GovChime
Notice ID: f23d226c8129405db4eb782cecda2d05Solicitation

W9127N20B0021 Mouth of the Columbia River Sand Island Test Piles

Archived on June 23, 2020. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−07:00
Posted
June 9, 2020
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
Agency
Department of WarDepartment of the Army

Notice details

Office
W071 ENDIST PORTLAND
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W9127N20B0021
Notice ID
f23d226c8129405db4eb782cecda2d05

Description

THIS IS THE SOLICITATION FOR THE PRESOLICITATION OF THE SAME NAME. Mouth of the Columbia River Sand Island Test Piles - W9127N20B0021 Bid Period: The solicitation was released on 08 May 2020. The bids are due on 08 June 2020. Point of Contact: The USACE-NWP Contracting Office will be the sole point of contact for this action. E-mail responses to the Primary Point of Contact, Charles M Boswell at charles.m.boswell@usace.army.mil. E-mail is the preferred method for receiving responses to this pre-solicitation notice. See attached list of US Fish and Wildlife Service Certified Marbled Murrelet Observers. USACE does not endorse or recommend any of the individual contractors on this list, however, these are currently certified contractors to be observers for this project. AMENDMENT 0001 This is to add the attached list of US Fish and Wildlife Service Certified Marbled Murrelet Observers. USACE does not endorse or recommend any of the individual contractors on this list, however, these are currently certified contractors to be observers for this project. Please see the attachment that contains the answers to the one Bidder Inquiry Received. This is to post the BID ABSTRACT: File titled: C.04 - Abstract - W9127N20B0021_signed.pdf

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W9127N20B0021
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Special NoticeMar 26, 2020

