Notice ID: 827cc152ee6a4c5088db69c18a0f30adAward NoticeAwarded
Construct Special Operations Command � North (SOCNORTH), Theater Operational Support Facility, Peterson AFB, Colorado
Awarded on April 27, 2021. Full description on SAM.gov.
Awarded tounder W9128F21C0019 (source: SAM.gov award notice)• $51.9M
Overview
- Posted
- April 27, 2021
- Notice type
- Award Notice
- Agency
- Department of War
Notice details
- Place of performance
- Colorado Springs, CO, 80914
- Last updated
- Dec 4, 2025
- Award date
- Apr 27, 2021
- Award amount (SAM.gov award notice)
- $51.9M
Identifiers
- Solicitation number
- W9128F20R0085
- Notice ID
- 827cc152ee6a4c5088db69c18a0f30ad
- Award number (PIID)
- W9128F21C0019
Description
Construction of a Special Operations Command – North (SOCNORTH), Theater Operational Support Facility, Peterson AFB, Colorado This solicitation is unrestricted 10/13/2020: Am-0001 issued. Provides instructions on requesting CAD/BIM files. 10/21/2020: Am-0002 issued. It revises specs, reissues some drawings, and reissues section 00 22 00. 10/28/2020: Am-0003 issued. It revises specs, resissues some drawings, and extends the close date to 02 December 2020. 11/5/2020: AM-0004 issued. It revises specs and reissues some drawings. 11/13/2020: AM-0005 issued. It revises specs and reissues some drawings, extends the Bidder Inquiry date to 02 December 2020 and extends the close date to 06 January 2021. 11/20/2020: Am-0006 issued. It reissues various spec sections, adds a spec attachment, and reissues 16 drawings. 12/04/2020: Am-0007 isued. It reissues 8 spec sections and 16 drawings. 12/9/2020: This change is to advise interested parties that ProjNet will remain open for questions and inquiries through 15 Dec. An amendment is forthcoming. 12/10/2020: Am-0008 Issued. It revised the duration to a fixed 840 calendar days, clarifies that bidder inquiries will remain open until 15 DEC, and reissues various spec sections including a page from Appendix C – FF&E. It also reissues 7 drawings. 12/18/2020: Am-0009 issued. It updates the wage rates and reissues 3 specs and 18 drawings. 12/21/2020: Am-0010 issued. It extends the proposal due date to 3 Feb 2021. 1/19/2021: Am-0011 issued. It updates wage rates, reissues 5 specs and 32 drawings. It also states that bidder inquiries will be open until COB on 21 JAN.
Award Overview
Award Number
W9128F21C0019
Award Amount (SAM.gov award notice)
$51.9M
Award Date
Apr 27, 2021
Awardee
Awardee UEI
Y9FCAN97NHC9
Awardee CAGE Code
0LNN2
Original Solicitation
Notice ID: 827cc152ee6a4c5088db69c18a0f30ad
Posted Date: Apr 27, 2021
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $55.2MSigned Aug 17, 2026
- $320.0MSigned Aug 13, 2026
- $55.2MSigned Aug 7, 2026
- $55.2MSigned Aug 6, 2026
- $55.2MSigned Jul 16, 2026
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W9128F20R0085- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 6×Pre-SolicitationJul 15, 2020
Construct Contract Special Operations Command � North (SOCNORTH), Theater Operational Support Facility, Peterson AFB, Colorado
- 14×SolicitationOct 6, 2020
Construct Special Operations Command – North (SOCNORTH), Theater Operational Support Facility, Peterson AFB, Colorado
- AwardedCurrentApr 27, 2021
Construct Special Operations Command � North (SOCNORTH), Theater Operational Support Facility, Peterson AFB, Colorado
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The USPFO for California intends to award a single firm-fixed-price contract for non-personal construction services, to include all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for the construction of a Combat Rescue Helicopter (CRH) Operational Flight Trainer (OFT) simulator facility at Moffett Air National Guard Base (ANGB), Mountain View, California. This project will provide an approximately 8,202 gross square foot building consisting of a multi-story, high bay area to house the CRH-OFT simulator, with a single-story area containing CRH mission planning, briefing and debriefing rooms, administrative areas for training and support staff, OFT maintenance and parts storage rooms, secure and non-secure tele-communication rooms, latrine facilities and mechanical, electrical and utility support rooms utilizing conventional design and construction. ATTENTION INTERESTED BIDDERS: The formal solicitation's documentation is hosted in the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. In order to access the solicitation and its attachments (including the plans and specifications), you must click on the "PIEE Solicitation Module Link for W50S8X26BA011" link provided below (see "Attachments/Links"). 