GovChime
Notice ID: 74716c9264d54d6c81cc36440b075937Solicitation

Memaloose and Rocky Island Stabilization

Archived on January 29, 2020. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−08:00
Posted
January 15, 2020
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W071 ENDIST PORTLAND
Place of performance
Downstream of The Dalles Dam on the Columbia River in Wasco County, OR, United States, The Dalles, 97208
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W9127N20B0006
Notice ID
74716c9264d54d6c81cc36440b075937

Description

Memaloose and Rocky Island Stablization: Work consists of stabilizing areas with soil bags and seed mixture due to wind erosion on Memaloose Island and filling holes with soil material on Rocky Island. Access and disturbance to the ground on the islands are required to be minimal. All work on the island(s) must be done by non-mechanical means. Please see attached Solicitation for more information.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W9127N20B0006
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    Pre-SolicitationOct 22, 2019

    Memaloose and Rocky Island Stabilization

    Notice 5e3f766455427f95b452aec7a21a3614 on SAM.gov

  2. 6×
    SolicitationCurrentDec 9, 2019

    Memaloose and Rocky Island Stabilization

    Notice 74716c9264d54d6c81cc36440b075937 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The purpose of Amendment 0001 to Solicitation W912BU26BA026 is as follows: a.) Provide answers to the RFIs submitted. b.) Update FAR Provision 52.252-3, Alterations in Solicitation.The U.S. Army Corps of Engineer (USACE), Philadelphia District (NAP), anticipates a requirement for outfall repair work on Absecon Island, between Absecon Inlet and Great Egg Harbor Inlet, located in Atlantic County, New Jersey. DESCRIPTION: The contract work consists of a Base Bid to repair or extend existing storm water outfalls along the Atlantic Ocean coastline of Absecon Island, Atlantic County, New Jersey. The project area encompasses the municipalities of Atlantic City, Ventnor City, Margate City, and Longport Borough. The Contract work will also consist of various separate Options, if awarded, for additional outfall repairs and construction of accessways across the boardwalk and dunes in locations within and outside of the Base Bid areas. The project work for the Base Bid and Options, if awarded, will include the repair or extension of existing storm water outfalls and drainage structures, including pipe support systems, pile driving, and demolition of existing pipe support systems. It may also include the construction or repair of pedestrian, vehicle, and ADA compliant dune crossovers; the relocation or removal of various existing structures; and additional fill to accommodate the work. DISCLOSURE OF MAGNITUDE OF THE PROPOSED CONSTRUCTION CONTRACT: Base Work Only, Between $15,000,000 AND $20,000,000. (The Government will evaluate the base and option values of bids per RFO 52.217-5 for purposes of determining the lowest bid submitted). NAICS CODE AND SBA SIZE STANDARD: 237990, OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION, Size Standard $45.0M. PERIOD OF PERFORMANCE: 480 Calendar Days from the Notice to Proceed (NTP). SYSTEM FOR AWARD MANAGEMENT (SAM): Bidders are required to be registered in the System for Award Management (SAM) database (https://sam.gov) and PIEE at the time a bid is submitted in order to comply with the annual representations and certifications requirements. Registration for PIEE is required as this is the only place bids shall be submitted. Bids must be submitted in PIEE Solicitation Module. ADDITIONAL INFORMATION: Specific information pertaining to this procurement will be available in the solicitation. The solicitation documents will be posted on the SAM.gov website, https://sam.gov and PIEE Solicitation Module. It is and will continue to be the responsibility of all potential Bidders to monitor the SAM.gov website for any amendments, updates, responses to questions and answers, etc. as the Government will not be maintaining a mailing list.
73%
Solicitation08/03/2026
Please see the attached document for the details of the pre-solicitation notice for W912BU26BA026, Absecon Island Outfalls Repair
73%
Pre-Solicitation06/16/2026
EAGLE ISLAND CELL 2 IMPROVEMENTS
