- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W071 ENDIST PORTLAND
- Place of performance
- Tillamook, OR
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- W9127N22B0007
- Notice ID
- 0627a0d6bef94f6387f88792639723b2
Description
4/25/2023: Please find attached, an amendment to reopen the solicitation, negating the action taken through amendment 0008. An award from a bid submitted in response to this solicitation is being considered." ---------------------------------------------------------------------------------------------------------------------------- 4/14/2023: Please find attached, an amendment to cancel the solicitation after bid opening. No award will be made from this solicitation. ---------------------------------------------------------------------------------------------------------------------------- Bid Abstract uploaded. ----------------------------------------------------------------------------------------------------------------------------- Amendment 0004 The purpose of this amendment is to make updates to the following sections in the Specifications: Section 35 52 00.00 25, Page 6: Section 3.3f Section 35 52 00.00 25, Page 9: Section 3.5 See attachment "Amendment 0004 with Comments" for further details. ------------------------------------------------------------------------------------------------------------------------------------------------------ Amendment 0003 The purpose of this amendment is to revise parts of the plans and specs, specifically: 1) The following plan sheets were revised: G-002 G-012 CS101 CS102 CS103 2) The following sections in the specs were revised: Section 31 00 10.00 25, Page 5: Sec 3.4.a (2 revisions) Section 31 00 10.00 25, Page 5: Sect 3.4b Section 31 00 10.00 25, Page 5: Sect 3.4c Section 31 00 10.00 25, Page 5: Sect 3.4d Section 31 00 10.00 25, Page 6: Sect 3.6a (2 revisions) Section 31 11 00.00 25, Page 2: Sect 3.2 Section 32 90 00.00 25, Page 4: Sect 1.4.2a Section 35 20 23.13 25, Page 5: Sect 3.1.4b Attachment 5 - Final IHAs Attachment 7 - SLOPES document with confirmation emails attached at end. -------------------------------------------------------------------------------------------------------------------------------------------------------------- A Subcontracting Plan Template is attached. --------------------------------------------------------------------------------------------------------------------------------------------------------------- Amendment 0002 The purpose of this amendment is to correct the error on the date of the Site Visit. For clarification, the Site Visit is scheduled for August 9, 2022 at 10AM PDT. ----------------------------------------------------------------------------------------------------------------------------------------------------------------- Amendment 0001 The purpose of this amendment is to change the deadline to RSVP for the scheduled site visit. The response date is now Monday, August 8, 2022 at 1400PDT. All other terms and conditions remain unchanged. -------------------------------------------------------------------------------------------------------------------------------------------------------------------- 1. Contract Information. The U.S. Army Corps of Engineers (USACE), Northwestern Division, Portland District (CENWP) has been tasked to solicit a contract for the Tillamook South Jetty Repair. The proposed project will be a competitive, firm-fixed price (FFP) contract. 2. Project Background. The project is located iin Tillamook Bay on the Oregon Coast, about 47 miles south of the mouth of the Columbia River. Tillamook Bay is a tidal estuary about 6 miles long, north to south, and a maximum of 3 miles wide. Five major rivers flow into Tillamook Bay. The ocean entrance to the bay is located at its northern end and is protected by two jetties, a north jetty and a south jetty. The U.S. Army Corps of Engineers (USACE) constructed and maintains the two jetties for the purpose of providing reliable navigation into and out of the bay. The south jetty was constructed in three stages between 1969 and 1979 to a length of 8,025 feet. Since then, the south jetty has received no repairs despite having sustained damage and lost jetty length. A recent apparent increase in the Pacific Ocean wave climate has exposed both jetties to more extreme storm waves, especially the south jetty which is more exposed to southwesterly storm events. The south jetty's head is destroyed, and the trunk continues to be damaged and lose length. Repairs to the south jetty are needed to address existing damage, restore the structural integrity of the jetty, provide additional protection for the north jetty from large southerly waves, reduce navigational hazards to boaters, and ensure safe and reliable passage to shipping traffic. Description of Work. Proposed repairs to the south jetty include rebuilding the jetty head with an approximate 100-foot cap and approximately 1,350 feet of the jetty trunk onto an existing relic structure. The relic structure is a mound of displaced stones from the original jetty formed underwater. The south jetty head section will be constructed with a 40-foot crest width and 1V:2.5H side slopes both