Notice ID: 82286d29ada342bb9e9ff6f5c1ac67e9Combined Synopsis/Solicitation
Beaver Power House Elevator Repair
Archived on March 19, 2022. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−06:00
- Posted
- February 7, 2022
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238290: Other Building Equipment Contractors
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W076 ENDIST LITTLE ROCK
- Place of performance
- Eureka Springs, AR, 72631
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- W9127S22Q0013
- Notice ID
- 82286d29ada342bb9e9ff6f5c1ac67e9
Description
See combined synopsis and solicitation.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W9127S22Q0013- Combined Synopsis
- 2×Combined SynopsisCurrentFeb 4, 2022
Beaver Power House Elevator Repair
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This is a non-personal services contract to provide all management, tools, supplies, equipment, parts and labor necessary to maintain, repair, and inspect the real property vertical transportation equipment (VTE) at Little Rock AFB, AR 72099 in a manner that will ensure continuous and safe operation Site Visit: An organized site visit is scheduled for 26 October 2026 at 10:00 AM CST. This will be the only site visit conducted. Participants are to meet at the front gate visitor center of Little Rock AFB @ 0930 to allow time to obtain escort passes and accountability. Vendors MUST RSVP to the POCs listed no later than 22 October 2026 at 4:00 PM CST on who will be attending the site visits. Little Rock AFB is not an open base and you must have a valid REAL ID to access the base. Questions: All questions are due to the identified POC's by 27 October 2026 at 10:00 AM CST. | - | Combined Synopsis | 11/18/2026 |
The U.S. Army Corps of Engineers - New England District is issuing a Solicitation Notice for Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT. THE WORK CONSISTS OF: The Contractor shall furnish all necessary materials, equipment, and labor required to construct and commission a new power system for the Dike B Operator unit. The scope of work involves comprehensive site preparation to support the construction of a reinforced concrete generator pad and the installation of secure perimeter fencing. The Contractor is responsible for the procurement and installation of a standalone, propane-powered generator and a corresponding propane fuel storage tanks. Following the physical installation, the Contractor shall execute all final electrical connections and integration into the existing sluice gate operator unit and control panel. All work shall comply with all applicable federal laws and codes, and shall be completed in accordance with the Statement of Work. This procurement is set-aside for small business vendors. The applicable NAICS code is 238290 with a Small Business Size Standard of $22 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE. | - | Solicitation | 11/18/2026 |
US Goverment is posting for Pre-Solicitaion for Exterior Cipher Locks & Exit Hardware Retrofit, Schofield Barracks, HI. This is Pre-Solicitation notice only. Please don't send us quote for this time. Please see attached for more detail with SALIENT CHARACTERISTICS. | - | Pre-Solicitation | 11/20/2026 |
This acquisition is for a a non-personal services contract to provide facility maintenance services and certain related facility management services at Fort Hood to include operation, preventative maintenance (PM) and corrective maintenance (CM) service (M and S) for approximately 136 automatic doors, 3,375 overhead doors (some hangers), and commercial doors for preventative and corrective (on demand) maintenance at the Fort Hood Army Installation, Fort Hood, Texas. This requirement also includes certain facility management and support services, as defined in this PWS, at US Army Garrison Fort Hood. The Contractor shall provide required PM and (CM) services in compliance with all code; criteria; regulations; and Federal, State, and local laws. All work shall be performed at Fort Hood, Texas, which consists of the Main Cantonment, West Fort Hood, and all areas under the control of Fort Hoods Installation or Installation considered Real Property. AMENDMENT 1: The purpose of amendment 1 is to incorporate site visit information detail. Location: FT Hood, TX. Date: 6 August 2026 Time: 1:30 PM CST. Attachments enclosed. AMENDMENT 2: Extend proposal due date to 14 August 2026, 1:00 PM CST (Posted to GPE/Sam.gov on 7 Aug 2026). AMENDMENT 3: The purpose of amendment 3 is to incorporate revised documents. Please see the updated Solicitation Amendment 3 for details. AMENDMENT 4: The purpose of amendment 4 is to communicate revisions to the evaluation factors detailed in RFO 52.212-2, Evaluation-Commercial Products and Commercial Services. (Deviation 2026-O0038). Please see updated solicitation attachment: Solicitation Amendment 4_W912DY26RA0760001_12 Aug. | - | Awarded | Open |
CSS Project #99178 - Install Facility Lightning Protection System in Morgantown, WV (WV029) | - | Solicitation | 09/23/2026 |
Additional Details
Solicitation Number
W9127S22Q0013
Archive Date
Mar 19, 2022
Office Address
LITTLE ROCK, AR, 72201-3225