    W9127N20B0021 Mouth of the Columbia River Sand Island Test Piles

    Notice 6e4e1433549b44288be4efe56bb6f3d4 on SAM.gov

  2. Pre-SolicitationApr 16, 2020

    W9127N20B0021 Mouth of the Columbia River Sand Island Test Piles

    Notice 9274b9bf53c3478c9c4259b9de9aba46 on SAM.gov

  3. 4×
    SolicitationCurrentMay 8, 2020

    W9127N20B0021 Mouth of the Columbia River Sand Island Test Piles

    Notice f23d226c8129405db4eb782cecda2d05 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
THIS NOTICE IS POSTED FOR INFORMATIONAL PURPOSES ONLY:NOTICE OF INTENT TO ORDER: THIS OPPORTUNITY IS AVAILABLE ONLY TOTHE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER W912EP25R0010:AGM Marine Contractors Inc. (W912EP25D0011); AHTNA Marine and Construction Company LLC (W912EP25D0012); Atlantic and Gulf Dredging and Marine LLC (W912EP25D0013); Coastal Dredging Co., Inc. (W912EP25D0014); Cottrell Contracting Corporation (W912EP25D0015); Next Generation Logistics LLC. (W912EP25D0016); Southern Dredging Co, Inc. (W912EP25D0017); Southwind Corporation Corp. (W912EP25D0018); and Waterfront Property Servies LLC Gator Services (W912EP25D0019).A Pre-Bid Conference will be held via teleconference on 17 April 2026 @ 1:00PM, EDT. Please utilize the link and call information provided below:- LINK: HTTPS://WWW.MICROSOFT.COM/EN-US/MICROSOFT-TEAMS/JOIN-A-MEETING- Meeting ID: 993 441 032 013 / PASSCODE: Ee9y5By3- DIAL IN BY PHONE: +1 (601) 262-2433 / PHONE CONFERENCE ID: 402 681 300# It is requested that an email be sent to Meredith.C.Gonzalez@usace.army.mil and Timothy.G.Humphrey@usace.army.mil no later than 16 April 2026 at 1:00 PM, EDT to confirm attendance by your organization. DESCRIPTION OF WORK: Project work consists of maintenance dredging at the Marine Corps Support Facility - Blount Island (MCSF-BI) from Station 0+00 to Station 56+09.1 with a 38-foot required Mean Lower Low Water (MLLW) maintenance depth plus two feet of allowable overdepth as shown on the drawings. The placement location of the dredged material will be Dayson Island Disposal Area (D/A-D) as shown on the drawings. Additional work also includes environmental monitoring, turbidity and disposal monitoring, and standby time. NAICS Code 237990, Dredging and Surface Cleanup Activities. The Small Business Standard is $37 million. The Price Target Range is between $1,000,000.00 and $5,000,000.00. The period of performance associated with this requirement is: 125 calendar days after receipt of the Notice to Proceed (NTP). The contractor shall commence work within 60 calendar days of receipt of the Notice to Proceed (NTP). THIS IS A TOTAL SMALL BUSINESS SET-ASIDE REQUIREMENT. Solicitation will be issued in electronic format only and will be posted on the Sam.gov website at https://sam.gov/. In order to receive notification of any amendments to this solicitation, interested vendors must REGISTER AS AN INTERESTED VENDOR on the Sam.gov website at https://sam.gov/. If you are not registered, the Government is not responsible with providing you with notification of any amendments to this solicitation. You must be registered in the System for Award Management (SAM) in order to be eligible to receive an award from this solicitation. For additional information, please call 866-606-8220 or visit the SAM website at https://www.sam.gov/.
67%
Solicitation05/12/2026
PURPOSE: The U.S. Army Corps of Engineer (USACE), Philadelphia District (NAP), anticipates a requirement for the Maintenance Dredging of the Salem River in Salem River in Salem, NJ. DESCRIPTION: Contract work will consist of Maintenance Dredging of the Salem River, NJ federal navigation channel to the authorized depth of 16 ft MLLW plus 2 ft overdepth, non-contour dredging, with the exception of the turning basin which will be 16 ft MLLW plus 1 ft overdepth. Dredging operations will clear approximately 116,000 cubic yards of fine-sand and silty sediment from the channel and turning basin. Beneficial use placement of the dredged channel sediments will be accomplished at designated locations within the US Fish and Wildlife Service?s Supawna Meadows National Wildlife Refuge, Goose Pond area. Turning Basin dredging may have a different placement area at Tilbury Island. The contractor is required to have specialized experience since work requires the beneficial use placement of dredged sediments in sensitive marsh environments of a National Wildlife Refuge. Contractor must be able to demonstrate prior experience on dredging projects involving beneficial use placement techniques within environmentally sensitive coastal marshes and wetlands and knowledge of the dynamic conditions that exist for these placements. No dredging can occur between 1 March and 30 June due to environmental restrictions. DISCLOSURE OF MAGNITUDE OF THE PROPOSED CONSTRUCTION PROJECT: $1,000,000 and $5,000,000.NAICS CODE AND SBA SIZE STANDARD: 237990, Dredging and Surface Cleanup Activities; $37,000,000PERIOD OF PERFORMANCE: The estimated period of performance is 300 calendar days from Notice to Proceed (NTP)SYSTEM FOR AWARD MANAGEMENT (SAM): Bidders are required to be registered in the System for Award Management (SAM) database (https://sam.gov) and PIEE at the time a bid is submitted in order to comply with the annual representations and certifications requirements. Registration for PIEE is required as this is the only place bids shall be submitted. Bids must be submitted in PIEE Solicitation Module. Bids must be submitted in PIEE Solicitation Module. ADDITIONAL INFOMRATION: Specific information pertaining to this procurement will be available in the solicitation. The solicitation documents will be posted on the SAM.gov website, https://sam.gov and PIEE Solicitation Module. It is and will continue to be the responsibility of all potential Bidders to monitor the SAM.gov website for any amendments, updates, responses to questions and answers, etc. as the Government will not be maintaining a mailing list.