72%
Solicitation08/28/2026
THE PURPOSE OF AMENDMENT 0003 TO SOLICITATION W912BU26BA003 IS TO INCORPORATE THE FOLLOWING: THE GOVERNMENT IS CANCELLING THIS INVITATION FOR BID (IFB) IN ACCORDANCE WITH REVOLUTIONARY FEDERAL ACQUISITION REGULATION (FAR) OVERHAUL (RFO) [1] 14.305, CANCELLATION OF INVITATIONS AFTER OPENING. THE PURPOSE OF AMENDMENT 0002 TO SOLICITATION W912BU26BA003 IS TO INCORPORATE THE FOLLOWING: CHANGES: A). PROVIDE ANSWERS TO THE ADDITIONAL RFIS SUBMITTED B.) UPDATE FAR PROVISION 52.252-3, ALTERATIONS IN SOLICITATION***First Official Amendment** THE PURPOSE OF AMENDMENT 0001 TO SOLICITATION W912BU26BA003 IS TO INCORPORATE THE FOLLOWING CHANGES: A). PROVIDE ANSWERS TO THE RFIS SUBMITTEDB.) UPDATE DFARS CLAUSE 252.236-7001, CONTRACT DRAWINGS AND SPECIFICATIONS, AND FAR PROVISION 52.252-3, ALTERATIONS IN SOLICITATIONC.) UPDATE THE CONTRACTS PERIOD OF PERFORMANCE FROM 275 CALENDAR DAYS TO 305 CALENDAR DAYS AFTER THE NOTICE TO PROCEED (NTP). Please be advised: The solicitation closing date has been corrected to March 30, 2026, at 1300. This is consistent with the current solicitation. ********The U.S. Army Corps of Engineer (USACE), Philadelphia District (NAP), anticipates a requirement for outfall repair work on Absecon Island, between Absecon Inlet and Great Egg Harbor Inlet, located in Atlantic County, New Jersey. The estimated magnitude of this project is between $10,000,000 and $25,000,000. Description: The contract work consists of a Base Bid to repair or extend existing storm water outfalls along the Atlantic Ocean coastline of Absecon Island, Atlantic County, New Jersey. The project area encompasses the municipalities of Atlantic City, Ventnor City, Margate City, and Longport Borough. The Contract work will also consist of various separate Options, if awarded, for additional outfall repairs and construction of accessways across the boardwalk and dunes in locations within and outside of the Base Bid areas. The project work for the Base Bid and Options, if awarded, will include the repair or extension of existing storm water outfalls and drainage structures, including pipe support systems, pile driving, and demolition of existing pipe support systems. It may also include the construction or repair of pedestrian, vehicle, and ADA compliant dune crossovers; the relocation or removal of various existing structures; and additional fill to accommodate the work. The estimated period of performance is 275 calendar days from Notice to Proceed (NTP)SYSTEM FOR AWARD MANAGEMENT (SAM): Bidders are required to be registered in the System for Award Management (SAM) database (https://sam.gov) and PIEE at the time a bid is submitted in order to comply with the annual representations and certifications requirements. Registration for PIEE is required as this is the only place bids shall be submitted. Bids must be submitted in PIEE Solicitation Module. Bids must be submitted in PIEE Solicitation Module. ADDITIONAL INFOMRATION: Specific information pertaining to this procurement will be available in the solicitation. The solicitation documents will be posted on the SAM.gov website, https://sam.gov and PIEE Solicitation Module. It is and will continue to be the responsibility of all potential Bidders to monitor the SAM.gov website for any amendments, updates, responses to questions and answers, etc. as the Government will not be maintaining a mailing list.
69%
Solicitation04/15/2026
Request for Task Order Proposal for Harlow Island Stage 1B The scope of this PWS is to construct Stage I of the Harlow Island HREP. The work in the base contract will involve the construction of embankments and excavations, as well as stripping operations. The contractor will utilize existing project access. The contractor will coordinate as necessary with Burlington Northern San Francisco (BNSF) Railroad for project access. The property is 100% federally owned by the project sponsor, the United States Fish and Wildlife Service.The U.S. Army Corps of Engineers, St. Louis District, is requesting a proposal for the Harlow Island Stage 1B Project. This requirement is being competed amongst the MVS Civil Works and Flood Recovery (PL 84-99) MATOC holders.
67%
AwardedOpen

Additional Details

Solicitation Number

W9127N20B0006

Archive Date

Jan 29, 2020

Office Address