channel-side and ocean-side, and a crest elevation of +18 feet NAVD88. The south jetty trunk sections will be constructed with a 30-foot crest width, +18 feet NAVD88 crest elevation, and varying side slopes depending upon location, from 1V:2.5H along the ocean-side and 1V:2.5H to 1V:1.5H along the channel-side. The estimated stone volume required for the south jetty repairs is approximately 9,900 cubic yards (CY) of 180 pounds per cubic foot (pcf) stone, 15,800 CY of 175 pcf stone, and 3,200 CY of 167 pcf stone. Access to the south jetty is from Bayocean Dike Road. The approximate 3-mile section of this road between the Tillamook County Bayocean Peninsula Park parking lot and the south end of the Kincheloe Point, where a barge material off-loading area is available, is an unmaintained, single-lane, dirt road, with several segments that have significant erosional undercutting of the road embankment. This section of road will not support heavy construction vehicles and the truck transport of materials ans to be used only for transport of personnel. The section of Bayocean Dike Road between the material off-loading area at Kincheloe Point and the ocean-most dune line near the south jetty root is an unmaintained, single-lane, dirt road. Prior to using this road section for construction vehicles and equipment, the road section will require vegetation clearing, debris and rock removal, widening, and repairs. In addition, a segment of this road near the end of the jetty root has been washed out and will require reconstruction prior to use. All road improvements will be subject to environmental requirements to protect existing wetland areas adjacent to roads and Western Snowy Plover critical habitat areas near the south jetty root. Previous construction of the south jetty involved use of a material off-loading facility at Kincheloe Point to off-load materials that were barged. The contractor may elect to construct a temporary barge off-loading facility. Dredging would likely be required to allow fully loaded barges to access the material off-loading facility. Based on the conditions at the anticipated material off-loading facility location, it is estimated that 5,000 cubic yards of sediment would be dredged from the area adjacent to the shore where the barge would likely be moored. All dredged material will be transported and placed in the designated staging area near the jetty root and upgraded to enhance Western Snowy Plover critical habitat. The environmental permits obtained for the project would restrict any installation of pilings for the material off-loading facility to an in-water work window between November 1 and February 15. For the south jetty construction work, there is an approximate 47-acre area near the jetty root available for temporary material and equipment staging and storage. Areas used for staging and storage will require grading at project completion. The anticipated period of performance for the repair work is September 2022 through November 2024. The estimated magnitude of construction for this project is between $25,000,000 and $100,000,000. Disclaimer and Important Notes. This notice does not obligate the Government to award a contract. All interested firms must be registered in the System for Award Management (SAM) and remain current for the duration of the contract to be eligible for award of a Government contract.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W9127N22B0007- Market Research
- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Market ResearchDec 8, 2021
Tillamook South Jetty Repairs
- 2×Pre-SolicitationJul 1, 2022
Tillamook South Jetty Repairs - Pre-Solicitation
- 10×SolicitationCurrentAug 1, 2022
Tillamook South Jetty Repairs - Solicitation
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
11/05/2026: The solicitation is attached. NOTICE OF SOLICITATION NUMBER CHANGE The Bonneville Powerhouse II Unwatering Pump Replacement acquisition, previously announced under presolicitation notice number W9127N26BA018, is now identified as W9127N27BA012 due to the fiscal-year transition. This presolicitation notice continues the announcement of the same acquisition under the new number; it does not represent a separate requirement. All subsequent notices and solicitation documents for this acquisition will reference solicitation number W9127N27BA012. The original presolicitation notice under W9127N26BA018 is available here: https://sam.gov/workspace/contract/opp/dce799052d0043619ff7a08ccb237c50/view The U.S. Army Corps of Engineers (USACE) Portland District (NWP) has a requirement for Unwatering Pump Replacement at the Bonneville Lock and Dam Powerhouse II. Contractor access to the work site will be from Interstate 84 on the Oregon side of the Columbia River via Exit 40, approximately four miles west of Cascade Locks, Oregon. All work for this project is in Skamania County, Washington. Cybersecurity Maturity Model Certification (CMMC). This solicitation requires the contractor and or subcontractor(s) information system to process, store, or transmit Federal Contract Information (FCI), and requires the contractor and or subcontractor(s) to comply with CMMC requirements. The CMMC level