GovChime
Notice ID: 2772b0909d89438894fa3173aa666a6cSolicitation

FOSTER ELECTRICAL RELIABILITY UPGRADES

Archived on September 7, 2021. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−04:00
Posted
July 28, 2021
Notice type
Solicitation
Agency
Department of WarDepartment of the Army

Notice details

Office
W071 ENDIST PORTLAND
Place of performance
Sweet Home, 97386
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W9127N21R0060
Notice ID
2772b0909d89438894fa3173aa666a6c

Description

THIS POST IS TO CORRECT THE NOTICE ID TO W9127N21R0060 Foster Dam and Powerhouse was constructed in the 1960s and most of the electrical equipment throughout the facility is over 40 years old. While there does not appear to be a standard expected design life for electrical equipment, the industry standard is 35 to 40 years. Some of the factors that affect the expected design life are equipment loading, maintenance, and environmental factors. As such, most of the electrical equipment in the Foster powerhouse should be considered for replacement. Replacement of the existing air blast main unit breakers; new station service equipment, new station service transformers, and new powerhouse motor control centers are recommended. The U. S. Army Corps of Engineers (USACE), Portland District, requires a contractor to replace the existing 4160 V switchgear (including the original air blast main unit breakers with vacuum breakers); replace the existing 480 V double ended-switchgear (including new station service transformers); new powerhouse motor control centers; replacement of powerhouse 480 V CQ panels; the DC system (including new station battery); preferred AC equipment; related protection and controls; new wiring for power, protection, controls, annunciation and ancillaries.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W9127N21R0060
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationJun 30, 2021

    FOSTER ELECTRICAL RELIABILITY UPGRADES

    Notice 911316dabdf1418396b057c8d580a4cc on SAM.gov

  2. 2×
    SolicitationCurrentJul 26, 2021

    FOSTER ELECTRICAL RELIABILITY UPGRADES

    Notice 2772b0909d89438894fa3173aa666a6c on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W9127N21R0060

Archive Date

Sep 7, 2021

Office Address

PORTLAND, OR, 97204-3495