Intake Gate Machinery Rehabilitation, Norfork Lake, Dam, & Powerhouse

Archived on October 30, 2020. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM UTC−05:00
Posted
September 3, 2020
Notice type
Solicitation
NAICS
811310: Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
Agency
Department of WarDepartment of the Army

Notice details

Office
W076 ENDIST LITTLE ROCK
Place of performance
Norfork, AR, 72658
Last updated
Apr 29, 2026

Identifiers

Solicitation number
W9127S20R0004
Notice ID
31de825d42294e7e86142e81e130c2f3

Description

Intake Gate Machinery Rehabilitation, Norfork Lake, Dam, & Power Plant, White River Basin, Baxter County, Arkansas Project Number: 461488 Magnitude of Construction: Between $1,000,000.00 and $5,000,000.00 Set-Aside: Unrestricted NAICS: 811310 Bidder Inquiry: A Request for Information (RFI) Review has been set up at www.projnet.org for this solicitation. The Projnet Inquiry Key is UG5QTH-ZFFIMD. The review is open from July 27, 2020 until August 12, 2020. A site visit is scheduled for August 5, 2020 at 10:00 AM CDT. See clause FAR 52.236-27 Alt I for complete details.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W9127S20R0004
  1. Market Research
  2. Pre-Solicitation
  3. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    Market ResearchFeb 18, 2020

