MILLER-RICE ISLANDS PILE DIKE SYSTEM REPAIRS
Awarded on August 21, 2026. Full description on SAM.gov.
Overview
- Posted
- August 21, 2026
- Notice type
- Award Notice
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTHWESTERN.ENDIST PORTLAND.W071 ENDIST PORTLAND
- Place of performance
- Cathlamet, Washington
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
- Award date
- Aug 21, 2026
- Award amount (SAM.gov award notice)
- $18.5M
Identifiers
- Solicitation number
- W9127N26CA031
- Notice ID
- afb207839e944cc49cc2e079b0bd19bd
- Award number (PIID)
- W9127N26CA031
Description
This award announcement is for the construction/repair of the Miller-Rice Islands Pile Dike System located between River Mile 22 and River Mile 25 on the Columbia River in Wahkiakum County, Washington.
The project consists of enhancing and connecting the enrockments of PD 23.82 and PD 23.71 and repairing and enhancing PD 24.63. The enrockment for PD 23.71 and PD 23.81 will be raised uniformly and enhanced to connect the two pile dikes. The repair and enhancement of the centerline of PD 24.63 will be approximately 10 feet downstream (west) of the existing pile dike piles
centerline. This placement allows for enhanced enrockment construction without the need for removal of existing piles. The offset placement of the enhanced enrockment may also allow for phased placement over time as the existing pile dike continues to degrade. Furthermore, locating the enhanced enrockment slightly downstream eliminates the need for removal of large amounts of debris on the upstream side of the existing pile dike.
The enhanced enrockment crest will be raised from an existing elevation of approximately El. -15 feet NAVD88 to El.-5 feet NAVD88. For the northern (nearshore) portion of the dike, from Sta. 1+00 to Sta. 0+25 the enhanced enrockment crest will slope downward from El. -5 feet NAVD88 to El. -12 feet NAVD88, from Sta 0+25 to 0+04 the enhanced enrockment crest will have an El. of -12 feet NAVD88. The northern (nearshore) end of the enhanced enrockment will terminate in 14 foot wide by 4-foot-thick rock scour apron. For the southern (offshore) 480 feet of the dike (Sta. 8+00 to 12+80), the crest will slope downward from El. -5 feet NAVD88 to El. -16 feet NAVD88 at the offshore end where it will tie into the existing enrockment at a 2H:1V slope. The enhanced enrockment will have an 8-foot crest width and 1.5H:1V side slopes. The design includes construction of 8 new hazard marker piles to designate the locations of the submerged enrockments. The new hazard marker piles are driven mono pile structures. Hazard marker pile design is a steel pipe monopile. The hazard marker pile will have a 3-foot by 3-foot navigation hazard sign affixed to the top. The top of the pile is positioned at 20 feet NAVD88.
Award Overview
Award Number
W9127N26CA031
Award Amount (SAM.gov award notice)
$18.5M
Award Date
Aug 21, 2026
Awardee
Awardee UEI
LYYPM7XWLAA8
Awardee CAGE Code
3MLV2
Awardee Address
Astoria, OR 97103, UNITED STATES
Original Solicitation
Notice ID: afb207839e944cc49cc2e079b0bd19bd
Posted Date: Aug 21, 2026
Original Response Deadline: Not specified
Contract Details
Contract data not yet available
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (3)
- Download
Bid Abstract - W9127N26BA016_KO APPROVED 20260723.pdf
333 KBAdded in Solicitation version 6Posted - Download
W9127N26BA016 Miller-Rice Islands Pile Dike System Repairs_Specifications.pdf
12 MBAdded in Solicitation version 3Posted - Download
W9127N26BA016 Miller-Rice Islands Pile Dike System Repairs_Planset.pdf
6.1 MBAdded in Solicitation version 3Posted
Lifecycle
- 2Version 2SolicitationArchived
MILLER-RICE ISLANDS PILE DIKE SYSTEM REPAIRS
- 5Version 5Award NoticeArchivedCurrent
Type changed from Solicitation to Award Notice
MILLER-RICE ISLANDS PILE DIKE SYSTEM REPAIRS
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
CHJ 480V _ SQ1_SQ3_ DSQ1_DSQ2_Rep. Amend 0001 - 1. Update the solicitation number from W912DW26RA053 to W912DW27RA020 on Chief Joseph 480V SQ1 - SQ3, DSQ1 - DSQ2 Replacement Drawings and Chief Joseph 480V SQ1 - SQ3, DSQ1 - DSQ2 Replacement Specs. 2. Add Request for Visitation Authority (RVA). | - | Solicitation | 12/18/2026 |