0001 - Amendment (5 Oct 2026) Amendment 0001 has been issued. The SF1442 that was originally issued with the solicitation has been removed and replaced with the conformed SF1442 reflecting this amendment. This amendment provides the date, time, and location for the site visit; extends the bed submission deadline; and incorporates Pre-Bid Inquiries (Round 1). The conformed SF1442, SF30, and Pre-Bid Inquiries are available through PIEE. Click on the "PIEE Solicitation Module Link for W50S8X26BA011", then scroll to the "Update/Notice" section at the bottom of the page. Click on the amendment's link to access the attachments. 0002 - Update (8 Oct 2026) Pre-Bid Inquiries (Round 1) has been removed and replaced with Pre-Bid Inquiries (Round 2). This update revises the answer to questions 1-5 to coincide with the formal solicitation. Additionally, it provides all questions that have been submitted up to this date. The Government will provide responses for questions that do not have responses as soon as possible. 0003 - Update (15 Oct 2026) Pre-Bid Conference Slides, Minutes, and registration sheet have been posted to PIEE. 0004 - Amendment (22 Oct 2026) Amendment 0002 has been issued. The SF1442 has been revised to change Block 11 to reflect 570 calendar days, and the solicitation is amended to incorporate the Geotech Report as Attachment 10. Additionally, the amendment removes and replaces Questions & Answers (Round 2) with Questions & Answers (Round 3). 0005 - Amendment (27 Oct 2026) Amendment 0003 has been issued. The deadline for submission of pre-bid inquiries is changed (reference Section 00 21 00, para. 4.3), the bid submission deadline is extended (reference SF1442, Block 13), and Questions & Answers (Round 3) is removed and replaced with Questions & Answers (Round 4). 0006 - Update (2 Nov 2026) The Government is aware that the 27 November is the day after Thanksgiving and is tantamount to a holiday. The Government intends is still reviewing a large number of pre-bid inquiries and intends to issue another amendment with the responses to those inquiries while also extending the bid submission deadline. 0007 - Update (17 Nov 2026) Amendment 0004 has been issued. The bid submission deadline is extended (reference SF1442, Block 13). | 74% | Solicitation | 12/11/2026 |
This new two story Special Operations Facility (SOF) is approximately 107,800 GSF and includes a human performance center, a large multipurpose space, open office spaces & operations areas. The mission support areas have the joint staff offices, executive offices, labs, collaborative spaces, and meeting rooms. The facility includes redundant mechanical and electrical systems, secure telecommunication distribution systems, a loading dock area and larger server spaces. The scope of work provides a full core and shell and fit-out design, including structure and foundations; elevator conveyance systems; electrical/mechanical service and distribution components and systems; fire protection, alarm and suppression; information technology and infrastructure, communications, and security systems support infrastructure. The Interior fit-out will provide raised access floor systems, acoustically rated interior partitions and ceilings, power, lighting, environmental controls, and communications. | 72% | Awarded | Open |
B-21 Renovate B7918 | 72% | Awarded | Open |
