Notice ID: 1bf52178a4e74484b026d8ec38360f24Sources Sought
John Day Control Room Fire Protection
Archived on June 10, 2020. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM UTC−07:00
- Posted
- May 12, 2020
- Notice type
- Sources Sought
- Set-aside
- Small Business Set Aside - Total
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W071 ENDIST PORTLAND
- Place of performance
- Goldendale, 98620
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W9127N20R0037
- Notice ID
- 1bf52178a4e74484b026d8ec38360f24
Description
Sources Sought JOHN DAY CONTROL ROOM FIRE PROTECTION U.S. ARMY CORPS OF ENGINEERS, PORTLAND DISTRICT ISSUED: 05/12/2020 RESPONSES DUE: 05/26/2020 at 5:00 pm THIS IS A SOURCES SOUGHT ANNOUNCEMENT ONLY. This notice does not constitute a commitment by the Government. All information submitted in response to this announcement is voluntary, and the Government will not pay for information requested nor will it compensate any respondent for any cost incurred in developing information provided to the Government. The proposed NAICS code for this procurement is 238210 - Electrical Contractors and Other Wiring Installation Contractors. The US Army Corps of Engineers (USACE) Portland District is searching for Electrical Contractors and Other Wiring Installation Contractors who can provide construction services for The John Day Dam. As part of its market research, USACE Portland District, is issuing this Sources Sought to determine if there exists an adequate number of qualified interested contractors capable of providing the requirement. The Government may use the responses to this Sources Sought for information and planning purposes. This is a construction project to lengthen tenability of the control room for controlled shutdown and emergency operation of the John Day powerhouses. The control room and its emergency egress will be fire hardened and have positive pressurization from an external independent air supply. A master fire alarm control panel and control room operator interface, and multiple fire status annunciation panels at key egress locations will be installed to provide annunciation of fire events from the powerhouse. Fire and smoke detection will be installed in the most critical areas. The work focuses on implementation of fire detection and control room modifications to ensure tenability and emergency egress from the control room during a fire event. Fire safety improvements at the John Day Powerhouse will include to the following items: • Installation of a new Main Fire Alarm Control Panel (MFACP) • Pressurization of the Control Room and an egress path and stairs to the intake deck • Limited new fire detection (air aspirating system) in the main Circuit Breaker Gallery • Limited new fire detection in the Control Room area • Indication to the new MFACP that any of six existing CO2 systems have discharged • Alarm interconnection to the new MFACP from the existing Elevator FACP. NO AWARD WILL MADE FROM THIS INITIAL NOTICE. THIS IS NOT AN INVITATION FOR BIDS OR REQUEST FOR PROPOSALS. Submission Instructions: Please send responses with the subject heading John Day Control Room Fire Protection to Cory Pfenning, email address: cory.r.pfenning@usace.army.mil CAPABILITY STATEMENT TO SHOW INTEREST AND INTENT: Respondents interested in performing the proposed project as a prime contractor should submit a capability statement for consideration that include the following: (In A through F). A. Offerors' name, address, points of contact with telephone numbers and e-mail addresses. B. DUNS number and CAGE code. C. Firm's small business category and Business Size: Small Business (SB), Small Disadvantaged (SDB), including 8(a) firms, Historically Underutilized Business Zones (HUBZone), Women-Owned Small Business (WOSB), including Economically Disadvantaged Women-Owned Small Business (EDWOSB), and Service-Disabled Veteran-Owned Small business (SDVOSB). D. A Statement of Capability (SOC) stating your skills, experience, and knowledge required to perform the specified type of work as described above. This SOC should be a brief description of your company's capabilities. Include a statement detailing any special qualifications and certifications, applicable to the scope of this project, held by your firm and/or in-house personnel. The potential bidders should provide the magnitude and brief references of relevant work they have performed including the following; Projects which required the contractor to select the equipment manufacturer for multiple components of a system that met the salient characteristics of a solicitation and worked together interchangeably Projects installing a Fire Systems that included a capacity of at least 100 addressable intelligent Signaling Line Circuit (SLC) Points Projects that included the installation of/manufacture of a Fire System that included an interface with a smoke presurization system Projects that included the installation of an aspirating smoke detection system Projects that included integration of Fire Systems with building HVAC Systems; Integration consists of, but is not limited to, the ability of the fire system to open/close dampers for air control and turn on/off ventilation fans. E. Indicate whether your company will perform the work directly, or intends to subcontract the work. If subcontracting, identify the percentage of work to be subcontracted. Identify the percentage of work your firm may be capable of directly performing. F. Any other information that would assist in determining your company's capability in performing the described construction work. Responses to the Sources Sought will not be returned. Responders are solely responsible for all expenses associated with responding to this Sources Sought. USACE Portland District will not pay for information received in response to this Sources Sought. Do not submit pricing information in response to this Sources Sought. All responses must be submitted in either Microsoft Word or Adobe Portable Document Format by no later than 5:00 pm Pacific Standard Time on Tuesday, 26 May 2020. Do not include proprietary information in your response. All responses to this Request for Information will be kept confidential. This notice does not obligate the Government to award a contract. No reimbursement will be made for any costs associated with providing information in response to this Special Notice or any follow up information. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Cory Pfenning
Secondary Contact
Ryan S. Shoemaker
Documents
No documents available.