NOTICE OF SOLICITATION NUMBER CHANGE The Bonneville Powerhouse II Unwatering Pump Replacement acquisition, previously announced under this presolicitation notice using number W9127N26BA018, is now identified as W9127N27BA012 due to the fiscal-year transition. All subsequent notices and solicitation documents for this acquisition will reference solicitation number W9127N27BA012. Here is a link to the presolicitation number using the new number (W9127N27BA012): https://sam.gov/workspace/contract/opp/dd44e02c5d0e43a4b10d9ea6146d4a73/view The U.S. Army Corps of Engineers (USACE) Portland District (NWP) has a requirement for Unwatering Pump Replacement at the Bonneville Lock and Dam Powerhouse II. Contractor access to the work site will be from Interstate 84 on the Oregon side of the Columbia River via Exit 40, approximately four miles west of Cascade Locks, Oregon. All work for this project is in Skamania County, Washington. Cybersecurity Maturity Model Certification (CMMC). This solicitation requires the contractor and or subcontractor(s) information system to process, store, or transmit Federal Contract Information (FCI), and requires the contractor and or subcontractor(s) to comply with CMMC requirements. The CMMC level required by this solicitation is: CMMC Level 1 (Self). This CMMC level, or higher, is a condition of award. Prior to award, the apparent successful bidder must have a current CMMC status at Level 1 (Self), or higher, posted in SPRS for each relevant CMMC UID in order to remain eligible for award; failure to meet this requirement will render the bidder ineligible for contract award. CMMC requirements apply to prime contractors and subcontractors throughout the supply chain at all tiers that will process, store, or transmit any FCI on contractor information systems in the performance of this contract or subcontract. Prime contractors shall comply and shall require subcontractors to comply with and to flow down CMMC requirements, such that compliance will be required throughout the supply chain at all tiers with the applicable CMMC level and assessment type for each subcontract as follows: If a subcontractor will not process, store, or transmit FCI in performance of the subcontract, then no CMMC level is required for that subcontractor. If a subcontractor will only process, store, or transmit FCI in performance of the subcontract, then a CMMC status of Level 1 (Self) is required for that subcontractor. Prime contractors are responsible for ensuring that all covered subcontractors obtain and maintain the appropriate CMMC level and assessment type for the information they will process, store, or transmit during performance. For this solicitation, contractors requesting access to documents containing FCI must have an active SAM registration and a current NIST SP 800 171 assessment with at least a Basic confidence level recorded in SPRS. Summary of Work: Work includes but is not limited to providing all labor, equipment, and materials required to procure, install, and test one vertical turbine unwatering pump assembly per the Contract specifications. The Government will remove the existing pump. Procure and install one 7,000 gpm vertical turbine unwatering pump. Procure and install all the discharge head piping necessary to connect with existing discharge piping to the North pump assembly. Procure and install one 460V, 3 phase motor as detailed in the specifications. Test all equipment prior to commissioning and turning over to the Government. The anticipated completion date for physical construction is 180 calendar days after receiving the Notice to Proceed. The solicitation will be issued as an Invitation for Bids (IFB). This acquisition will result in a single firm-fixed-price contract. The estimated magnitude of construction is between $500,000 and $1,000,000. This acquisition is set-aside 100% for small business concerns. The North American Industry Classification System (NAICS) code for this action is 237990; Other Heavy and Civil Engineering Construction with a small business size standard of $45M. Bid Submission Using the Procurement Integrated Enterprise Environment (PIEE) Only electronic bids will be accepted. Portable Document Format (PDF) is preferred. You must provide pricing, in whole dollar amounts only, for all line items using the Standard Form (SF) 1442 for your bid to be considered. The bidder shall submit its complete bid package electronically through the PIEE Solicitation Module at https://piee.eb.mil/ PIEE Registration and Roles Bidders shall register in PIEE at https://piee.eb.mil/ Within the PIEE Solicitation Module, two vendor roles are available: Proposal Manager and Proposal View Only. The Proposal Manager role is required to upload and submit a bid; the