John Day Powerhouse HVAC Upgrades

Archived on December 16, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
3:00 PM PST
Posted
November 14, 2025
Notice type
Sources Sought
NAICS
238220: Plumbing, Heating, and Air-Conditioning Contractors
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTHWESTERN.ENDIST PORTLAND.W071 ENDIST PORTLAND
Place of performance
Rufus, Oregon, 97050
Last updated
Nov 6, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W9127N-26-X-1AWD
Notice ID
44ba2972dc664db38adf7f8bf6173fb8

Description

1.    General. This is a SOURCES SOUGHT and is for informational/market research purposes only. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2.

This Sources Sought is to gain knowledge of the interest, capabilities, and qualifications of industry so the government can make informed business decisions. We are seeking responses from both large and small business members of industry to include: Small Business, Small Disadvantaged Businesses to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Woman-Owned Small Business (WOSB) to include Economically Disadvantaged Women-Owned Small Business (EDWOSB), Service-Disabled Veteran-Owned Small business (SDVOSB) and Veteran Owned Small Business (VOSB). All interested parties are highly encouraged to respond. 

Reponses to this Sources Sought announcement will be used by the Government to make business decisions and to inform potential future solicitations. 

The North American Industrial Classification Code (NAICS) for this requirement is:  238220 
The related size standard is:  $19,000,000.

Formal Sources Sought Response Due – 01DEC2025 at 3:00 pm PDT.

2.    Project Background. The John Day Powerhouse is internally conditioned and ventilated via a mixture of HVAC systems. Most of the existing systems are remnants of the Powerhouse’s original construction (over 50 years ago) except for miscellaneous modifications and repairs performed over the years (Gate Repair Pit modifications, liquid chiller replacements, etc.). The current overall state of the existing HVAC systems is considered poor. Numerous key components have either completely failed (liquid chiller, electrostatic filtration units, pneumatic controls) or are on the verge of failing (pumps, control valves, isolation valves). The failure of the pneumatic controls is one of the more significant issues plaguing the facility. O&M personnel are having to manually control the Powerhouse’s main ventilation system (modulate outside air intakes, manually switchover modes of operation (heating or cooling), etc.). This loss of automation is producing poor system performance and in turn is requiring increased O&M support. To add to these issues, few systems comply with current codes and standards including the life safety and fire protection type. Missing smoke detection, unprotected floor penetrations, missing refrigerant monitoring systems, lack of automatic HVAC shutdown capabilities during a smoke/fire event and improper Battery Storage exhaust are just a few examples. Additionally, space usage and occupancy have both changed over the years and each have had negative impacts on the HVAC systems (original ventilation pathways cutoff, increased cooling demands on the systems, etc.).

3.    Project Scope. This project firstly entails complete replacement of the primary and installation of secondary chillers on two chilled water loops that cool the majority of the powerhouse galleries. The scrapping of the old system and the installation of new chiller skid packages (four skids amounting to nearly 600 tons refrigeration), electrical feeds, chilled water pumps, piping, installation and air handler units is scoped, with re-use of certain elements of these systems based on provided designs in combination with replacement. These systems must be tied into a new automated HVAC control system. While the existing systems are water cooled, only half of the new systems will be water-cooled, so roof-mounted air-cooled condensers in a new location and new installation with all necessary building penetrations, pass-throughs and piping are part of the scope for this work.

Secondly, additional work comprises the modification of the HVAC system into a comprehensive smoke removal system for the powerhouse, including intake and outtake ducting and systematic fire protection measures at all penetrations. This work must include integration of the HVAC controls with the building fire protection system. The HVAC controls must be a comprehensive integrated digital control system replacing all existing pneumatic control systems. Free cooling with passive outside air during cold nights common to the region of Rufus, Oregon and for outside air for smoke ventilation entail the scope including modifications to existing intakes and louvers and building penetrations. 

