GovChime
Notice ID: c1ca63bf74534fcfa47b34282320a586Solicitation

The Dalles Unwatering Pump Pipe Rehab

Archived on December 15, 2022. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 AM UTC−05:00
Posted
November 16, 2021
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Agency
Department of WarDepartment of the Army

Notice details

Office
W071 ENDIST PORTLAND
Place of performance
The Dalles, OR, 97058
Last updated
Dec 4, 2025

Identifiers

Solicitation number
W9127N22R0010
Notice ID
c1ca63bf74534fcfa47b34282320a586

Description

Navigation Lock Unwatering Pumps Rebuild Requirements Drawings: Attachment 1: Navlock Unwatering Assembly Prelim drawing is for general pump overview and if for information only. Attachment 2: As-built drawing, DDN-20928-69-15, is only for reference. All dimensions are to be pulled from the NL Unwatering Pump Assembly and NAVLOCK UNWATERING PUMP ASSEMBLY - TYPICAL FLANGE drawing. Attachment 3: NL Unwatering Pump Assembly hand sketch drawing provides assembly dimensions and layout. Attachment 4: NAVLOCK UNWATERING PUMP ASSEMBLY - TYPICAL FLANGE drawing provides the layout and dimensions for to match bolt patterns for pump and discharge casing flange. The Contractor shall field verify all measurements and layout prior to starting fabrication. All provided quantities below are per pump. There are two pumps. Contractor to provide material for two pump systems as described. 1. Pump shaft a. Refer to Attachment 3 NL Unwater Pump Assembly Drawing for dimensions. b. Refer to DDN-20928-69-15 for overall layout. c. Material: 416 SS and pump shaft quality. d. Three sections per pump @ 9 -11 . e. 2-7/16" x 9' 1-3/4" Headshaft: One section per pump @ 9 -1 . Contractor to provide shaft adjusting nut that matches thread pitch for the Jump Coupling on the 2 7/16 side of the shaft. Government will cut threads and keyway on motor adjustment end. f. Thread length is to accommodate 2-3/16" Standard Shaft Couplings. g. Acceptable runout: 2 Thou per foot 2. Casing a. 18" x 9' 11-3/4" Flanged Columns Coated OD & ID b. Refer to Attachment 4 NAVLOCK UNWATERING PUMP ASSEMBLY - TYPICAL FLANGE drawing for layout and dimensions for to match bolt patterns for pump and discharge casing flange. c. 3 sections per pump @ 9 -11 , d. Material: Steel meeting pump industry standards. e. Coating is the be epoxy to prevent erosion and corrosion. Coating to be applied inside and outside. 3. Shaft couplers a. Refer to Attachment 3 NL Unwater Pump Assembly Drawing for sketch of location on assembly. b. Three 2-3/16" Standard Shaft Couplings c. One 2-3/16" x 2-7/16" Jump Coupling (aka Reducer Coupler) d. Match shaft threads 4. Bearing Retainer (aka Spiders) with rubber bearing insert, Open Line Shaft a. Sandwiched between casing sections as shown in example Figure 1. b. Complete bearing assembly including rubber bearing and keepers. c. Material: Bearing Retainer is to be Bronze; the rubber bearing is to have properties like Nitrile Butadiene Rubber (NBR) Figure 1 Desired Retainer Bearing Configuration

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W9127N22R0010
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. SolicitationCurrentNov 16, 2021

    The Dalles Unwatering Pump Pipe Rehab

    Notice c1ca63bf74534fcfa47b34282320a586 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W9127N22R0010

Archive Date

Dec 15, 2022

Office Address

PORTLAND, OR, 97204-3495