Lifecycle
Solicitation:
W9127N20R0037- Market Research
Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)
- Market ResearchCurrentMay 12, 2020
John Day Control Room Fire Protection
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This project involves the comprehensive upgrade of unserviceable and outdated electrical infrastructure at Mount Morris Dam in Mount Morris, NY.Proposal date has been extended due to SAM.GOV error of not posting amendment. | 63% | Solicitation | 05/29/2026 |
Login at https://piee.eb.mil and search for 'W90VN726RA011' to obtain more details.* | 58% | Combined Synopsis | 04/27/2026 |
11/05/2026: Amendment 1 is attached. 10/29/2026: The solicitation with specifications and the drawings are attached. 10/30/2026: PIEE may label additional documents posted to this solicitation as amendments, even when those documents do not amend the solicitation. Formal solicitation amendments will be identified by amendment number on the SF 30 documents. Bidders should use that numbering sequence, not the PIEE system label to distinguish formal solicitation amendments from other posted documents. The drawing package containing Controlled Unclassified Information (CUI) is now available for restricted access. In accordance with Executive Order 13556, Controlled Unclassified Information, DoD CUI policy, and the PIEE Solicitation Module, access to CUI attachments is restricted to authorized users. The PIEE Solicitation Module requires CUI attachments to be restricted by Commercial and Government Entity (CAGE) Code to protect controlled information. To request access to the CUI solicitation documents, interested offerors shall: 1. Be registered in PIEE. 2. Provide their CAGE Code and CMMC Unique Identifier (UID) number from SPRS/PIEE. 3. Request access through the PIEE Solicitation Module (or by contacting the Contracting personnel).Once the CAGE Code is verified, access to the CUI attachments will be granted as appropriate. | 57% | Solicitation | 12/28/2026 |
NOTICE OF SOLICITATION NUMBER CHANGE The John Day Powerhouse HVAC Upgrades acquisition, previously announced under presolicitation notice number W9127N26BA006, is now identified as W9127N27BA007 due to the fiscal-year transition. This presolicitation notice continues the announcement of the same acquisition under the new number; it does not represent a separate requirement. All subsequent notices and solicitation documents for this acquisition will reference solicitation number W9127N27BA007. The original presolicitation notice under W9127N26BA006 is available here: https://sam.gov/workspace/contract/opp/7efeefdf2b3c493d89f14b5ce67ff62a/view The U.S. Army Corps of Engineers (USACE) Portland District (NWP) has a requirement for HVAC upgrades at the John Day Dam (JDA) Powerhouse. JDA is approximately 109 miles east of Portland, Oregon, and 275 miles from Seattle, Washington. JDA spans two states, with Units 1 through 14 located in Sherman County, Oregon, and Units 15 and 16 in Klickitat County, Washington. Cybersecurity Maturity Model Certification (CMMC). This solicitation requires the contractor and/or subcontractor(s) information system to process, store, or transmit Federal Contract Information (FCI) or Controlled Unclassified Information (CUI), and requires the contractor and/or subcontractor(s) to comply with CMMC requirements. The CMMC level required by this solicitation is: CMMC Level 2 (Self). This CMMC level, or higher, is a condition of award. Prior to award, the apparent successful offeror must have a current CMMC status at Level 2 (Self), or higher, posted in SPRS for each relevant CMMC UID in order to remain eligible for award; failure to meet this requirement will render the offeror ineligible for contract award. CMMC requirements apply to prime contractors and subcontractors throughout the supply chain at all tiers that will process, store, or transmit any FCI or CUI on contractor information systems in the performance of this DoD contract or subcontract. Prime contractors shall comply and shall require subcontractors to comply with and to flow down CMMC requirements, such that compliance will be required throughout the supply chain at all tiers with the applicable CMMC level and assessment type for each subcontract as follows: If a subcontractor will only process, store, or transmit FCI (and not CUI) in performance of the subcontract, then a CMMC status of Level 1 (Self) is required for that subcontractor. If a subcontractor will process, store, or transmit CUI in performance of the subcontract, then a CMMC status of Level 2 (Self), or higher, is required for that