required by this solicitation is: CMMC Level 1 (Self). This CMMC level, or higher, is a condition of award. Prior to award, the apparent successful bidder must have a current CMMC status at Level 1 (Self), or higher, posted in SPRS for each relevant CMMC UID in order to remain eligible for award; failure to meet this requirement will render the bidder ineligible for contract award. CMMC requirements apply to prime contractors and subcontractors throughout the supply chain at all tiers that will process, store, or transmit any FCI on contractor information systems in the performance of this contract or subcontract. Prime contractors shall comply and shall require subcontractors to comply with and to flow down CMMC requirements, such that compliance will be required throughout the supply chain at all tiers with the applicable CMMC level and assessment type for each subcontract as follows: If a subcontractor will not process, store, or transmit FCI in performance of the subcontract, then no CMMC level is required for that subcontractor. If a subcontractor will only process, store, or transmit FCI in performance of the subcontract, then a CMMC status of Level 1 (Self) is required for that subcontractor. Prime contractors are responsible for ensuring that all covered subcontractors obtain and maintain the appropriate CMMC level and assessment type for the information they will process, store, or transmit during performance. For this solicitation, contractors requesting access to documents containing FCI must have an active SAM registration and a current NIST SP 800 171 assessment with at least a Basic confidence level recorded in SPRS. Summary of Work: Work includes but is not limited to providing all labor, equipment, and materials required to procure, install, and test one vertical turbine unwatering pump assembly per the Contract specifications. The Government will remove the existing pump. Procure and install one 7,000 gpm vertical turbine unwatering pump. Procure and install all the discharge head piping necessary to connect with existing discharge piping to the North pump assembly. Procure and install one 460V, 3 phase motor as detailed in the specifications. Test all equipment prior to commissioning and turning over to the Government. The anticipated completion date for physical construction is 180 calendar days after receiving the Notice to Proceed. The solicitation will be issued as an Invitation for Bids (IFB). This acquisition will result in a single firm-fixed-price contract. The estimated magnitude of construction is between $500,000 and $1,000,000. This acquisition is set-aside 100% for small business concerns. The North American Industry Classification System (NAICS) code for this action is 237990; Other Heavy and Civil Engineering Construction with a small business size standard of $45M. Bid Submission Using the Procurement Integrated Enterprise Environment (PIEE) Only electronic bids will be accepted. Portable Document Format (PDF) is preferred. You must provide pricing, in whole dollar amounts only, for all line items using the Standard Form (SF) 1442 for your bid to be considered. The bidder shall submit its complete bid package electronically through the PIEE Solicitation Module at https://piee.eb.mil/ PIEE Registration and Roles Bidders shall register in PIEE at https://piee.eb.mil/ Within the PIEE Solicitation Module, two vendor roles are available: Proposal Manager and Proposal View Only. The Proposal Manager role is required to upload and submit a bid; the Proposal View Only role will not allow bid submission. The email address used for the PIEE account must match the email address associated with the bidders registration in SAM.gov For step by step instructions on how to submit a bid, refer to the Posting Offer demonstration at: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf Training materials and instructions for using the PIEE Solicitation Module are available under Web Based Training (WBT) at: https://pieetraining.eb.mil/wbt/ Additional PIEE training resources: Proposal Manager Registration Instructions: https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf Proposal Manager Reference Guide: https://pieetraining.eb.mil/wbt/sol/documents/Proposal_Manager.pdf Proposal Manager Submitting an Offer: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf This synopsis is not a request for quotes (RFQ), proposals (RFP), or an invitation for bids (IFB). This is a pre-solicitation notice indicating that a solicitation for a competitive acquisition for the award of one firm-fixed-price contract is intended to be issued via Contract Opportunities at SAM.gov. The tentative solicitation issuance date is November 5, 2026. The specifications will be included with the solicitation once issued. This announcement is for information and planning purposes only and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. Bids will be due not less than 30 days from the date the solicitation is issued. The definitive bid due date and time will be stated in the solicitation and any associated amendments that may be issued. Contractors are responsible for checking this page for any update(s) to this notice. Pursuant to Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) 4.203-1 (b), firms must be System for Award Management (SAM) registered at the time their bid is submitted. Bids from firms that have not registered or completed their online representations and certifications may be rejected. The initial registration process in SAM may take several weeks. Registration instructions may be obtained, and online registration may be accomplished, at www.SAM.gov | - | Solicitation | 12/07/2026 |
