Notice ID: 1d7e89226a4142c6ad8f3efda7ddcfc9Solicitation
JOHN DAY LOCK & DAM POWERHOUSE SUBMERGED TRAVELING SCREEN (STS), NEW 130 TON GANTRY CRANE
Archived on March 15, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−07:00
- Posted
- February 9, 2021
- Notice type
- Solicitation
- NAICS
- 333923: Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W071 ENDIST PORTLAND
- Place of performance
- Rufus, OR, 97050
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W9127N20R0005
- Notice ID
- 1d7e89226a4142c6ad8f3efda7ddcfc9
Description
SOLICITATION FOR THE JOHN DAY LOCK & DAM POWERHOUSE SUBMERGED TRAVELING SCREEN (STS), NEW 130 TON GANTRY CRANE – SOLICITATION W9127N20R0005 The U.S. Army Corps of Engineers, Portland District has a new requirement for a New 130 Ton, Submerged Traveling Screen (STS) Gantry Crane, at the John Day Lock and Dam, near Rufus, OR. This work consists of replacing the existing John Day Dam Powerhouse Submerged Traveling Screen (STS) 90 Ton Gantry Crane located at the John Day Lock and Dam, north of Rufus, Oregon. This project will consist of designing, manufacturing, factory testing, transporting, erecting, and field testing a new 130 ton, outdoor gantry crane comprising of a main hoist, an auxiliary hoist, and a latching hoist. The crane system will have built-in capabilities to meet a range of operating conditions, and modes that include: variable speed control; interlocking operating mode controls to eliminate operating hazards, reduce safety risks, and prevent use of systems that could result in equipment damage. The crane will need to be able to adapt to lifting different loads and load types under changing outdoor environmental conditions (such as high winds and variable weather conditions), and the ability to manage and handle loads underwater over a wide elevation range. In addition to the new crane work, the contractor will deconstruct/disassemble the existing 90 Ton STS Crane and safely remove it, in compliance with all environmental requirements. Known Constraints: 1. At no time during the project shall the powerhouse be without an operational STS gantry crane. The Corps of Engineers will ensure operability of the existing 90 Ton STS gantry crane. 2. The new STS Crane must be assembled at the south end of the rails so that the existing gantry crane can be used by the Government to access all of the main units during the assembly of the new crane. The construction area of the new 130 Ton STS Crane cannot impede the existing STS Crane operations. Based on how the old and new cranes are oriented, once the demolition starts on the existing crane, the new STS Crane will be unavailable for use (due to its location between the end of the runway and the existing crane), that it cannot travel. 3. Demolition of the existing crane will also be at the approved end of the rails as located on the contract drawing(s). The busiest season for trash raking is between 15 March and 15 June. Dependent on approved schedules, the new STS gantry crane should be completed and ready for service no later than 15 April 2022. The existing crane demolition is anticipated to be between 1 August 2022 and 31 August 2022. Both the existing and new STS gantry cranes will be on the same rail at the same time, located at the south end. 4. During construction and demolition phases of the work, road access across the top deck of the dam must be maintained. a. Road closure requests must be coordinated with the COR and Operations. b. For longer term road closures, through access may be limited to the start, middle, and end of the work day. c. At the end of the Contractor's work day the road access must be passable. 5. This solicitation will use a FAR Part 15.101-1 Best Value Tradeoff Process. This is a hybrid supply with construction installation contract. Acquisition will provide for Full and Open Competition. 18 August 2020 Due to numerous requests, additional STS Crane drawings have been uploaded for reference. G2_JD_STS_Reference_Dwgs_Government; G3_JD_STS_Reference_Dwgs_Vendor.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W9127N20R0005- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 2×Pre-SolicitationApr 27, 2020
JOHN DAY LOCK & DAM POWERHOUSE SUBMERGED TRAVELING SCREEN (STS), NEW 130 TON GANTRY CRANE
- 3×SolicitationCurrentJul 28, 2020
JOHN DAY LOCK & DAM POWERHOUSE SUBMERGED TRAVELING SCREEN (STS), NEW 130 TON GANTRY CRANE
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Gantry Crane | 79% | Combined Synopsis | 05/12/2026 |
Outdoor Motorized Gantry Crane | 77% | Combined Synopsis | 07/07/2026 |
Gantry Crane w/ electric hoist | 77% | Solicitation | 02/16/2026 |
Low Level Cranes | 71% | Solicitation | 10/06/2026 |
Chain and Hoist10A2016 GANTRY A SERIES STEEL ADJUSTABLEHEIGHT include Wheel Brakes and FestooningNER2G080SHarrington 8 Ton NER2 Hoist with Geared Trolley 10 foot HOL and 16 foot Pendant | 71% | Combined Synopsis | 04/22/2026 |
Additional Details
Solicitation Number
W9127N20R0005
Archive Date
Mar 15, 2021
Office Address
PORTLAND, OR, 97204-3495