Proposal View Only role will not allow bid submission. The email address used for the PIEE account must match the email address associated with the bidders registration in SAM.gov For step by step instructions on how to submit a bid, refer to the Posting Offer demonstration at: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf Training materials and instructions for using the PIEE Solicitation Module are available under Web Based Training (WBT) at: https://pieetraining.eb.mil/wbt/ Additional PIEE training resources: Proposal Manager Registration Instructions: https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf Proposal Manager Reference Guide: https://pieetraining.eb.mil/wbt/sol/documents/Proposal_Manager.pdf Proposal Manager Submitting an Offer: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf This synopsis is not a request for quotes (RFQ), proposals (RFP), or an invitation for bids (IFB). This is a pre-solicitation notice indicating that a solicitation for a competitive acquisition for the award of one firm-fixed-price contract is intended to be issued via Contract Opportunities at SAM.gov. The tentative solicitation issuance date is September 2026. The solicitation will not be issued less than 15 days from the date of this notice. The specifications will be included with the solicitation once issued. This announcement is for information and planning purposes only and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. Bids will be due not less than 30 days from the date the solicitation is issued. The definitive bid due date and time will be stated in the solicitation and any associated amendments that may be issued. Contractors are responsible for checking this page for any update(s) to this notice. Pursuant to Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) 4.203-1 (b), firms must be System for Award Management (SAM) registered at the time their bid is submitted. Bids from firms that have not registered or completed their online representations and certifications may be rejected. The initial registration process in SAM may take several weeks. Registration instructions may be obtained, and online registration may be accomplished, at www.SAM.gov | - | Pre-Solicitation | Open |
THIS PROJECT WILL ADD NEW SECURITY BARRIERS (FENCE, GATE,) FOR ADDITIONAL PERSONNEL SAFETY AND PROJECTSECURITY.THE CONTRACTOR SELECTED TO PERFORM THIS WORK WILL BE REQUIRED TO PERFORM WORK TO INCLUDE:. CONCRETE SAW CUTTING FOR ELECTRICAL UNDERGROUND TRENCH.. SIDEWALK CONCRETE DEMOLITION AND NEW SIDEWALK CONCRETE. MISCELLANEOUS CONCRETE FOOTINGS. INSTALLATION OF MISC BOLLARDS. SELECT FENCE DEMOLITION. ASPHALT REPAIR- REMOVE EXISTING VEHICULAR SWING GATE AND INSTALL MOTOR-OPERATED CANTILEVERED GATE- INSTALL FENCE AND PEDESTRIAN GATE AROUND BASE OF EXISTING EXTERIOR STAIRCASE.- INSTALL, RIGID METALLIC CONDUIT AND UNDERGROUNDSCH40 PVC CONDUIT, AS SHOWN IN THE PLANS | - | Combined Synopsis | 06/09/2026 |
The Grays Harbor and Chehalis River Federal Navigation Channel is located in Grays Harbor County on the southwest coast of Washington State. The navigation channel traverses the harbor to provide safe navigation and wide turning areas for large ships while they traverse Grays Harbor from the Pacific Ocean to the Port of Grays Harbor and local facilities at the cities of Aberdeen, Hoquiam, and Cosmopolis. To maintain the navigability in the project, the recommended plan consists of maintenance dredging annually from the navigation channel over a fifteen-year period of 2018 through 2033. - Amend 0001- Update Bid Schedule Optional Item Number from 1001 to 0004 and from 1002 to 0005. - Amend 0002- Add RFO 52.222-90. | - | Solicitation | 05/18/2026 |
EVENT DETAILS: Date: 3 December 2026 Time: 0930-1430 PT Format: Presentation & Site walk Registration Due Date: 23 November 2026, 1200 PT; Please register by returning completed Request for Visit Authority (RVA) by email to: Sarah Malowicki, Project Manager, at sarah.m.malowicki@usace.army.mil, AND Londres Medranda, Contract Specialist, at londres.medranda@usace.army.mil. Confirmation email will be sent upon receipt of completed RVA. Who Should Attend: Interested vendors, including small businesses, large businesses, and other industry partners. Attendance is limited to 2 personnel per company. Attendance is limited to United States Citizens. Attendance at this event is not mandatory. Pre-registration is required. DESCRIPTION: In accordance with the Revolutionary Federal Acquisition Regulation