subcontractor, and must be current in SPRS prior to subcontract award. Prime contractors are responsible for ensuring that all covered subcontractors obtain and maintain the appropriate CMMC level and assessment type for the information they will process, store, or transmit during performance. For this solicitation, contractors requesting access to documents containing FCI or CUI must have an active SAM registration and a current NIST SP 800 171 assessment with at least a Basic confidence level recorded in SPRS. Summary of Work: Work includes but is not limited to the following: 1. Complete replacement of the primary and installation of secondary chillers on two chilled water loops serving the majority of the Powerhouse galleries. 2. Demolition and removal of the existing system and installation of four new chiller skid packages totaling approximately 600 tons of refrigeration capacity. 3. New electrical feeds, chilled water pumps, piping, and air handler units, with selective reuse of existing components. 4. Systems must be integrated into a new automated digital HVAC control system. 5. Half of the new systems will be water-cooled; half will be converted to air-cooled. For the air-cooled units, roof-mounted air-cooled condensers will be installed, requiring roof penetrations, piping, and building modifications. 6. HVAC upgrades include new intake and exhaust ducting to prevent smoke propagation through the building in the event of fire, and fire protection measures at all penetrations. 7. HVAC and the building fire protection systems must be fully integrated, replacing all existing pneumatic controls with an integrated digital control system which is capable of functioning to selectively shut down the HVAC to isolate sectors in the event of a fire or smoke event. 8. The work includes mechanical and controls provisions for free cooling using passive outside air during cold nights and modifications to existing intakes, louvers, and penetrations to support smoke ventilation. 9. Localized HVAC units such as mini-splits will be installed for specific spaces, with new electrical supplies, piping, insulation, penetrations, and data reporting to the central HVAC control system. 10. Work will be performed in an active, operational Powerhouse with 6000A, 13.8kV busbars and other heavy electrical equipment, including areas below headwater with nuisance water intrusion risks. 11. Certain pumps must remain operational throughout construction, presenting noise and safety hazards that must be managed. 12. The existing fire suppression system must remain active during construction and be recommissioned upon project completion. 13. Work includes ductwork installation and protection of floor penetrations in close proximity to operational high-voltage electrical busbars, emphasizing strict delineation and safety control of work areas. 14. New systems to be installed must not use refrigerants subject to future refrigerant phase-out schedules (no refrigerant subject to phase-out at any point in the future may be used). 15. Work includes extensive structural penetrations and modifications to support permanent equipment installation including piping, ductwork and new condensing systems. 16. Asbestos abatement and lead mitigation may be required. The anticipated completion date for physical construction is 1,004 calendar days after receiving the Notice to Proceed. The solicitation will be issued as an Invitation for Bids (IFB). This acquisition will result in a single firm-fixed-price contract. The estimated magnitude of construction is between $25M and $100M. This procurement is unrestricted/full and open competition. The North American Industry Classification System (NAICS) code for this action is 238220; Plumbing, Heating, and Air-Conditioning Contractors with a small business size standard of $19M. One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements. This synopsis is not a request for quotes (RFQ), proposals (RFP), or an invitation for bids (IFB). This is a pre-solicitation notice indicating that a solicitation for a competitive acquisition for the award of one firm-fixed-price contract is intended to be issued via Contract Opportunities at SAM.gov. The tentative solicitation issuance date is October 29, 2026. The specifications and drawings will be included with the solicitation once issued. This announcement is for information and planning purposes only and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. Bids will be due not less than 30 days from the date the solicitation is issued. The definitive bid due date and time will be stated in the solicitation and any associated amendments that may be issued. Contractors are responsible for checking this page for any update(s) to this notice. Pursuant to Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) 4.203-1 (b), firms must be System for Award Management (SAM) registered at the time their bid is submitted. Bids from firms that have not registered or completed their online representations and certifications may be rejected. The initial registration process in SAM may take several weeks. Registration instructions may be obtained, and online registration may be accomplished, at www.SAM.gov | 57% | Pre-Solicitation | Open |
