Notice ID: a9bdc16a80564b38b6956d28ce65465bSolicitation
Fighter Alert Shelter, Truax Field, Madison, WI
Archived on July 27, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−05:00
- Posted
- July 20, 2021
- Notice type
- Solicitation
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W071 ENDIST OMAHA
- Place of performance
- Madison, WI
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W9128F20R0068
- Notice ID
- a9bdc16a80564b38b6956d28ce65465b
Description
*Update posted on 20 July 2021 is the award notice as SAM.gov is inoperable at the moment to post the actual award notice. *Update posted on 9 July 2021 is to issue Amendment 0008 due to Wage Rate revisions. *Update posted on 23 June 2021 is to issue Amendment 0007 due to Wage Rate revisions. *Update posted on 09 March 2021 is to issue Amendment 0005. Amendment 0005 is the last amendment that addresses the final bidder inquiries. Proposal due date and time remain the same. *Update posted on 03 March 2021 is to issue Amendment 0004. *Update posted on 09 February 2021 is to issue Amendment 0003 to include the 100% design and request Volume II proposals. Reference attached solicitation documents. This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION. This project will provide a new 28,000 SF Fighter Alert Shelter for four universal fighter aircraft to accommodate the mission of the facility. Special construction requirements include: the shelter houses four aircraft with automatic opening front and rear aircraft doors; heating, fire detection and ultra-high pressure fire suppression system/closed head wet-pipe sprinkler fire suppression systems. Provide support for Intrusion Detection System (IDS) and installation of a backup emergency generator. The facility is designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The facility shall be compatible with applicable DoD, Air Force, and base design standards. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria. This is a Bifurcated solicitation process following FAR Part 15, Contracting by Negotiation. This solicitation is issued with 95% design specifications at which time only Volume I Technical proposals are requested. Reference Division 00, Section 00 21 00 for more information on the bifurcated solictation process.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W9128F20R0068- Market Research
- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Market ResearchMar 24, 2020
Fighter Alert Shelter, Truax Field, Madison, WI
- Pre-SolicitationAug 10, 2020
Fighter Alert Shelter, Truax Field, Madison, WI
- 11×SolicitationCurrentNov 4, 2020
Fighter Alert Shelter, Truax Field, Madison, WI
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Amendment 9: The purpose of this amendment is as follows: 1. Revised pricing is due by 2:00 PM CT on 05/27/26 - only for those offerors who submitted a proposal in compliance with the original deadline of 04/20/26. Original proposals were due by 2:00 PM CT on 04/20/26. All other terms and conditions remain the same. | 78% | Solicitation | 05/27/2026 |
Updated 30 Dec 2025: Please reference the updated document attached. | 78% | Pre-Solicitation | 01/30/2026 |
This solicitation pertains to a Full and Open Firm Fixed-Price Contract for design-bid-build construction services in support of the U.S. Army Corps of Engineers (USACE) Southwestern Middle East District (SWM) Apache Alert Mission Complex for the Kuwait Air Force (KAF) at Ali Al Salem Airbase, Kuwait. | 75% | Solicitation | 01/08/2027 |
Pre-Solicitation Notice for Apache Alert Mission Complex Anticipated Solicitation Issue Date: November 2026 Anticipated Solicitation Response Date: December 2026 Set Aside: As the work will be performed outside of the continental United States, no set asides to small business or socioeconomic preference for this solicitation. NAICS: 236220 -- Commercial and Industrial Building Construction, and the Small Business Size Standard is $45,000,000. Contracting Office Address: US Army Corps of Engineers – Middle East District, 201 Prince Frederick Drive, Winchester, VA, 22602 SYNOPSIS: SWM is anticipating a Design-Bid-Build (DBB) award for the Construction of facilities to support and enhance the Apache Alert Mission at Ali Al Salem Air Base in the country of Kuwait. PROJECT SCOPE: The facilities to be constructed include: Four Alert Shelters with Aprons Logistics Readiness Center Maintenance Supply Warehouse with Exterior Storage Shade Guard House Pilot Readiness Facility Petroleum Oil Lubricant (POL) Shed Fire Water Pump House with Water Tank Alert Magazine (option) Forward Arming and Refueling Point (FARP) Parking Sunshades Bunkers Three Electrical Substations All site utilities, incl. Stormwater, Domestic Water, Fire Water, Sanitary Sewer with Lift Station and Leach Field, and Site Electrical and Communications Site Development, incl. Taxiway, Vehicular Pavement, and Parking Lot Helipad and Taxiway Rehabilitation (option) Hardened Aircraft Shelter (HAS) Demolition (option) FARP Expansion (option) Paved Access to Practice Runway (option) The project includes all utilities, site improvements, new concrete aprons, airfield and vehicular pavements, detection and protection features, security enhancements, and other supporting work necessary to construct complete and useable facilities. The project is phased to maintain uninterrupted airfield and squadron alert and training operations during construction. The Period of Performance is anticipated to be 1,355 calendar days from issuance of Notice to Proceed. PROPOSAL PROCEDURES: The Request for Proposal (RFP) will be issued on SAM.GOV. It is anticipated that the Best Value Trade-Off (BVTO) contracting method will be used to evaluate proposals. Evaluation criteria will be stated in the RFP. RESPONSE PERIOD: This is a pre-solicitation notice and is not a request for proposal (RFP) nor does it restrict the Government as to the ultimate acquisition approach. A response to this notice is not required. The Government will not reimburse respondents for any costs incurred in preparation of a response to this notice. Questions can be sent to Maria Martin, e-mail: Maria.L.Martin@usace.army.mil and Tracy Gusukuma, e-mail: tracy.m.gusukuma@usace.army.mil. | 75% | Pre-Solicitation | Open |
Amendment 5: The purpose of this amendment is as follows: 1. Correction to description of CLIN 0016 (see 00 10 00). 2. Revised drawings/specifications (see Summary of Changes, dated 05/11/26). All other terms and conditions remain the same. | 74% | Solicitation | 05/15/2026 |
Additional Details
Solicitation Number
W9128F20R0068
Archive Date
Jul 27, 2021
Office Address
OMAHA, NE, 68102-4901