36--Repair, Clean and Regrout Joints at Papio Site 11 & 20

Archived on September 10, 2012. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
7:00 AM UTC+02:00
Posted
September 4, 2012
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
238110: Poured Concrete Foundation and Structure Contractors
Agency
Department of WarDepartment of the Army

Notice details

Office
W071 ENDIST OMAHA
Place of performance
USACE District, Omaha 1616 Capital Ave, Omaha NE 68102-4901 US
PSC
36: SPECIAL INDUSTRY MACHINERY
Last updated
Dec 5, 2025

Identifiers

Solicitation number
W9128F12T0152
Notice ID
d3d49f2e5945695282b8c177dae98c98

Description

PAPILLION CREEK CONDUIT REHABILITATION SCOPE of WORK Part 1 Scope of Work: The contractor shall furnish all labor, tools, materials, equipment and supervision necessary to Clean and regrout the joints on the inside of the concrete outlet pipes and apply a cement based sealant to the bottom half of the interior of the pipe as outlined in the following specifications at 2 Papillion Creek Dams. The work is to be performed at the Corps of Engineers, Papillion Creek Dams 11 (Cunningham) and 20 (Wehrspann) Omaha, Nebraska 68112. All contracted tasks must be completed during normal business hours, 0700 hours to 1600 hours, Monday through Friday unless otherwise specified or authorized in advance by the Contracting Officer's Representative (COR). Clean and regrout the joints on the inside of the concrete outlet pipes at the Papillion Creek Dams 11 (Cunningham) and 20 (Wehrspann) in Omaha Nebraska. The grout used for the regrouting of the joints shall be a nonshrink grout specifically formulated for wet conditions. After the joints are cleaned and regrouted the area around the joints shall then be coated with 2 coats of a cement based coating that acts as a sealant/waterproof coating. (Thoroseal waterproof cement-based Coating or approved equivalent) The interior of the pipe shall be coated to a height of the diameter up the walls for the full length of the pipe. The pipe shall be coated with 2 coats of a cement based coating that acts as a sealant/waterproof coating. (Thoroseal waterproof cement-based Coating or approved equivalent). The existing painted on numbering system at each joint shall be left visible and not covered over. All water leaks and joints must be cleaned and regrouted before applying cement coating to the walls. The joint on the outer ring on the downstream end shall also be cleaned, grouted and coated Physical information of the sites. 1. Papillion Creek Damsite 11 (Cunningham).- The conduit is Reinforced Concrete Pipe (RCP) 54 inches in diameter and 680 ft. long. . 2. Papillion Creek Damsite 20 (Wehrspann) -The conduit is RCP 48 inches in diameter and 656 ft. long. Application of the Grout and Sealant: Apply cement based sealant/coating material and grout as per the manufacturer's recommendations. The coating will be applied with methods such as a stiff fiber brush, broom or by texture spray equipment. Spray applications of the first coat requires back brushing or brooming to properly fill voids and achieve uniformity. See manufacturer's recommendations for proper dampness of the surfaces. It is essential to work the first coat thoroughly into the substrate to completely fill and cover all voids, holes, and nonmoving cracks. Finish with a horizontal stroke for an even coat. Allow to cure according to the manufacturer's recommendations prior to applying the second coat and finish with a vertical stroke. Surface Preparation: 1. Surface preparation is extremely important for proper adhesion. Substrates must be sound and free of dust, dirt, paints, oils, grease curing compounds, or any other contaminants. If efflorescence is present, mechanically remove it from it before proceeding. 2. Patch all holes and cracks before installation of the sealant material. Location: The locations of these sites are in Omaha, Nebraska. Papillion Creek Damsite 11 (Cunningham) Wenninghoff Rd and Cunningham Lake Rd. Papillion Creek Damsite 20 (Wehrspann) 154th Ave and Giles Rd. 1.2 MEETING WITH THE CONTRACTOR OFFICER'S REPRESENTATIVE (COR) The COR for this contract is TBD, and will be determined before the contract is awarded. The contractor shall meet with the COR prior to commencement of work to discuss and mutually agree on the performance requirements of the contract. At this meeting, the Contractor shall submit a work plan to include equipment, personnel, and safety requirements. The plan may be revised as needed for efficient performance of the work required. The Contractor shall provide the name, address, and phone number of his or her staff member who will superintend the work in the contractor's absence. 1.3 SUPERINTENDENCE BY CONTRACTOR The Contractor shall give his or her personal supervision to the work or have a competent foreman or superintendent, satisfactory to the COR, available at all times with authority to act for him or her. a. The contractor shall tour the project grounds and work site with the COR prior to commencement of the work to define specific work areas and performance requirements. b. All contractor personnel shall be attired in steel toed shoes, shirts, hard hats, and trousers, while in the performance of this contract. Tank tops, cut-off jeans, and similar attire are not considered acceptable. c. All communications, written and oral, by the contractor with the Federal Government shall be routed through the COR. The contractor must notify the Contracting Officer (COR) prior to starting work on each Lake. 1.4 SUBMITTALS Government approval is required for submittals of information on the products to used for Grout and sealant. 1.5 INSPECTION OF WORK The contractor must notify the Contracting Officer (COR) prior to starting work on each Lake. Work will be inspected regularly as the work progresses by the COR's authorized representative. If any of the services do not conform with contract requirements the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. Acceptance of Work: Acceptance of work will be accomplished upon satisfactory performance of scheduled work and satisfactory correction of any and all deficiencies. 1.6 PERIOD OF CONTRACT: Contract performance shall be completed by October 31, 2012 1.7 ACCIDENT PREVENTION: a. Contractor will comply with all pertinent provisions of Corps of Engineers manual, EM-385-1-1 dated 15 September. 2008, entitled A Safety and Health Requirements Manual, as amended, available from the COE. b. The areas within the pipe shall be considered a Confined Space and testing and monitoring of these spaces shall be conducted by the contractor prior to anyone entering the spaces and throughout the contract. 1.8 SITE VISIT: Contractors are urged to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance to the extent the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Site visits should be coordinated with the Corps of Engineers at 9901 Pershing Dr., Omaha, NE. 68112, Steve Dye (402) 996-3749 or Bob Willcuts (402) 996-3757