NOTICE OF SOLICITATION NUMBER CHANGE The Bonneville Powerhouse II Unwatering Pump Replacement acquisition, previously announced under presolicitation notice number W9127N26BA018, is now identified as W9127N27BA012 due to the fiscal-year transition. This presolicitation notice continues the announcement of the same acquisition under the new number; it does not represent a separate requirement. All subsequent notices and solicitation documents for this acquisition will reference solicitation number W9127N27BA012. The original presolicitation notice under W9127N26BA018 is available here: https://sam.gov/workspace/contract/opp/dce799052d0043619ff7a08ccb237c50/view The U.S. Army Corps of Engineers (USACE) Portland District (NWP) has a requirement for Unwatering Pump Replacement at the Bonneville Lock and Dam Powerhouse II. Contractor access to the work site will be from Interstate 84 on the Oregon side of the Columbia River via Exit 40, approximately four miles west of Cascade Locks, Oregon. All work for this project is in Skamania County, Washington. Cybersecurity Maturity Model Certification (CMMC). This solicitation requires the contractor and or subcontractor(s) information system to process, store, or transmit Federal Contract Information (FCI), and requires the contractor and or subcontractor(s) to comply with CMMC requirements. The CMMC level required by this solicitation is: CMMC Level 1 (Self). This CMMC level, or higher, is a condition of award. Prior to award, the apparent successful bidder must have a current CMMC status at Level 1 (Self), or higher, posted in SPRS for each relevant CMMC UID in order to remain eligible for award; failure to meet this requirement will render the bidder ineligible for contract award. CMMC requirements apply to prime contractors and subcontractors throughout the supply chain at all tiers that will process, store, or transmit any FCI on contractor information systems in the performance of this contract or subcontract. Prime contractors shall comply and shall require subcontractors to comply with and to flow down CMMC requirements, such that compliance will be required throughout the supply chain at all tiers with the applicable CMMC level and assessment type for each subcontract as follows: If a subcontractor will not process, store, or transmit FCI in performance of the subcontract, then no CMMC level is required for that subcontractor. If a subcontractor will only process, store, or transmit FCI in performance of the subcontract, then a CMMC status of Level 1 (Self) is required for that subcontractor. Prime contractors are responsible for ensuring that all covered subcontractors obtain and maintain the appropriate CMMC level and assessment type for the information they will process, store, or transmit during performance. For this solicitation, contractors requesting access to documents containing FCI must have an active SAM registration and a current NIST SP 800 171 assessment with at least a Basic confidence level recorded in SPRS. Summary of Work: Work includes but is not limited to providing all labor, equipment, and materials required to procure, install, and test one vertical turbine unwatering pump assembly per the Contract specifications. The Government will remove the existing pump. Procure and install one 7,000 gpm vertical turbine unwatering pump. Procure and install all the discharge head piping necessary to connect with existing discharge piping to the North pump assembly. Procure and install one 460V, 3 phase motor as detailed in the specifications. Test all equipment prior to commissioning and turning over to the Government. The anticipated completion date for physical construction is 180 calendar days after receiving the Notice to Proceed. The solicitation will be issued as an Invitation for Bids (IFB). This acquisition will result in a single firm-fixed-price contract. The estimated magnitude of construction is between $500,000 and $1,000,000. This acquisition is set-aside 100% for small business concerns. The North American Industry Classification System (NAICS) code for this action is 237990; Other Heavy and Civil Engineering Construction with a small business size standard of $45M. Bid Submission Using the Procurement Integrated Enterprise Environment (PIEE) Only electronic bids will be accepted. Portable Document Format (PDF) is preferred. You must provide pricing, in whole dollar amounts only, for all line items using the Standard Form (SF) 1442 for your bid to be considered. The bidder shall submit its complete bid package electronically through the PIEE Solicitation Module at https://piee.eb.mil/ PIEE Registration and Roles Bidders shall register in PIEE at https://piee.eb.mil/ Within the PIEE Solicitation Module, two vendor roles are available: Proposal Manager and Proposal View Only. The Proposal Manager role is required to upload and submit a bid; the Proposal View Only role will not allow bid submission. The email address used for the PIEE account must match the email address associated with the bidders registration in SAM.gov For step by step instructions on how to submit a bid, refer to the Posting Offer demonstration at: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf Training materials and instructions for using the PIEE Solicitation Module are available under Web Based Training (WBT) at: https://pieetraining.eb.mil/wbt/ Additional PIEE training resources: Proposal Manager Registration Instructions: https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf Proposal Manager Reference Guide: https://pieetraining.eb.mil/wbt/sol/documents/Proposal_Manager.pdf Proposal Manager Submitting an Offer: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf This synopsis is not a request for quotes (RFQ), proposals (RFP), or an invitation for bids (IFB). This is a pre-solicitation notice indicating that a solicitation for a competitive acquisition for the award of one firm-fixed-price contract is intended to be issued via Contract Opportunities at SAM.gov. The tentative solicitation issuance date is November 5, 2026. The specifications will be included with the solicitation once issued. This announcement is for information and planning purposes only and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. Bids will be due not less than 30 days from the date the solicitation is issued. The definitive bid due date and time will be stated in the solicitation and any associated amendments that may be issued. Contractors are responsible for checking this page for any update(s) to this notice. Pursuant to Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) 4.203-1 (b), firms must be System for Award Management (SAM) registered at the time their bid is submitted. Bids from firms that have not registered or completed their online representations and certifications may be rejected. The initial registration process in SAM may take several weeks. Registration instructions may be obtained, and online registration may be accomplished, at www.SAM.gov | - | Pre-Solicitation | Open |
NOTICE OF SOLICITATION NUMBER CHANGE The Bonneville Powerhouse II Unwatering Pump Replacement acquisition, previously announced under this presolicitation notice using number W9127N26BA018, is now identified as W9127N27BA012 due to the fiscal-year transition. All subsequent notices and solicitation documents for this acquisition will reference solicitation number W9127N27BA012. Here is a link to the presolicitation number using the new number (W9127N27BA012): https://sam.gov/workspace/contract/opp/dd44e02c5d0e43a4b10d9ea6146d4a73/view The U.S. Army Corps of Engineers (USACE) Portland District (NWP) has a requirement for Unwatering Pump Replacement at the Bonneville Lock and Dam Powerhouse II. Contractor access to the work site will be from Interstate 84 on the Oregon side of the Columbia River via Exit 40, approximately four miles west of Cascade Locks, Oregon. All work for this project is in Skamania County, Washington. Cybersecurity Maturity Model Certification (CMMC). This solicitation requires the contractor and or subcontractor(s) information system to process, store, or transmit Federal Contract Information (FCI), and requires the contractor and or subcontractor(s) to comply with CMMC requirements. The CMMC level required by this solicitation is: CMMC Level 1 (Self). This CMMC level, or higher, is a condition of award. Prior to award, the apparent successful bidder must have a current CMMC status at Level 1 (Self), or higher, posted in SPRS for each relevant CMMC UID in order to remain eligible for award; failure to meet this requirement will render the bidder ineligible for contract award. CMMC requirements apply to prime contractors and subcontractors throughout the supply chain at all tiers that will process, store, or transmit any FCI on contractor information systems in the performance of this contract or subcontract. Prime contractors shall comply and shall require subcontractors to comply with and to flow down CMMC requirements, such that compliance will be required throughout the supply chain at all tiers with the applicable CMMC level and assessment type for each subcontract as follows: If a subcontractor will not process, store, or transmit FCI in performance of the subcontract, then no CMMC level is required for that subcontractor. If a subcontractor will only process, store, or transmit FCI in performance of the subcontract, then a CMMC status of Level 1 (Self) is required for that subcontractor. Prime contractors are responsible for ensuring that all covered subcontractors obtain and maintain the appropriate CMMC level and assessment type for the information they will process, store, or transmit during performance. For this solicitation, contractors requesting access to documents containing FCI must have an active SAM registration and a current NIST SP 800 171 assessment with at least a Basic