    Intake Gate Machinery Rehabilitation, Norfork Powerplant

    Notice e08b1dc0f6b245e1aa7c332c9395958a on SAM.gov

  2. Pre-SolicitationJun 12, 2020

    Intake Gate Machinery Rehabilitation, Norfork Powerplant

    Notice c97de159acc8462b9714e5d0b52aa079 on SAM.gov

  3. 5×
    SolicitationCurrentJul 27, 2020

    Intake Gate Machinery Rehabilitation, Norfork Lake, Dam, & Powerhouse

    Notice 31de825d42294e7e86142e81e130c2f3 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Amendment 0001 - The due date for receipt of quotes is extended to 17 July 2026 at 1400 Central Time. Additionally, answers to questions received are being posted. Contractor shall provide all labor, material, and equipment necessary to clean, disassemble/reassemble, and inspect all lifting machinery for the Barkley Lock Emergency Lift Gate, including but not limited to the limit switch assemblies, motors, enclosed gears, open gears, gear mounting assemblies, drums, sheaves, wire rope, brakes, shaft bearings, couplings, and control equipment. Provide the initial inspection reports with pictures of the equipment that show any deficiencies found during the inspection. Provide touch-up painting for all exterior surfaces of items in the scope of work after inspection except as otherwise noted. If a contract option is exercised, paint the respective components (except as otherwise noted) after the work in the contract option is completed. After completion, provide as-built reports that show as-built fits, backlashes, contact patterns and end floats. Initial inspection reports and as-built reports shall be required for all open gears, limit switch assemblies, and enclosed gears. Mark-up of the PDF for as-builts are acceptable. No CAD drawings shall be required for the as-builts. Provide new oil, grease, filters, fasteners, keys, and others as needed to get the Emergency Gate (E-Gate) machinery ready for operation.
59%
Combined Synopsis07/17/2026
Award Notice - Barkley Dam Spillway Gate Machinery Painting.
51%
AwardedOpen
AMENDMENT 0003 PROVIDES GOVERNMENT ANSWERS FOR ADDITIONAL INDUSTRY QUESTIONS. AMENDMENT 0003 AND Q AND A DOCUMENT UPLOADED. AMENDMENT W912P526BA003002 PROVIDES REVISED DOCUMENTS AS REFERENCED IN THE QUESTIONS FROM INDUSTRY AND ANSWERS FROM GOVERNMENT. AMENDMENT W912P526BA003001 EXTENDS BID DUE DATE TO 3 SEPTEMBER 2026 AT 1:00PM CENTRAL DAYLIGHT TIME. BID OPENING IS SCHEDULED ON 3 SEPTEMBER 2026 AT 1:30PM (SEE SECTION 00 21 13). THIS AMENDMENT PROVIDES THE SITE VISIT SIGN-IN SHEET, AND ANSWERS TO THE BIDDER INQUIRES RECEIVED FROM INDUSTRY. AMENDMENT 0002 WILL BE POSTED NEXT WEEK WITH REVISED DOCUMENTS REFERENCED IN AMENDMENT 0001. THIS SOLICITATION IS FOR A FIRM-FIXED PRICE CONSTRUCTION CONTRACT FOR BARKLEY SPILLWAY GATE MACHINERY PAINTING AT BARKLEY DAM. THIS IS A SDVOSB SET-ASIDE IN ACCORDANCE WITH RFO 19.106-2. THE DOCUMENTS DESCRIBING THIS REQUIREMENT ARE PROVIDED BY ATTACHMENT AND ARE LISTED IN RFO DFARS CLAUSE 252.236-7001 DFARS CD 2026-O00019, CONTAINED HEREIN. CONTRACTORS MUST REGISTER AND COMPLETE THE REPRESENTATION AND CERTIFICATION REQUIREMENTS IN THE SYSTEM FOR AWARD MANAGMENT SAM DATABASE AVAILABLE. PLEASE ENSURE YOUR ANNUAL SAM REGISTRATION IS CURRENT. OFFERORS MUST COMPLY WITH THE REQUIREMENTS OF RFO 52.204-7, AND RFO 52.232-33, AND ANY OTHER REPRESENTATION AND CERTIFICATION REQUIREMENTS IN THIS SOLICITATION THROUGH SAM.NOTE - SAM IS COMPLETELY FREE OF CHARE FOR BOTH REGISTRANTS AND USERS. THE GOVERNMENT WILL NOT REIMBURSE OFFERORS FOR ANY EFFORT EXPENDED IN RESPONDING TO THIS IFB. TECHNICAL INQUIRIES AND QUESTIONS RELATING TO THE PROPOSAL PROCEDURES OR BONDS ARE TO BE SUBMITTED VIA BIDDER INQUIRY IN PROJNET. PLEASE SEE SECTION 00 21 13, PROJNET INSTRUCTIONS OFFERORS QUESTIONS AND COMMENTS FOR FURTHERINSTRUCTIONS.
51%
Solicitation09/03/2026
*********** EFFECTIVE SEPTEMBER 23, 2026: The government has posted Amendment No. 0003 hereunder this Notice (please refer to the Attachments Section). ********************* *********** EFFECTIVE SEPTEMBER 14, 2026: The government has posted Amendment No. 0002 hereunder this Notice (please refer to the Attachments Section). ********************* *********** EFFECTIVE SEPTEMBER 11, 2026: The government has posted Amendment No. 0001 hereunder this Notice (please refer to the Attachments Section). *********************** This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. All responsible sources may submit a quotation, bid, or proposal, as appropriate, which will be considered by the agency.**********Solicitation number W912P626QA026 is issued as a request for quotation (RFQ) for hardware support for performing a comprehensive diagnostic of the Variable Frequency Drive (VFD) andexecuting the repair or replacement of the VFD unit to restore system functionality. Conductinga full operational load test of the electric hoist motor, the Contractor shall also perform finalsystem tuning, integration testing, and safety certification to return the elevator to full service.Contracted personnel must be trained, certified, and equipped for fall protection operations IAWU.S. Army Corps of Engineers EM 385-1-1 standards. IT IS STATE LAW THAT ELEVATOR REPAIR CONTRACTORS ARE LICENSED IN THE STATE OF INDIANA. **********This acquisition is not set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. The solicitation will be downloadable from the internet only, via DoD Procurement Integrated Enterprise Environment (PIEE) system. The project specification files are PDF files and can be viewed, navigated, or printed using Adobe Acrobat Reader. ********** Quotes MUST be Submit electronically via PIEE online submission. **********IMPORTANT POLICY: Contractors are REQUIRED to be registered in the System for Award Management (SAM) AT THE TIME ITS QUOTE IS SUBMITTED, and must comply with the annual representations and certifications requirements. Registration can be completed free of charge at www.sam.gov. Contractors must register with sam.gov, prior to registering with PIEE. Use the PIEE System Registration link:https://piee.eb.mil, and follow the instructions on their website. ***********Please include Solicitation Number W912P626QA026 in the email subject line for all correspondence. Request for Solicitation packages or responses to the solicitation made by telephone, fax, or e-mail will not be honored.
47%
Combined Synopsis09/28/2026
The U.S. Army Corps of Engineers, New England District is solicitating an Invitation for Bids (IFB) for Electrical Feeder Upgrades at the Black Rock Lake Dam in Thomaston, Connecticut. This will be a 100% Small Business Set-Aside IFB procurement. The NAICS code for the work described below is 238210 with a size standard of $19M. The project is planned to be issued in July 2026 and will be set aside for Small Businesses. The period of performance will be approximately 180 days. The estimated magnitude of this project is between $750,000 and $1,250,000.The work of this project involves electrical feeder upgrades at the Black Rock Lake Dam in Thomaston, Connecticut. Specific work tasks include, but are not limited to, replacing the existing overhead dam feeder (which runs underneath a high voltage line) from the project office to a designated manhole with a buried conduit duct bank.The existing gate tower feeder is in an existing buried duct bank which runs up the dam face and in exposed conduit beneath the gate tower bridge will be removed and replaced with new. The fused disconnect at the existing overhead line end will be removed. The existing manual transfer switches in the gate tower and project office will be removed. The existing 480V Panel-A, transformer, and 120/208 Panel-B in the gate tower will be removed and replaced with new. The existing service entrance circuit breaker and its enclosure will remain and be reused. Install new propane genset in the project office parking lot. Install a new propane tank with an underground propane line connected to the genset. The new genset will be sized to power both the project office and the gate tower on loss of utility. The propane tank will be sized to provide 5 days of run time before needing to be refilled. Install a new properly sized automatic transfer switch to feed existing panel MDP-1 from either the existing utility feeder or the new propane genset.
46%
Solicitation09/10/2026

Additional Details

Solicitation Number

W9127S20R0004