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

sara edwards, 4029952484 USACE District, Omaha

Documents

No documents available.

Lifecycle

Solicitation:W9128F12T0152
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    Pre-SolicitationAug 22, 2012

    36--Repair, Clean and Regrout Joints at Papio Site 11 & 20

    Notice 26646e345c4de1852aa33e951bec4a45 on SAM.gov

  2. SolicitationCurrentSep 4, 2012

    36--Repair, Clean and Regrout Joints at Papio Site 11 & 20

    Notice d3d49f2e5945695282b8c177dae98c98 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This is a Pre-Solicitation Notice Only. Reference number: W9128F26RA069 On or about 3 September 2026, the Government intends to issue a firm-fixed-price design-build(DB)/design-bid-build (DBB) Small Business (SB) set-aside, Indefinite Delivery, Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) with a shared capacity of $99M and a targeted pool of five (5) contractors for Facilities Sustainment, Restoration and Modernization (FSRM) Roofing services. No response to this notice is required. The contracts will be awarded for a total of five (5) years; one three (3) year base period and one two (2) year option period. The NAICS code for this contract will be 238610 ? Roofing Contractors. The current requirement is for one MATOC for roofing construction services to primarily support the U.S. Army Corps of Engineers (USACE) Omaha District, in Colorado and Wyoming. Requirements for this SB Roofing MATOC include, but are not limited to, the repair or construction of various types of roofing systems, single ply membrane systems ((e.g. ethylene-propylene-dienemonomer (EPDM) rubber, (including liquid EPDM, EPDM coatings and EPDM rubber coatings, polyvinyl-chloride (PVC)), standing seam metal (structural, architectural, steel, aluminum, and copper), tile (slate, clay, concrete), sprayed polyurethane foam (SPF), protected membrane, heat-reflective and energy efficient roofing systems, and all devices, equipment and components associated with constructing and installing these systems (e.g. vapor retarder membranes, insulation, air barrier membranes, gutters, downspouts, flashings, fascias and soffits). A typical task order may also include incidental damage repairs associated with roof leaks, such as ceiling repair, painting, and carpet cleaning. Task orders may involve incidental lead-based paint or asbestos abatement. Roofing systems will be designed and constructed to withstand Colorado and Wyoming hazards such as snow load, wind forces, and lightning. It is not anticipated that these roofing projects will involve LEED certification, but some sustainability requirements may apply. The majority of roofing projects are anticipated to be of the renovation type on facilities that will be occupied for the duration of work. Please be advised that an online registration requirement in System for Award Management (SAM) database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be up-dated annually at a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via https://SAM.gov. Registration is required to access solicitation documents. The website https://SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendments. Summary of access requirements to solicitation is as follows. Find solicitation announcements in https://SAM.gov. All amendments will be posted in https://SAM.gov. It shall be the contractor responsibility to check the website for any amendments. All responsible sources may submit a proposal, as appropriate, which will be considered by the agency. The Contracting point of contacts for this project are Euemduan Osmera at euemduan.c.osmera@usace.army.mil and Ginger Gruber at ginger.l.gruber@usace.army.mil. Interested parties are reminded that they are responsible for checking on new information posted to https://SAM.gov
-Pre-SolicitationOpen
