GovChime
Notice ID: 84598b6209585f5826407eec6611b2a9Award NoticeAwarded

Y--Design-Build B-52 Two-Bay Phase Maintenance Dock, QJVF092012, Minot AFB, North Dakota

Awarded on April 19, 2012. Full description on SAM.gov.

Awarded tounder W9128F-12-C-0013 (source: SAM.gov award notice)• $33.9M

Overview

Posted
April 19, 2012
Notice type
Award Notice
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of War

Notice details

Place of performance
Minot Air Force Base U.S. Army Corps of Engineers - Omaha District Minot AFB ND 58704 US
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Oct 6, 2025
Award date
Apr 19, 2012
Award amount (SAM.gov award notice)
$33.9M

Identifiers

Solicitation number
W9128F11R0033
Notice ID
84598b6209585f5826407eec6611b2a9
Award number (PIID)
W9128F-12-C-0013

Description

A Two-bay phase maintenance dock that can fully enclose two B-52s is required to support the missions of two bomb squadrons. For increased mission support, there will be storage for tools in a tool crib, as well as storage for bench stock. Hoists are required over nose and wing areas for routine maintenance requirements. To improve life safety, fall restraint systems are required in the dock areas to prevent maintenance crew injuries. As hazardous materials are present, a waste containment area separate from the bay area is required to store hazardous materials, including an oil/water separator. In addition to the dock space, office space for supervisory personnel, a computer room for maintenance personnel, and locker rooms will be required to support the 24 hours per day, 7 days per week operations. The total area of the facility will be about 87,000 square feet and will include sustainable design features including a geothermal heating and ventilation system. Additionally, to meet the user's requirements, a new parking lot accommodating 100 privately-owned vehicles (POVs) will be constructed to the southeast of the facility. This project will be designed to be certified with a LEED Silver rating and comply with antiterrorism/force protection requirements of DoD Uniform Facilities Criteria. CLIN 0001 DESIGN $2,804,681.00 CLIN 0002 CONSTRUCT $29,318,576.00

Full description on SAM.gov

Award Overview

Award Number

W9128F-12-C-0013

Award Amount (SAM.gov award notice)

$33.9M

Award Date

Apr 19, 2012

Awardee

Awardee UEI

PAUZPNP4NP51

Original Solicitation

Notice ID: 84598b6209585f5826407eec6611b2a9

Posted Date: Apr 19, 2012

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Denise M. Cramer, 402-995-2088 USACE District, Omaha

Documents

No documents available.

Lifecycle

Solicitation:W9128F11R0033
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 10×
    Pre-SolicitationSep 12, 2011

    Y--Design Build B-52 Two-Bay Phase Maintenance Dock, QJVF092012, Minot AFB, North Dakota

    Notice 7c7beb828d406a856c493880486d10ee on SAM.gov

  2. SolicitationFeb 24, 2012

    Y--Design Build B-52 Two-Bay Phase Maintenance Dock, QJVF092012, Minot AFB, North Dakota

    Notice fc57bac2a6a5202c8de6689bce6001a3 on SAM.gov

  3. AwardedCurrentApr 19, 2012

    Y--Design-Build B-52 Two-Bay Phase Maintenance Dock, QJVF092012, Minot AFB, North Dakota

    Notice 84598b6209585f5826407eec6611b2a9 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W9128F11R0033

Archive Date

May 19, 2012