Overhaul (RFO) 15.101(a) Early exchanges with industry, the United States Army Corps of Engineers (USACE), Seattle District (NWS) is hosting an Industry Day on 3 December 2026 at Chief Joseph Dam in Bridgeport, Washington. This Industry Day provides an opportunity for interested parties to inspect the existing 15.5KV Main Unit XJ Breaker disconnects first-hand. By hosting this first-hand inspection, the government aims to gather technical feedback and explore industry alternatives for modernizing this equipment. We are seeking input from qualified, experienced sources, capable of performing this modernization work. PROJECT BACKGROUND: At Chief Joseph Dam the current Unit 1-16 XJ Breaker disconnects are original BBC (Brown Boveri Corporation) equipment and rated 6000A according to the BBC shop drawings. The switch operators are pneumatically driven, and are actuated by operation of a complex key interlocking scheme with the circuit breaker. The load side and source side disconnects are mechanically linked and simultaneously operated by a single shared pneumatic actuating system. The current Units 17-27 breaker disconnects are original GE equipment. The load side and source side disconnects are mechanically linked and simultaneously controlled by mechanically operated hand crank. USACE is evaluating options to improve reliability, maintainability, remote-operating capability, and overall generating-unit availability. • Option 1: Refurbish and restore existing disconnect switches to an approved condition equivalent to original design intent, as technically feasible. Integrate motorized mechanisms on the switch arms to enable remote operation, and comprehensively overhaul and test the existing main unit breakers to ensure optimal system protection. • Option 2: Replace the disconnect switches with new electrically operated units and refurbish the existing breakers. • Option 3: Replace both the disconnect switches (with new electrically operated units) and the main unit circuit breakers. • Option 4: Replace the entire switchgear assembly with new enclosures, modern electrically operated disconnect switches, and new circuit breakers (includes associated controls, protection, buswork and new enclosure). Chief Joseph Dam has several critical limitations that affect this project, primarily related to space constraints. This Industry day will present the options under consideration, obtain industry feedback on technical feasibility and constructability, and identify potential risks, constraints and cost drivers. USACE is requesting feedback on the following questions and relevant, non-binding information: Does your company have the ability, capacity, interest and willingness to perform the proposed options? Does your company have experience with comparable medium-voltage/high-current generation-station disconnect and breaker modernization projects? We are not currently requiring quotes or bids, however rough estimates would be greatly appreciated. Recommended technical approaches or alternatives Major schedule outage, access, safety, supply-chain or constructability risks. Do you believe all aspects of this requirement could be successfully performed by the small business sector under NAICS 237990 (Size standard $45M)? (Yes/No). If No, what estimated percentage do you think can be subcontracted out to small business? Small Business (SB) ______% Small Disadvantaged Business (SDB) ________% Woman-Owned SB (WOSB) _______% Veteran Owned SB (VOSB) _______% Service Disabled VOSB (SDVOSB) _______% Historically Underutilized Business Zone (HUBZone) _______% Important Notice: Attendance and participation is not required for consideration on future contracts related to this work. The U.S. Government is not obligated to pay for any information, documentation, demonstrations, or data provided, nor will it reimburse any costs incurred by your organization in preparing responses, traveling to, or participating in this Industry Day and physical equipment inspection. All costs associated with attending this event and participating in this information exchange are solely at the responding party’s expense. Small Business Program Inquiries: Enshane Hill-Nomoto: Enshane.Nomoto@usace.army.mil https://www.nws.usace.army.mil/Business-With-Us/Small-Business/ Thank you for your interest in this USACE project. | - | Special Notice | 11/23/2026 |
Additional Details
Solicitation Number
W9127N26CA031
Archive Date
Sep 5, 2026
Office Address
PORTLAND, OR, 97204-3495