*** 13 October 2026 UPDATE ***: Formal Request for Qualifications has been issued under Notice ID: W912QR279A001. The RFQ was issued 13 October. Responses are currently due 28 October. See RFQ posting for additional details. The U.S. Army Corps of Engineers (USACE) is issuing this special notice to announce an upcoming competition for construction solicitation for Fort Carson ECS using CM@Risk under 10 USC §2808a Other Transaction Authority for Construction. This notice is for informational and planning purposes to allow interested parties to prepare for and provide feedback prior to the official solicitation release. I. INDUSTRY DAY USACE intends to conduct an Industry Day on 06 October 2026 at 0900 Mountain Time to provide an overview of the project, acquisition strategy, and anticipated requirements. This event will provide interested parties with an opportunity to gain additional insight into the project and proposed Construction Manager at Risk (CM@Risk) approach under an Other Transaction (OT) framework, ask questions, and provide input in advance of the official Request for Qualifications (RFQ) release. General questions from industry participants will be permitted during the Industry Day; however, all discussions and responses provided during the event are considered unofficial and are for informational purposes only. Statements made during the Industry Day do not constitute a commitment, authorization, or binding guidance related to the future Request for Qualifications (RFQ). Official Questions and Answers (Q&A) will be accepted and addressed following the release of RFQ. Please use the direct special event link below to register for access to Fort Carson. You must be a U.S. Citizen and have a REAL ID to complete registration. If you do not, you must go the Fort Carson Visitor Control Center (located at Gate 1, located off 115 HW) with your State ID plus a U.S. Passport OR Certified birth certificate and Social Security Card to obtain access. Individuals with a valid CAC, should be able to access the installation directly. Direct Special Event Link https://pass.aie.army.mil/?b=usa&i=carson&e=M6JLHPVK Physical Access Control POC: Mark Elliott (719) 466-1132 mark.d.elliott24.civ@army.mil II. LOCATION/LOGISTICS Industry Day Presentation location: Butts Army Airfield Hangar – 9620 Son Tay Road NOTE: Onsite parking space may be limited, overflow parking is available in the vicinity Site Visit – Primary parking lot is at the CBRN Chamber across the tank trail at the intersection of Minick Ave and Prussman Blvd. Additional parking is available on Minick Ave less than a quarter mile NW of the CBRN Chamber lot. Onsite Directions Link Below. Turn by turn directions and map attached for download. https://maps.app.goo.gl/U4o1XusLDWip4gn87 III. PROJECT OVERVIEW Project Title: Construction of an Equipment Concentration Site (ECS) Complex Location: Fort Carson, Colorado Agency: U.S. Army Corps of Engineers, Louisville District NAICS Code: 236220 IV. PROJECT DESCRIPTION This acquisition will deliver a consolidated, fully functional ECS complex on an undeveloped 48-acre parcel of land at Fort Carson, CO. This site features a comprehensive range of facilities designed to support the mission of ECS-42, which is responsible for the maintenance and storage of key military assets assigned to 83 regional Army Reserve units. The operational readiness of this military equipment is essential for both training Army Reserve Soldiers and equipping units from which the Active component will draw upon for critical warfighting capabilities inherent to deployable combat forces. Core Facilities include: General Purpose Warehouse (GPW): A 39,313 square-foot (SF) secure, clear-span storage facility designed for the protection and preservation of military equipment. Area Maintenance Support Activity (AMSA) Shop: A 26,217 SF vehicle maintenance facility featuring advanced vehicle maintenance exhaust systems, overhead cranes, heavy-duty hoists, and specialized tool rooms. Organizational Storage Building: A 5,000 SF high-bay vertical storage facility. Container Storage Area: A 4,440-square-yard (SY) reinforced concrete layout for secure tactical container storage. Supporting Infrastructure & Specialized Systems include: Heavy Equipment Parking & Site Work: A Military Equipment Parking (MEP) lot featuring extensive heavy-duty concrete pavements designed to withstand high-shear tracked and wheeled tactical vehicle loads, alongside POV parking, security fencing, and utility tie-ins. Tactical Vehicle Wash Facilities: Two dedicated, high-capacity vehicle wash racks/platforms featuring industrial