Thirdly, small scale HVAC units such as mini-splits will be provided for local cooling and heating requirements in specific spaces. These units will require their own electrical supplies, pipe runs, insulation and penetrations. These units must also report data to the central HVAC control system. Comprehensive smoke control must be provided as part of the work. The proposed system must be constructed in an active, operational powerhouse with 6000A, 13.8kV busbars and other heavy electrical equipment, including at levels below headwater where nuisance water intrusion risks are present. Pumps in certain areas must remain operational during the planned work, resulting in noise hazards. The existing fire suppression system must remain active during the planned work. Work includes installation work for ductwork and work to protect floor penetrations in relatively close proximity to electrical busbars so that delineation and safety control of work sites is a priority. Newly installed systems must future-proof the installation against future refrigerant phase-outs. Work involves extensive structural penetrations and structural modifications necessary to support these penetrations, both permanent penetrations for ductwork and plenums and temporary removal of wall sections to remove old equipment and install new equipment. 

Finally, temporary cooling must be provided to the powerhouse during the full scope of the work, at approximately 50% of the rated tonnage capacity of the chilled water system. This will entail portable skid mounted chillers located externally to the powerhouse with temporary pass-thrus for their electrical supply from the powerhouse, and for making connections for chilled water piping to the existing internal powerhouse pipes, with cut-overs as the work progresses.  

4.    
a. Anticipated Construction Schedule:  CENWP intends to advertise (03/26) and award (05/26) Construction Contract with estimated construction completion by the end of calendar year 2027.

b. Estimated Construction Cost (ECC):  The current ECC is between $25,000,000 and $100,000,000. 

c. Number and Type of Contracts: NWP contemplates awarding one (1) Firm Fixed Priced Contract. The acquisition strategy decision has not yet been determined. Maximum Small business participation is being sought at both the Prime and subcontracting levels. 

d. Anticipated Source Selection Process:  The expected method to determine the best value to the government is Invitation For Bid (IFB)


5.    Project Specific Constraints and Challenges: 

•    This project requires at least 50% of the cooling systems to remain operational at any time using temporary chillers which must be sourced and connected to the existing chilled water system by the contractor.

•    This project requires working in an active powerhouse including installation of ductwork in galleries supporting high voltage busbars and electrical transmission. Power production will not cease during the HVAC work.

•    This project requires working around critical industrial control systems and fire suppression systems without fully inactivating those systems.

•    The project will include a fixed cost line item for asbestos remediation and lead testing, as it is expected that asbestos will be found during surveying before work commences.

•    The project requires installation of a range of HVAC systems depending on the specific space; it is possible that the skillsets between some of the installations (single room minisplits and 200-TR chilled water systems) are sufficiently different that they will need completely different sets of specialists.

•    Significant structural penetrations of massive concrete walls in the powerhouse must be conducted as part of the ducting work, and on a temporary basis for the removal and installation of certain chiller packages and fan assemblies.

•    The HVAC system will also serve smoke removal ventilation functions and must be linked to the fire alarm and suppression control system, which meets strict DOD security requirements.

6.    Questions for Industry:

a.    Is there anything in our SOW that would discourage you from bidding?
b.    Is there anything in our SOW that would cause enhanced pricing uncertainty?
c.    Are there any market conditions or industry practices that you feel the government needs to be aware of?

7.    Submission Instructions. Formal responses to this Sources Sought notice must be submitted electronically (via email) with SUBJECT: Sources Sought – W9127N-26-X-1AWD. Please email to Cory Pfenning, Contracting Officer, at cory.r.pfenning@usace.army.mil and Aragon Liebzeit, Contracting Specialist, at aragon.n.liebzeit@usace.army.mil, before 3:00 pm Pacific Standard time on 01 DEC 25.

Interested parties’ responses to this Sources Sought shall be limited to six (6) pages and shall include the following information:

a.    Firm's name, address, point of contact, phone number, e-mail address, CAGE and Unique Entity ID.

b.    Firm's business category and size:  Large Business (include summary of small business participation metrics), Small Business, Small Disadvantaged Businesses to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Woman-Owned Small Business (WOSB) to include Economically Disadvantaged Women-Owned Small Business (EDWOSB), Service-Disabled Veteran-Owned Small business (SDVOSB) and at the subcontracting level, Veteran Owned Small Business (VOSB).

c.    An explanation of the prime firm’s capabilities, special qualifications/certifications and equipment and describe the work to be self-performed as it pertains to the proposed work outlined in the Project Scope. 

