Notice ID: 2c9db862194a74455f04889c459e1b93Solicitation
C--COMPUTER AIDED DRAFTING (CAD) SERVICES.
Archived on June 2, 2015. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 7:00 AM UTC+02:00
- Posted
- April 3, 2015
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W071 ENDIST PORTLAND
- Place of performance
- USACE District, Portland Contracting Division (CECT-NWP), P.O. Box 2946 Portland OR 97208-2946 US
- PSC
- C: ARCHITECT/ENGINEER SERVICES
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- W9127N15R0061
- Notice ID
- 2c9db862194a74455f04889c459e1b93
Description
The Contractor (KTR) shall vectorize and/or update Government furnished drawings in MicroStation or AutoCAD format as requested and shall make them available for the Government to download. Electronic files in TIFF or PDF format of the drawings or sketches will be delivered to the KTR for vectorizing. These files may also include redlines for incorporation. Existing CAD files requiring updating will be delivered to the KTR in MicroStation or AutoCAD format with the accompanying TIFF or PDF file including the redlines. All drawings shall conform to the current USACE CAD standards that will be furnished by the Government. All metadata in the file shall be fully functional and correct and file shall print correctly with Government print settings. The KTR shall ensure that the metadata delivered is compliant with the International Organization for Standardization (ISO) 19115-1:2014, North American Profile (NAP). The Standard is available for purchase at: http://www.webstore.ansi.org. Some PDF or TIFF drawings will contain redline markups for incorporation in the final drawings. Unless otherwise determined after award and mutually agreed upon by KTR and Government the following convention for markups shall be followed: Notes to the drafter will be made in blue ink. Yellow highlighter shall be used by the KTR to track completion of redlines on the redline drawing. Notes or comments back to the Government from the KTR shall be made in green ink. An electronic copy of the completed redline drawings shall be sent back to the Government in TIFF or PDF format. Paperless notes and highlighting are approved. KTR shall notify Government of unclear or ambiguous drawing/model redlines within 3 days of receipt of drawings. Drawings will be sent to the KTR in varying group sizes throughout the duration of the contract, typically 50 to 100 drawings each. Turn-around time for drawings shall be 10 calendar days. To view additional documentation regarding the solicitation please launch this link: https://www.fbo.gov/index?s=opportunity&mode=form&id=66d04f485f1d68ca4df293ca067ad7d3&tab=core&_cview=0 or alternatively: https://acquisition.army.mil/asfi/synopsis_attach_viewer.cfm?psolicitationnbr=W9127N15R006101&pseqnbr=521401&pnot_type=SNOTE
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Robbie Newland, 503-808-4629 USACE District, Portland
Documents
No documents available.
Lifecycle
Solicitation:
W9127N15R0061- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 3×Pre-SolicitationMar 27, 2015
C--COMPUTER AIDED DRAFTING (CAD) SERVICES.
- SolicitationCurrentApr 3, 2015
C--COMPUTER AIDED DRAFTING (CAD) SERVICES.
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W9127N15R0061
Archive Date
Jun 2, 2015