filtration and water-recycling systems. Bi-Level Loading Ramp: A reinforced bi-level loading ramp designed to facilitate the rapid loading and unloading of heavy armored vehicles onto transport carriers. Specialized Foundations: Geotechnical engineering solutions, including deep foundation systems and soil stabilization, to mitigate volatile soil conditions across the 48-acre site. Fire Protection: Advanced fire detection and suppression systems, including specialized solutions for high-bay maintenance areas and hazardous material storage, compliant with all relevant UFC and NFPA standards. Cybersecurity: Facility-related control systems will be designed and implemented in accordance with UFC 4-010-06, ensuring the cybersecurity of all networked building systems. UFC Compliance: The entire facility complex will be designed and constructed to meet all applicable Unified Facilities Criteria (UFC), including AT/FP (Antiterrorism/Force Protection) standards and sustainable design principles as outlined in the Army Sustainable Design and Development Policy. V. ACQUISITION STRATEGY - PRE-AWARD USACE, Louisville District will use a streamlined competitive selection process: Step 1 –White Papers: Interested parties will submit a Statement of Qualifications (max # of pages to be defined in formal RFQ). Following evaluation of the qualification packages, the Government intends to down-select up to three (3) highest qualified firms to proceed to Step 2. Step 2 – Pitch Presentations: Down-selected firms will participate in live pitch meetings. One company will be selected as the Construction Manager for negotiation and award of Agreement 1 for preconstruction services. The Government intends to negotiate a Guaranteed Maximum Price (GMP) for construction of the ECS, which will be added as a bilateral modification at a later date. VI. ACQUSITION STRATEGY – AWARD The agreement will be awarded to the most qualified Construction Manager at Risk (CMAR) to provide preconstruction services and construction. Phase 1 of the CM@Risk agreement will include pre-construction services. The selected CMAR will act as an expert consultant to the Government, collaborating directly with USACE and the third-party Designer of Record during active design progression. The Government’s intent is to award the Phase I Agreement for Preconstruction Services prior to the 65% design review meeting. Phase 2 of the agreement will include scope for all construction activities necessary to complete the project. The agreement will be Firm-Fixed-Price (FFP). All interested parties should monitor the official solicitation announcement, which will provide complete details and submission instructions. Draft documents may be provided at a future date for feedback and informational purposes only and are subject to change upon issuance of the formal Project RFQ. VII. Virtual Participation Opportunity: For those who are unable to attend the Industry Day even in person, the Louisville District plans to stream the event through Microsoft Teams. The details related to the MS Teams event are provided below: Microsoft Teams meeting Join: https://dod.teams.microsoft.us/meet/993580238205?p=NgWECEurH73BprxGc1 Meeting ID: 993 580 238 205 Passcode: kB2Fr9e2 | 72% | Special Notice | 10/06/2026 |
***Amendment 0003 posted to PIEE on 22 October 2026. ***Amendment 0002 posted to PIEE on 21 October 2026. ***Amendment 0001 posted to PIEE on 15 October 2026. The U.S. Army Corps of Engineers, Louisville District is issuing this Request for Qualifications for the Construction of Equipment Concentration Site (ECS) at Fort Carson, Colorado. This project will be executed as a Construction Manager at Risk (CMAR) Other Transaction Agreement (OTA) under the statutory authority of 10 U.S.C. 2808a, Facility Construction or Repair. This approach will involve the general contractor during the design phase to provide feedback and input to the designer of record and the government on constructability, operability, cost, and value engineering on the design being developed. | 71% | Solicitation | 10/28/2026 |
Additional Details
Solicitation Number
W9128F20R0085
Archive Date
May 12, 2021
Office Address
OMAHA, NE, 68102-4901