d.    A description of work performed under similar project constraints and challenges listed under paragraph 3.

e.    Project Examples (for Joint Ventures, please include projects completed by the Joint Venture if available): 

•    To be considered for a potential set aside strategy, provide a maximum of three (3), minimum of one (1), (List the critical elements required) project(s). These project examples must be similar in size, scope and complexity to the work described in paragraph 3 of this notice, with a description of each project (to include pertinent qualitative and quantitative information about featured scope elements), and include the following:

Project Title    
Contract Number    
Contract award date    
Customer name, phone number and email address    
Prime or Subcontractor    
Initial contract dollar value    
Final contract dollar value    
Initial contract completion date    
Final contract completion date    
Customer satisfaction    

The Government may verify information in CPARS or PPIRS.

f.    Firm's Joint Venture information if applicable - existing and potential.

g.    Firm's Bonding Capability in the form of a letter from Surety.

h.    Firm's interest and the likelihood in bidding on the solicitation when it is issued. (Refer to planned advertise and performance dates)

i.    Responses to the government’s questions in paragraph 5 and any other information the contractor feels the government needs to be aware of.

8.    Disclaimer and Important Notes. 
a.    This notice does not obligate the Government to award a contract. No reimbursement will be made for any costs associated with providing information in response to this Sources Sought or any follow up information. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's capabilities to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or to provide feedback to respondents with respect to any information submitted. 

b.    All interested firms must be registered in the System for Award Management (SAM) at https://www.sam.gov to have size status considered. You must remain current for the duration of the source selection process to be eligible for award of a Government contract.


 