* Bid Abstract uploaded September 21, 2026. * Amendment 0003 - The purpose of this amendment is to make the following changes to the solicitation: SOLICITATION CLOSING DATE The solicitation closing date is hereby extended from Friday, September 18, 2026, at 9:00 PM Pacific Daylight Time (PDT) to Monday, September 21, 2026, at 9:00 AM Pacific Daylight Time (PDT). NEW SOLICITATION CLOSING DATE: Monday, September 21, 2026, at 9:00 AM Pacific Daylight Time (PDT) BID OPENING The bid opening will be conducted on Monday, September 21, 2026, at 10:00 AM Pacific Daylight Time (PDT). Bids received prior to the solicitation closing date and time will be secured and opened at the date and time specified above. Will send TEAMs link once BID is received. *Amendment 0002 - The purpose of this amendment is to make the following changes to the solicitation: 1. Extend the Solicitation Closing Date: The solicitation closing date is hereby extended by one week, from September 11, 2026, to September 18, 2026. 2. Clarify Bidder Inquiry Deadline: The bidder inquiry provision is revised from: No response will be posted to inquiries after Close of Business on the seventh business day preceding the solicitation due date to: The deadline for submission of bidder inquiries is Close of Business on the seventh business day preceding the solicitation due date. Inquiries received after this deadline may not be answered. 3. Add Pertinent Documents/Attachments: The following six (6) documents/attachments are hereby added to the solicitation: A9 - Work Space Access Trailer and Parking Location, A10 - Pump Access, A11 - Propeller Condition, A12 - JDA Fish Pump rehab drawings, A13 - SouthFishwayPumps_OandM Manual, A14 - SouthFishTurbine-Unit3_OandM Manual (all documents previously designated as CUI have been downgraded) 4. Remove Attachment: Attachment AMD0002_Technical Sections.pdf is hereby removed from the solicitation. 5. Revise Specifications: The following revisions are hereby incorporated into the solicitation specifications: File Section Changes Specifications 15 00 00.03 25 Paragraph 1.4.2 is revised to change pump shaft assembly and propeller assembly to vertical shaft assembly. Paragraph 2.1.2 is revised to change pumpshaft to pump propeller. Specifications 01 10 10.00 25 Paragraph 1.6.b is amended to extend the outage window through June 30, 2028.Specifications 09 97 02.00 25 Paragraph 3.5 is amended to include the extension shaft in the painting schedule. All other terms and conditions of the solicitation remain unchanged.*Amendment 0001 - The purpose of this amendment is to extend the solicitation closing date by two weeks from August 28, 2026 to September 11, 2026. All other terms and conditions of the solicitation remain unchanged. PROJECT TITLE: JOHN DAY FISH PUMP REHABILITATION PROJECT LOCATION: JOHN DAY LOCK AND DAM, RUFUS, OR DESCRIPTION: REMOVAL, REFURBISHMENT, AND REPLACEMENT OF MAJOR COMPONENTS OF FISH PUMP UNIT 1, INCLUDING BUT NOT LIMITED TO SHAFTS, BEARINGS, BEARING BRACKETS, AND RIGHT-ANGLE DRIVE GEARBOXES. MAGNITUDE OF CONSTRUCTION: BETWEEN $5,000,000 - $10,000,000 NAICS: 237990 OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION SIZE STANDARD: $45,000,000 SOCIO-ECONOMIC CONSIDERATIONS: TOTAL SMALL BUSINESS SET-ASIDE Bid Opening: Monday, September 21st, 2026, at 10:00 AM Pacific Daylight Time (PDT). Will send TEAMs link once BID is received. Due to CMMC access requirements, in order to gain access to CUI attachments, please verify your organization has a minimum CMMC Level 1 Self verification and submit your CMMC Unique Identifier Number and CAGE Code via email to joseph.b.jarvis@usace.army.mil and cory.r.pfenning@usace.army.mil. BIDS DUE: Friday, September 18th, 2026, at 09:00 PM Pacific Daylight Time (PDT). BID OPENING: Monday, September 21st, 2026, at 10:00 AM Pacific Daylight Time (PDT). | 56% | Solicitation | 09/21/2026 |
Additional Details
Solicitation Number
W9127N20R0037
Archive Date
Jun 10, 2020
Office Address
PORTLAND, OR, 97204-3495