confidence level recorded in SPRS. Summary of Work: Work includes but is not limited to providing all labor, equipment, and materials required to procure, install, and test one vertical turbine unwatering pump assembly per the Contract specifications. The Government will remove the existing pump. Procure and install one 7,000 gpm vertical turbine unwatering pump. Procure and install all the discharge head piping necessary to connect with existing discharge piping to the North pump assembly. Procure and install one 460V, 3 phase motor as detailed in the specifications. Test all equipment prior to commissioning and turning over to the Government. The anticipated completion date for physical construction is 180 calendar days after receiving the Notice to Proceed. The solicitation will be issued as an Invitation for Bids (IFB). This acquisition will result in a single firm-fixed-price contract. The estimated magnitude of construction is between $500,000 and $1,000,000. This acquisition is set-aside 100% for small business concerns. The North American Industry Classification System (NAICS) code for this action is 237990; Other Heavy and Civil Engineering Construction with a small business size standard of $45M. Bid Submission Using the Procurement Integrated Enterprise Environment (PIEE) Only electronic bids will be accepted. Portable Document Format (PDF) is preferred. You must provide pricing, in whole dollar amounts only, for all line items using the Standard Form (SF) 1442 for your bid to be considered. The bidder shall submit its complete bid package electronically through the PIEE Solicitation Module at https://piee.eb.mil/ PIEE Registration and Roles Bidders shall register in PIEE at https://piee.eb.mil/ Within the PIEE Solicitation Module, two vendor roles are available: Proposal Manager and Proposal View Only. The Proposal Manager role is required to upload and submit a bid; the Proposal View Only role will not allow bid submission. The email address used for the PIEE account must match the email address associated with the bidders registration in SAM.gov For step by step instructions on how to submit a bid, refer to the Posting Offer demonstration at: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf Training materials and instructions for using the PIEE Solicitation Module are available under Web Based Training (WBT) at: https://pieetraining.eb.mil/wbt/ Additional PIEE training resources: Proposal Manager Registration Instructions: https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf Proposal Manager Reference Guide: https://pieetraining.eb.mil/wbt/sol/documents/Proposal_Manager.pdf Proposal Manager Submitting an Offer: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf This synopsis is not a request for quotes (RFQ), proposals (RFP), or an invitation for bids (IFB). This is a pre-solicitation notice indicating that a solicitation for a competitive acquisition for the award of one firm-fixed-price contract is intended to be issued via Contract Opportunities at SAM.gov. The tentative solicitation issuance date is September 2026. The solicitation will not be issued less than 15 days from the date of this notice. The specifications will be included with the solicitation once issued. This announcement is for information and planning purposes only and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. Bids will be due not less than 30 days from the date the solicitation is issued. The definitive bid due date and time will be stated in the solicitation and any associated amendments that may be issued. Contractors are responsible for checking this page for any update(s) to this notice. Pursuant to Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) 4.203-1 (b), firms must be System for Award Management (SAM) registered at the time their bid is submitted. Bids from firms that have not registered or completed their online representations and certifications may be rejected. The initial registration process in SAM may take several weeks. Registration instructions may be obtained, and online registration may be accomplished, at www.SAM.gov | - | Pre-Solicitation | Open |
Sources Sought: USACE, Portland District: W9127N27BA002 Yaquina River Clamshell Dredging 2027 This announcement is a Sources Sought Synopsis (market survey). This is not a Request for Proposal (RFP). This announcement is not a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. The purpose of this Sources Sought is to determine interested parties, socioeconomic status availability, capabilities, and qualifications. The Government intends to use responses to this sources sought synopsis to make appropriate acquisition decisions for future dredge maintenance requirements. The U.S. Army Corps of Engineers (USACE) Portland District is requesting your help in identifying dredges with the capability and availability to respond to critical dredging work required for the Yaquina River Clamshell Dredging 2027 throughout the Yaquina River downstream of Toledo, OR via clamshell. The total approximate scope is 850,000 cubic yards depending on project needs and funding availability. The in-water work window is 01 July 2027 - 31 October 2027.SUBMISSION REQUIREMENTS FOR RESPONSES TO THIS SOURCES SOUGHT SYNOPSIS Vendors interested in this requirement(s) with Portland District must submit the documentation and meet the requirements identified below. A. General Submission Information: 1. Point of Contact name, email address, and phone number. 