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

  1. 3
    Version 3Sources SoughtArchivedCurrent

    John Day Powerhouse HVAC Upgrades

    Notice 44ba2972dc664db38adf7f8bf6173fb8 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
11/05/2026: Amendment 1 is attached. 10/29/2026: The solicitation with specifications and the drawings are attached. 10/30/2026: PIEE may label additional documents posted to this solicitation as amendments, even when those documents do not amend the solicitation. Formal solicitation amendments will be identified by amendment number on the SF 30 documents. Bidders should use that numbering sequence, not the PIEE system label to distinguish formal solicitation amendments from other posted documents. The drawing package containing Controlled Unclassified Information (CUI) is now available for restricted access. In accordance with Executive Order 13556, Controlled Unclassified Information, DoD CUI policy, and the PIEE Solicitation Module, access to CUI attachments is restricted to authorized users. The PIEE Solicitation Module requires CUI attachments to be restricted by Commercial and Government Entity (CAGE) Code to protect controlled information. To request access to the CUI solicitation documents, interested offerors shall: 1. Be registered in PIEE. 2. Provide their CAGE Code and CMMC Unique Identifier (UID) number from SPRS/PIEE. 3. Request access through the PIEE Solicitation Module (or by contacting the Contracting personnel).Once the CAGE Code is verified, access to the CUI attachments will be granted as appropriate.
-Solicitation12/28/2026
NOTICE OF SOLICITATION NUMBER CHANGE The solicitation number for the John Day Powerhouse HVAC Upgrades has changed from W9127N26BA006 to W9127N27BA007 due to the fiscal-year transition. This is the same acquisition previously announced here under presolicitation notice number W9127N26BA006. Here is a link to the presolicitation notice under the new number W9127N27BA007: https://sam.gov/workspace/contract/opp/61ff2d54f9114299950236018dce1902/view The U.S. Army Corps of Engineers (USACE) Portland District (NWP) has a requirement for HVAC upgrades at the John Day Dam (JDA) Powerhouse. JDA is approximately 109 miles east of Portland, Oregon, and 275 miles from Seattle, Washington. JDA spans two states, with Units 1–14 located in Sherman County, Oregon, and Units 15–16 in Klickitat County, Washington. Cybersecurity Maturity Model Certification (CMMC). This solicitation requires the contractor and/or subcontractor(s) information system to process, store, or transmit Federal Contract Information (FCI) or Controlled Unclassified Information (CUI), and requires the contractor and/or subcontractor(s) to comply with CMMC requirements. The CMMC level required by this solicitation is: CMMC Level 2 (Self). This CMMC level, or higher, is a condition of award. Prior to award, the apparent successful offeror must have a current CMMC status at Level 2 (Self), or higher, posted in SPRS for each relevant CMMC UID in order to remain eligible for award; failure to meet this requirement will render the offeror ineligible for contract award. CMMC requirements apply to prime contractors and subcontractors throughout the supply chain at all tiers that will process, store, or transmit any FCI or CUI on contractor information systems in the performance of this DoD contract or subcontract. Prime contractors shall comply and shall require subcontractors to comply with and to flow down CMMC requirements, such that compliance will be required throughout the supply chain at all tiers with the applicable CMMC level and assessment type for each subcontract as follows: If a subcontractor will only process, store, or transmit FCI (and not CUI) in performance of the subcontract, then a CMMC status of Level 1 (Self) is required for that subcontractor. If a subcontractor will process, store, or transmit CUI in performance of the subcontract, then a CMMC status of Level 2 (Self), or higher, is required for that subcontractor, and must be current in SPRS prior to subcontract award. Prime contractors are responsible for ensuring that all covered subcontractors obtain and maintain the appropriate CMMC level and assessment type for the information they will process, store, or transmit during performance. For this solicitation, contractors requesting access to documents containing FCI or CUI must have an active SAM registration and a current NIST SP 800‑171 assessment with at least a Basic confidence level recorded in SPRS. Summary of Work: Work includes but is not limited to the following: Complete replacement of the primary and installation of secondary chillers on two chilled water loops serving the majority of the Powerhouse galleries. Demolition and removal of the existing system and installation of four new chiller skid packages totaling approximately 600 tons of refrigeration capacity. New electrical feeds, chilled water pumps, piping, and air handler units, with selective reuse of existing components. Systems must be integrated into a new automated digital HVAC control system. Half of the new systems will be water-cooled; half will be converted to air-cooled. For the air-cooled units, roof-mounted air-cooled condensers will be installed, requiring roof penetrations, piping, and building modifications. HVAC upgrades include new intake and exhaust ducting to prevent smoke propagation through the building in the event of fire, and fire protection measures at all penetrations. HVAC and the building fire protection systems must be fully integrated, replacing all existing pneumatic controls with an integrated digital control system which is capable of functioning to selectively shut down the HVAC to isolate sectors in the event of a fire or smoke event. The work includes mechanical and controls provisions for free cooling using passive outside air during cold nights and modifications to existing intakes, louvers, and penetrations to support smoke ventilation. Localized HVAC units such as mini-splits will be installed for specific spaces, with new electrical supplies, piping, insulation, penetrations, and data reporting to the central HVAC control system. Work will be performed in an