67%
Solicitation03/02/2026
The U.S. Army Corps of Engineers (USACE), Baltimore District will be completing maintenance dredging in the upper half of the Wicomico River, Wicomico County, MD. Material will be placed at an existing upland placement site near the river named Sharps Point located in Salisbury, MD. The Magnitude of Construction is $4,000,000.00 to $8,000,000.00. The construction duration will be approximately 120 calendar days from Notice to Proceed.The scope includes using a hydraulic dredge and pipeline in the upper portion of the Wicomico River to remove material to its authorized depth of 14 feet. Approximately 250,000 cubic yards of material consisting of silts, sand, clays, mixed shell, gravel and other materials will be dredged and placed at the Sharps Point site. Minor construction of two weir boxes will also occur at the placement site prior to dredging operations.
66%
Pre-Solicitation10/21/2026
*****Solicitation Notice Update to Post the Bid Abstract on 25 August 2026*****. **Amendment 0002- This amendment is to: A. Extend the invitation for bid due date from 13 August 2026 to 11:00 a.m. Eastern Daylight Time (EDT) on 25 August 2026. This amendment includes two (2) attachments.**Amendment 0001- This amendment is to: A. Provide Summary of Changes dated 06 August 2026, B. Provide clarification to NAICS code 237990 description, C. Provide DQM Pipeline Dredge Specifications for Small Business dated 04 August 2023, D. Provide Final Specifications and Final Plans dated August 2026, E. Incorporate Revolutionary Federal Acquisition Regulation (RFO) Clause 52.219-14 into the solicitation, F. Provide NE River Dredge Pre-Bid Site Visit Sign In Attendees_W912DR26BA010 dated 21 July 2026, G. Provide Wage Determination for MD20260035 - Cecil Co MD dated 04 June 2026, H. Responses to RFIs North East Dredging W912DR26BA0100001 dated 06 August 2026, and I. Revised Price Schedule dated 07 August 2026. This amendment includes nine (9) attachments. The project consists of using a hydraulic cutterhead pipeline dredge in North East River to remove material to its authorized depth of 7 feet (plus two feet of allowable over depth). Up to 100,000 cubic yards of silty to sandy material are to be dredged. Material will be transported via pipeline to the existing upland placement site. Pipeline distance will be approximately 6 miles from the furthest dredging location. The pipeline will travel through the North East River, up Stony Run creek, and over tidal and nontidal wetlands to reach the existing upland placement site. The dredging window is from 16 October 2026 to 15 February 2027; this is the only period of time dredging is allowed in the North East River. The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00. The construction duration will be approximately 120 calendar days from the Notice to Proceed. This invitation for bid has five (5) attachments.
66%
AwardedOpen
*****Solicitation Notice Update to Post the Bid Abstract dated 25 August 2026*****. **Amendment 0002- This amendment is to: A. Extend the invitation for bid due date from 13 August 2026 to 11:00 a.m. Eastern Daylight Time (EDT) on 25 August 2026. This amendment includes two (2) attachments.**Amendment 0001- This amendment is to: A. Provide Summary of Changes dated 06 August 2026, B. Provide clarification to NAICS code 237990 description, C. Provide DQM Pipeline Dredge Specifications for Small Business dated 04 August 2023, D. Provide Final Specifications and Final Plans dated August 2026, E. Incorporate Revolutionary Federal Acquisition Regulation (RFO) Clause 52.219-14 into the solicitation, F. Provide NE River Dredge Pre-Bid Site Visit Sign In Attendees_W912DR26BA010 dated 21 July 2026, G. Provide Wage Determination for MD20260035 - Cecil Co MD dated 04 June 2026, H. Responses to RFIs North East Dredging W912DR26BA0100001 dated 06 August 2026, and I. Revised Price Schedule dated 07 August 2026. This amendment includes nine (9) attachments. The project consists of using a hydraulic cutterhead pipeline dredge in North East River to remove material to its authorized depth of 7 feet (plus two feet of allowable over depth). Up to 100,000 cubic yards of silty to sandy material are to be dredged. Material will be transported via pipeline to the existing upland placement site. Pipeline distance will be approximately 6 miles from the furthest dredging location. The pipeline will travel through the North East River, up Stony Run creek, and over tidal and nontidal wetlands to reach the existing upland placement site. The dredging window is from 16 October 2026 to 15 February 2027; this is the only period of time dredging is allowed in the North East River. The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00. The construction duration will be approximately 120 calendar days from the Notice to Proceed. This invitation for bid has five (5) attachments.
66%
Special NoticeOpen

Additional Details

Solicitation Number

W9127N20B0021

Archive Date

Jun 23, 2020

Office Address

PORTLAND, OR, 97204-3495