2. CAGE Code and Unique Entity ID number (All contractors are required to be registered in the DOD System for Award Management (SAM) via https://www.sam.gov). 3. In the event that the contractor is a small business under NAICS 237990 or that of a similar size standard, state the category of small business, such as 8(a), HUBZone, Veteran Owned Small Business, Woman Owned Small Business, or SDVOSB. 4. Statement of Capability (SOC) Statement of the contractors skills, knowledge, experience, and capability to perform the described work, such as documentation and examples of recent relevant experience and technical competence with dredging. INSTRUCTIONS Submit technical inquires and questions relating to this sources sought in writing via email to: Julia Carlton (Julia.b.carlton2.civ@usace.army.mil) Brandon Lasich (brandon.m.lasich@usace.army.mil)SMALL BUSINESS POINT OF CONTACT The point of contact for small business questions or assistance is the Portland District Deputy for Small Business: Michael Stearns Phone: 410-962-5674Email: Michael.d.stearns@usace.army.mil | - | Market Research | 11/17/2026 |
The U.S. Army Corps of Engineer (USACE) Portland District is soliciting construction firms who are interested in submitting a competitive firm-fixed-price bid for this project. This solicitation announcement is for the repair and rehabilitation of one Tainter Valve (TV1) at The Dalles Lock and Dam (TDA). See the attached Solicitation, which includes the Specifications, and the attached Plan set for all details. The following site visit on Tuesday, 03 November 2026: 2:00 P.M. @ The Dalles Dam (Washington side), Lyle, WA 98635. Take US-197N and exit towards The Dalles Dam Boat Launch and park on the left hand side of the road immediately after turning left 90 degrees towards the Boat Launch; see the attached link up location map. Contractors will be able to see a removed Tainter Valve at The Dalles Dam. Send an email to Andrew Sprys and Justin Figueredo by 11:00 A.M. on Thursday, 29 October 2026, with the following information to register for the site visit: Solicitation Number: W9127N27BA010, Project Title: THE DALLES DAM NAVIGATION LOCK TAINTER VALVE (TV) REPAIRS TV1, Name(s) of individual(s) attending site visit, Name of Company, Phone Number, Email Address, Are all individuals U.S. Citizens? Participants of the scheduled site visit must abide by the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, latest version) in accordance with Section 5, Personal Protective and Safety Equipment. It is the responsibility of the participants to wear personal protective and safety equipment as required by this regulation. Failure to comply could result in denial of access to site visit location. Site visit attendees must be U.S. citizens and possess a REAL ID to access the sites. Any subsequent visits will require prearrangement with the Contracting Division personnel listed above and may not be guaranteed/approved. Acceptable forms of proof of citizenship for anyone born outside the USA is: 1. US Birth Certificate: Must be certified and issued by either a US State or the US State Department. 2. US Passport Undamaged: Issued by the US Dept of State, without limitation, does not need to be current, is/was valid for 10 years for adults and 5 years for children under 16. 3. US Passport Card Undamaged: Issued by the US Dept of State, without limitation, does not need to be current. 4. US Certificate of Citizenship: Issued by US Citizenship and Immigration Service. 5. Consular Report of Birth Abroad: Issued by the US State Department. 6. US Naturalization Certificate: Issued by US Citizenship and Immigration Service. 7. Enhanced Drivers License: from Michigan, Minnesota, New York, Vermont, or Washington. Acceptable ID: 1. Real ID drivers license. 2. Enhanced drivers license. 3. Federal Identification Cards PIC/CAC/PIV/Etc. 4. Transportation Worker Identification Card (TWIC). 5. United States Passport or United States Passport Card. 6. Drivers license issued by the Department of State. Magnitude of Construction: The estimated cost of the project is between $1,000,000 to $5,000,000. Cybersecurity Maturity Model Certification (CMMC) level: The CMMC level anticipated for this requirement is CMMC Level 1 (Self). This CMMC level, or higher (see 32 CFR part 170), will be required prior to award and maintained for the duration of the contract for each contractor information system that will process, store, or transmit Federal contract information (FCI) or controlled unclassified information (CUI) during performance of the contract. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE RESPONSE DATE AND TIME. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SOLICITATION OR ANY FOLLOW-UP INFORMATION REQUESTS. | - | Solicitation | 11/30/2026 |
Additional Details
Solicitation Number
W9127N22B0007
Archive Date
Apr 30, 2023
Office Address
PORTLAND, OR, 97204-3495