Notice ID: a9cc66a42b3e574300eccfead00bae01Solicitation

56--Bear Creek Dam Chain Link Fence Installation

Archived on August 13, 2012. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
7:00 AM UTC+02:00
Posted
July 20, 2012
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
238990: All Other Specialty Trade Contractors
Agency
Department of WarDepartment of the Army

Notice details

Office
W071 ENDIST OMAHA
Place of performance
USACE District, Omaha 1616 Capital Ave, Omaha NE 68102-4901 US
PSC
56: CONSTRUCTION AND BUILDING MATERIAL
Last updated
Dec 5, 2025

Identifiers

Solicitation number
W9128F12T0135
Notice ID
a9cc66a42b3e574300eccfead00bae01

Description

General Requirements 1. SCOPE: Furnish all labor, supplies, permits and material to remove the existing barbed wire fence and properly install a new chain link fence as described in the specifications and shown on the attached sheets. 2. Duration: All work shall be completed within 60 calendar days of receipt of the Notice to Proceed. 3. Safety Manual: The U.S. Army Corps of Engineers safety manual (EM 385-1-1) was revised as of September 15, 2008 and must be followed at all times. The current EM 385-1-1 can be found on the internet at: http://publications.usace.army.mil/publications/eng-manuals/EM_385-1-1_languages/EM_385-1-1_English_2008/toc.html . 4. Site Specific Work Plan: A site specific work plan shall include a description of the work to be performed, the size of the crew, the equipment which will be used on site, an Accident Prevention Plan as shown in Appendix A of the EM 385-1-1, an Activity Hazard Analysis as shown on pages 9 - 11 of the EM 385-1-1 must be submitted by the contractor and approved by the USACE before work begins. 5. Personal Protective Equipment: A minimum of short-sleeve shirt, long pants, leather work boots w/safety toe, and hard hat shall be warn at all times as per EM 385-1-1, Appendix A, pages A-9 and A-10, Paragraphs 11.k.(1)-(8). Other Personal Protective Equipment, such as eye protection, hearing protection, gloves, shall be properly used as needed and as identified in the site specific work plan. 6. Site Visit: Site visit will be on 16 July 2012 at 1:00 pm. Meet at the first parking lot of the Fox Hollow Golf Course. The site visit is highly recommended, but not mandatory. Contact Carl Voss at 303-507-7443 to confirm attendance. 7. Warranty: All work and materials furnished under this contract shall be guaranteed for a minimum of one (1) year from the date of acceptance thereof, either for beneficial use or final acceptance, whichever is earlier, against defective materials, design, and workmanship. Upon receipt of notice from the Government of failure of any of the guaranteed equipment during the guarantee period, new replacement parts shall be furnished and installed promptly by the Contractor at no additional cost to the Government. The Contractor shall also obtain and deliver to the Contracting Officer any warranties of work and materials which the subcontractors, manufacturers, or suppliers would give normal commercial practice. 8. Protection of Existing Facility and Works: The Contractor shall be responsible for the protection of the work area from damage and upon completion of the work shall leave existing works in a condition equal to that which existed when work started. The Contractor shall be responsible for identifying the location of underground utilities within the work area before digging. 9. Clean up: Daily clean up of all debris and waste material is required. 10. First Aid and Medical: First aid kits shall be made available on the job site by the contractor. All emergency numbers (doctors, hospital, ambulance, fire department) shall be readily available. 11. Sanitation Facilities: Toilet facilities and drinking water are not available on site. 12. Accident Reporting: All accidents (employee injuries, vehicle, building, or equipment property damage) regardless of their severity shall be reported to the on site government representative. Chain Link Fence Specifications 13. Chain Link Fence: Install approximately 300 feet of new 2x9 gauge x 72" chain link fabric with a 1-5/8" outside diameter top rail. New posts shall be 1-7/8", set at 10 feet on center. Terminal posts shall be 2-7/8". All posts shall be set in concrete. All hardware shall be of new material. A list of materials to be used for the fence shall be submitted to the U.S. Army Corps of Engineers to verify the contract requirements are met. 14. Removal of Existing Fence: Remove existing barbed wire fence and properly dispose of the fence off site. 15. Submittals: The following items shall be submitted using ENG Form 4025. An electronic copy can be found at: http://publications.usace.army.mil/publications/forms/ENG_FORM_4025_Mar_1995.pdf The 2nd page of the form has the instructions for the form. The submittals shall be approved by the U.S. Army Corps of Engineers before work on site can begin. 1. Site Specific Work Plan (see paragraph 4) 2. Bill of Materials (see paragraph 13)

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

sara edwards, 4029952484 USACE District, Omaha

Documents

No documents available.

Lifecycle

Solicitation:W9128F12T0135
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    Pre-SolicitationJun 27, 2012

    56--Bear Creek Dam Chain Link Fence Installation

    Notice 58e026b21666512c191fa0d08c535bc9 on SAM.gov

  2. SolicitationCurrentJul 20, 2012

    56--Bear Creek Dam Chain Link Fence Installation

    Notice a9cc66a42b3e574300eccfead00bae01 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W9128F12T0135

Archive Date

Aug 13, 2012