC 45 per AGS Sound Group 3 with the separation between the first and second floor being STC 50. The program requirements for the facility include administrative spaces, data center, weapons vault, building support, and circulation spaces. The building is a steel framed structure, and the primary exterior materials are tilt-up concrete panels, glass storefront and curtainwall window systems. The interior walls of the Administrative office space shall be metal stud and gypsum board partitions. The Utilities Area is an approximately 16,500 GSF building to house central utilities for mechanical and electrical equipment to support the Headquarters as well as industrial shops and administrative area. The building shall be a pre-engineered metal building with a steel frame, precast exterior wall panels and a sloped standing seam metal roof. Note: In accordance with Section 00 11 00, paragraph 3.1 of the solicitation, submission of electronic proposal packages shall only be via the Procurement Integrated Enterprise Environment (PIEE) website https://wawf.eb.mil OR https://piee.eb.mil OR https://piee.eb.mil/xhtml/unauth/home/login.xhtml. See attachments PIEE Solicitation Module Vendor Access Instructions and SOP PIEE Proposal Manager Offeror for instructions on getting access to the PIEE Solicitation Module and submitting your proposal. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9127822R0003' to obtain more details.*
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W9127822R0003- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Special NoticeOct 13, 2021
Integrated Capabilities Office (ICO) HQ, Cape Canaveral Space Force Station, Florida
- 3×Pre-SolicitationNov 1, 2021
TWO-PHASE DESIGN BUILD INTEGRATED CAPABILITIES OFFICE (ICO) HQ, CAPE CANAVERAL SPACE FORCE STATION, FL (BREVARD COUNTY, FL)
- SolicitationCurrentJul 1, 2022
TWO-PHASE DESIGN AND CONSTRUCTION OF INTEGRATED CAPABILITIES OFFICE (ICO) HQ, CAPE CANAVERAL SPACE FORCE STATION, FLORIDA
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The U.S. Army Corps of Engineers is issuing this special notice to announce an upcoming competition for a design and construction solicitation for HQ USMC Phase 2 Relocatables using Progressive Design Build under 10 USC 2808a Other Transaction Authority for Construction. This notice is for informational and planning purposes to allow interested parties to prepare for and provide feedback prior to the official solicitation release. USACE intends to conduct an Industry Day on 27 October 2026 at 13:00PM CST to provide an overview of the project, acquisition strategy, and anticipated requirements. This event will provide interested parties with an opportunity to gain additional insight into the project and proposed Progressive Design Build approach under an Other Transaction framework, ask questions, and provide input in advance of the solicitation release. General questions from industry participants will be permitted during the Industry Day; however, all discussions and responses provided during the event are considered unofficial and are for informational purposes only. Statements made during the Industry Day do not constitute a commitment, authorization, or binding guidance related to the future Program Solicitation. Official Questions and Answers will be accepted and addressed following the release of the Program Solicitation. Please RSVP via email to Kelvaun Kennedy at Kelvaun.J.Kennedy@usace.army.mil and Johnna Sebben at Johnna.M.Sebben@usace.army.mil NLT 23 October 2026 13:00PM CST. The Government will distribute the Microsoft Teams meeting link via email to all registered participants closer to the scheduled Industry Day. Please ensure your RSVP is submitted by the required deadline to receive the meeting information. UPDATE 0001 is issued to publish the Industry Day briefing slides, formal responses to vendor questions, the official transcript, the event recording, and the list of attendees. To view the event recording, please download and save the attachment as a PDF, then open it directly in Adobe Acrobat to access the embedded link. | 80% | Special Notice | 11/03/2026 |
UPDATE 10/05/2026: Attendance Sheet has been posted to PIEE. UPDATE 10/02/2026: Posted Virtual Industry Day Transcript, and Slides on PIEE, MP4 Video on SAM.gov Attendance Sheet will be posted when it has finished being complied. Notice: Construct four (4) Space Operations Facilities (SOF) at four (4) separate locations in the continental United States. The targeted areas are Grand Forks AFB, North Dakota; Schriever SFB, Colorado; Redstone Arsenal, Alabama; and Kirtland AFB, New Mexico.The Government intends to execute this requirement using other transaction authority under 10 U.S.C. 2808a. The Government will determine whether to use a single umbrella OT Agreement for the four-facility portfolio or multiple OT Agreements based on an evaluation of Government requirements and industry/partner capabilities. That evaluation will be informed by responses to this Sources Sought Notice and may be further informed by responses to a future Request for Qualifications, collaborative pitch meetings, and/or other qualifications-based selection procedures, as appropriate and consistent with the USACE Playbook: Executing Progressive Design-Build (PDB) with Other Transaction Authority (OTA). | 78% | Market Research | 10/15/2026 |
This is NOT a FAR Part 15 pre-solicitation notice. The Government anticipates issuing a Request for White Papers to establish an Other Transaction Agreement for Progressive Design Build for the Tyndall Deployment Center- Crash/Fire Rescue Station- Demo Hangar 4 project at Tyndall Air Force Base, Florida. The Government is providing the attached documentation as For Information Only (FIO) in advance of the Request for White Papers for this project. No contract or agreement will result from this announcement. This posting is strictly FIO. | 77% | Pre-Solicitation | 11/10/2026 |
The Cyber National Mission Force - Mission Operations Facility (CNMF-MOF) project requirements focus on the design and construction of a State-of-the-Art Mission building within the Central Campus site at Ft. Meade, Maryland. The primary facility is approximately 750,000 gross square feet (GSF) in size and will accommodate approximately 2,400 people. The state-of-the-art facility shall allow for a variety of tenant occupancy functions and flexible size and configurations to conduct the mission, administrative, and support services. The project also includes the expansion of the multi-level East Campus Parking Structure 4 (ECPS 4) for 1,758 spaces of structured parking. The overall CNMF-MOF parking requirement is 85% of the MOF projected seat count and may be accommodated through the expansion of ECPS 4 and surface parking. All required utilities, connections, and secure telecommunication distribution systems shall be fully integrated into the facilities. The project also includes but is not limited to a pedestrian bridge connecting the CNMF-MOF to the East Campus Building 5 (ECB 5); relocation of the Construction Surveillance Technician (CST) trailers; on-site/off-site roadway improvements; storm water management facilities; site restorations, reforestation; existing on-site utilities improvements; installation of new utilities; demolition of an existing building; and life safety generation. | 76% | Solicitation | 06/29/2026 |
W9127826SC075 Space Port of the Future Infrastructure (SPOTFi) Campus, Cape Canaveral Space Force Station (SFS), FL. This is the official Other Transaction Agreement (OTA) Commercial Solutions Opening (CSO) for projects previously identified as W9127826RA075 and W91278269A075. | 76% | Solicitation | 10/09/2026 |
Additional Details
Solicitation Number
W9127822R0003
Archive Date
Nov 16, 2022
Office Address
MOBILE, AL, 36602-3630