active, operational Powerhouse with 6000A, 13.8kV busbars and other heavy electrical equipment, including areas below headwater with nuisance water intrusion risks. Certain pumps must remain operational throughout construction, presenting noise and safety hazards that must be managed. The existing fire suppression system must remain active during construction and be recommissioned upon project completion. Work includes ductwork installation and protection of floor penetrations in close proximity to operational high-voltage electrical busbars, emphasizing strict delineation and safety control of work areas. New systems to be installed must not use refrigerants subject to future refrigerant phase-out schedules (no refrigerant subject to phase-out at any point in the future may be used). Work includes extensive structural penetrations and modifications to support permanent equipment installation including piping, ductwork and new condensing systems. Asbestos abatement and lead mitigation may be required. The anticipated completion date for physical construction is 1,004 calendar days after receiving the Notice to Proceed. The solicitation will be issued as an Invitation for Bids (IFB). This acquisition will result in a single firm-fixed-price contract. The estimated magnitude of construction is between $25M and $100M. This procurement is unrestricted/full and open competition. The North American Industry Classification System (NAICS) code for this action is 238220; Plumbing, Heating, and Air-Conditioning Contractors with a small business size standard of $19M. One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements. This synopsis is not a request for quotes (RFQ), proposals (RFP), or in an invitation for bids (IFB). This is a pre-solicitation notice indicating that a solicitation for a competitive acquisition for the award of one firm-fixed-price contract is intended to be issued via Contract Opportunities at SAM.gov. The tentative solicitation issuance date is October 2026. The solicitation will not be issued less than 15 days from the date of this notice. The specifications and drawings will be included with the solicitation once issued. This announcement is for information and planning purposes only and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. Bids will be due not less than 30 days from the date the solicitation is issued. The definitive bid due date and time will be stated in the solicitation and any associated amendments that may be issued. Contractors are responsible for checking this page for any update(s) to this notice. Pursuant to Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) 4.203-1 (b), firms must be System for Award Management (SAM) registered at the time their bid is submitted. Bids from firms that have not registered or completed their online representations and certifications may be rejected. The initial registration process in SAM may take several weeks. Registration instructions may be obtained, and online registration may be accomplished, at www.SAM.gov
-Pre-SolicitationOpen
NOTICE OF SOLICITATION NUMBER CHANGE The John Day Powerhouse HVAC Upgrades acquisition, previously announced under presolicitation notice number W9127N26BA006, is now identified as W9127N27BA007 due to the fiscal-year transition. This presolicitation notice continues the announcement of the same acquisition under the new number; it does not represent a separate requirement. All subsequent notices and solicitation documents for this acquisition will reference solicitation number W9127N27BA007. The original presolicitation notice under W9127N26BA006 is available here: https://sam.gov/workspace/contract/opp/7efeefdf2b3c493d89f14b5ce67ff62a/view The U.S. Army Corps of Engineers (USACE) Portland District (NWP) has a requirement for HVAC upgrades at the John Day Dam (JDA) Powerhouse. JDA is approximately 109 miles east of Portland, Oregon, and 275 miles from Seattle, Washington. JDA spans two states, with Units 1 through 14 located in Sherman County, Oregon, and Units 15 and 16 in Klickitat County, Washington. Cybersecurity Maturity Model Certification (CMMC). This solicitation requires the contractor and/or subcontractor(s) information system to process, store, or transmit Federal Contract Information (FCI) or Controlled Unclassified Information (CUI), and requires the contractor and/or subcontractor(s) to comply with CMMC requirements. The CMMC level required by this solicitation is: CMMC Level 2 (Self). This CMMC level, or higher, is a condition of award. Prior to award, the apparent successful offeror must have a current CMMC status at Level 2 (Self), or higher, posted in SPRS for each relevant CMMC UID in order to remain eligible for award; failure to meet this requirement will render the offeror ineligible for contract award. CMMC requirements apply to prime contractors and subcontractors throughout the supply chain at all tiers that will process, store, or transmit any FCI or CUI on contractor information systems in the performance of this DoD contract or subcontract. Prime contractors shall comply and shall require subcontractors to comply with and to flow down CMMC requirements, such that compliance will be required throughout the supply chain at all tiers with the applicable CMMC level and assessment type for each subcontract as follows: If a subcontractor will only process, store, or transmit FCI (and not CUI) in performance of the subcontract, then a CMMC status of Level 1 (Self) is required for that subcontractor. If a subcontractor will process, store, or transmit CUI in performance of the subcontract, then a CMMC status of Level 2 (Self), or higher, is required for that subcontractor, and must be current in SPRS prior to subcontract award. Prime contractors are responsible for ensuring that all covered subcontractors obtain and maintain the appropriate CMMC level and assessment type for the information they will process, store, or transmit during performance. For this solicitation, contractors requesting access to documents containing FCI or CUI must have an active SAM registration and a current NIST SP 800 171 assessment with at least a Basic confidence level recorded in SPRS. Summary of Work: Work includes but is not limited to the following: 1. Complete replacement of the primary and installation of secondary chillers on two chilled water loops serving the majority of the Powerhouse galleries. 