***A pre-construction site visit is scheduled at 10:00 AM Central Time, 10 November 2026 at the Rock Island Arsenal – Joint Manufacturing and Technology Center (RIA-JMTC). Attendees will park in the South side of the JMTC building complex in lot B212 then meet Government representatives at the turnstile. All attendees will be required to wear steel-toed safety shoes and safety glasses. Reservations for this site visit are mandatory for all attendees at least one business day prior to the site visit. If you currently have badge access, you still must make a reservation for the site visit in order for the Government to control the number of attendees at any given time. You will not be allowed to attend without a reservation regardless of installation access. Vendors who do not have an access badge to RIA must request access via following: The Visitor Access Form, instructions, and “How Do I Get on Post?” flowchart can be found at https://home.army.mil/ria/about/visitor-information. Click on Pass Request Information (middle right), to Visitor Access Form and follow all instructions contained therein. POC for this action is Contract Specialist, Leigh Weeks, leigh.a.weeks2.civ@army.mil. The solicitation for this requirement will be posted on 04 November 2026. This pre-solicitation synopsis is to notify the public that a solicitation will be forthcoming for Concrete Pads in building 220 and 299. This solicitation will result in a Firm Fixed Price contract at the Rock Island Arsenal, Joint Manufacturing and Technology Center (RIA-JMTC). All details will be in the solicitation itself. Estimated issue date for the solicitation is on or around 04 November 2026. This solicitation will be issued electronically in accordance with FAR 4.502 and 5.102, therefore, hard copies will not be provided, although may be downloaded on or after the issue date by accessing SAM.gov. CAUTION: This solicitation will be issued electronically as will any amendments thereto. Because of this, the Government is under no obligation and is in fact unable to maintain an interested party list, therefore, it is recommended that any interested parties periodically access the above internet address in order to obtain amendments which may be issued. Failure to obtain any said amendments and respond to them prior to the date and time set may render your quote nonresponsive and result in the rejection of the same. All responsible sources may submit a quote which will be considered by the Government. **Please note, this is a notice that a solicitation is anticipated to be forth coming and will be posted on or around 04 November 2026 that will have all the necessary specifications.
-Solicitation11/20/2026
The U.S. Army Corps of Engineers, Wilmington District is requesting all labor, materials, and equipment necessary to install a 24ft-10in x 34ft-4in concrete pad with column foundations for a prefabricated shelter at the B. Everett Jordan Dam Tailrace Park. The Contractor shall provide all labor, quality control, equipment, fuel, supplies, and transportation necessary for the performance of the concrete pad installation in strict accordance with the Statement of Work. The resulting award issued from this request will result in one award.
-Solicitation11/10/2026
Requesting a company to fill craters with concrete.Reason for Amendment is to add Secondary Contacts and select Total Small Business Set-Aside
-Combined Synopsis05/20/2026
Notice ID: W911S226U2273Primary Solicitation Manager: Nfamory ToupouSubject: Description: 593D CSC needs 57 cubic yards of concrete poured over 2 days. The concrete must have a 5 inch slump and have a 4000 psi capability. The vendor does not need to provide labor. Soldiers will provide the labor. The vendor only needs to provide the concrete and a mixer to deliver/pour it. The concrete shall meet the following specifications. Concrete will be at 3,500 psi when fully cured. The slump of the concrete will be no more than 3 inch. Specified compressive strength FC is MPA 3,000 psi at 28 days. Air content must be between 4.5 and 7.5 percent-Maximum water-cementitious material ratio is 0.50 surfaces permanently exposed to view shall be so that the final color when cured is the same as adjacent concrete.
-Combined Synopsis12/12/2025

Additional Details

Solicitation Number

W9128F12T0152

Archive Date

Sep 10, 2012