GovChime
Notice ID: 5e39497fb8374e058f7ec549d9eccc05Combined Synopsis/Solicitation

Tank Inspection - Fort Benning Georgia

Archived on May 11, 2021. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−05:00
Posted
April 12, 2021
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
541990: All Other Professional, Scientific, and Technical Services
Agency
Department of WarDepartment of the Army

Notice details

Office
W071 ENDIST OMAHA
Place of performance
Fort Benning, 31905
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W9128F21Q0047
Notice ID
5e39497fb8374e058f7ec549d9eccc05

Description

Perform an external AST inspection to include visual inspection of the containment area on tanks identified in attachment B. The tank Inspection shall be in conformance with applicable industry standards API 653, NFPA 30, NFPA 326, UFGS 33 01 50.60, and in compliance with 40 CFR 112, UFC 3-460-01, UFC 3-460-03 and any other applicable federal, state, local, service or host nation requirements. At a minimum, table 8-1 within UFC 3-460-01 shall be followed. All tank appurtenances that are required shall be documented along with all required appurtenances that aren’t present. Alarms, Automatic Tank Gauge equipment, and all tank appurtenances shall be tested and verified. The attached Inspection Report template should be utilized in submitting both the DRAFT and FINAL inspection reports. Contractor shall leave a clean and orderly site upon the completion of the inspection. If UT is required per Attachment B, coverage of the UT scan shall include 5 points per shell plate on the first shell course. Spot UT scans shall be made once every foot along the circumference of the tank shell within the critical zone and along the tank chime as accessible. 5 points per shell plate should also be taken along the spiral staircase for each shell course as accessible. Provide UT scans of tank shell nozzles on the first shell course and their respective reinforcements plates as applicable. Include all findings in the inspection report. Complete roundness survey if required per Attachment B. Provide DRAFT and FINAL inspection reports per the attached templates

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W9128F21Q0047
  1. Combined Synopsis
  1. Combined SynopsisCurrentApr 12, 2021

    Tank Inspection - Fort Benning Georgia

    Notice 5e39497fb8374e058f7ec549d9eccc05 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W9128F21Q0047

Archive Date

May 11, 2021

Office Address

OMAHA, NE, 68102-4901