2. Demolition and removal of the existing system and installation of four new chiller skid packages totaling approximately 600 tons of refrigeration capacity. 3. New electrical feeds, chilled water pumps, piping, and air handler units, with selective reuse of existing components. 4. Systems must be integrated into a new automated digital HVAC control system. 5. Half of the new systems will be water-cooled; half will be converted to air-cooled. For the air-cooled units, roof-mounted air-cooled condensers will be installed, requiring roof penetrations, piping, and building modifications. 6. HVAC upgrades include new intake and exhaust ducting to prevent smoke propagation through the building in the event of fire, and fire protection measures at all penetrations. 7. HVAC and the building fire protection systems must be fully integrated, replacing all existing pneumatic controls with an integrated digital control system which is capable of functioning to selectively shut down the HVAC to isolate sectors in the event of a fire or smoke event. 8. The work includes mechanical and controls provisions for free cooling using passive outside air during cold nights and modifications to existing intakes, louvers, and penetrations to support smoke ventilation. 9. Localized HVAC units such as mini-splits will be installed for specific spaces, with new electrical supplies, piping, insulation, penetrations, and data reporting to the central HVAC control system. 10. Work will be performed in an active, operational Powerhouse with 6000A, 13.8kV busbars and other heavy electrical equipment, including areas below headwater with nuisance water intrusion risks. 11. Certain pumps must remain operational throughout construction, presenting noise and safety hazards that must be managed. 12. The existing fire suppression system must remain active during construction and be recommissioned upon project completion. 13. Work includes ductwork installation and protection of floor penetrations in close proximity to operational high-voltage electrical busbars, emphasizing strict delineation and safety control of work areas. 14. New systems to be installed must not use refrigerants subject to future refrigerant phase-out schedules (no refrigerant subject to phase-out at any point in the future may be used). 15. Work includes extensive structural penetrations and modifications to support permanent equipment installation including piping, ductwork and new condensing systems. 16. Asbestos abatement and lead mitigation may be required. The anticipated completion date for physical construction is 1,004 calendar days after receiving the Notice to Proceed. The solicitation will be issued as an Invitation for Bids (IFB). This acquisition will result in a single firm-fixed-price contract. The estimated magnitude of construction is between $25M and $100M. This procurement is unrestricted/full and open competition. The North American Industry Classification System (NAICS) code for this action is 238220; Plumbing, Heating, and Air-Conditioning Contractors with a small business size standard of $19M. One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements. This synopsis is not a request for quotes (RFQ), proposals (RFP), or an invitation for bids (IFB). This is a pre-solicitation notice indicating that a solicitation for a competitive acquisition for the award of one firm-fixed-price contract is intended to be issued via Contract Opportunities at SAM.gov. The tentative solicitation issuance date is October 29, 2026. The specifications and drawings will be included with the solicitation once issued. This announcement is for information and planning purposes only and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. Bids will be due not less than 30 days from the date the solicitation is issued. The definitive bid due date and time will be stated in the solicitation and any associated amendments that may be issued. Contractors are responsible for checking this page for any update(s) to this notice. Pursuant to Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) 4.203-1 (b), firms must be System for Award Management (SAM) registered at the time their bid is submitted. Bids from firms that have not registered or completed their online representations and certifications may be rejected. The initial registration process in SAM may take several weeks. Registration instructions may be obtained, and online registration may be accomplished, at www.SAM.gov
-Pre-SolicitationOpen
Solicitation number 1240BE27Q0018 is issued as a Request for Quotation (RFQ) for the replacement of an existing 3-ton packaged heat pump system with a new, high efficiency ENERGY STAR certified unit that also satisfies FEMP federal purchasing requirements for energy consuming products. The unit serves the Laboratory at the Santee Experimental Forest located at 3734 SC-402, Cordesville, SC 29434. Please see attached solicitation and supporting documents for a full description of the requirement.
-Combined Synopsis11/24/2026
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 1240BJ27Q0006 is issued as a Request for Quotation (RFQ) for the replacement of the HVAC system at the Tonasket Ranger Station. This will not be an HVAC replacement in-kind for the existing system. The replacement HVAC system shall be designed and installed based upon consideration of current energy standards. Work includes removal of existing HVAC equipment, delegated design, and installation of new HVAC equipment. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238220 Plumbing, Heating, and Air-Conditioning Contractors The small business size standard is $19,000,000.00 This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. Location: The Tonasket Ranger Station Office Building 2007 is located at street address: 1 W Winesap St, Tonasket, Washington 98855.
-Combined Synopsis12/03/2026

Additional Details

Solicitation Number

W9127N-26-X-1AWD

Archive Date

Dec 16, 2025

Office Address

PORTLAND, OR, 97204-3495