Notice ID: afe369e319a84e8faf0d21ca40b40086Solicitation
Fort Randall Major Unit Rehabilitation Project
Archived on May 26, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−05:00
- Posted
- April 28, 2021
- Notice type
- Solicitation
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W071 ENDIST OMAHA
- Place of performance
- Pickstown
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W9128F21R0005
- Notice ID
- afe369e319a84e8faf0d21ca40b40086
Description
**04/28/2021: AMENDMENT 0006 POSTED** **04/09/2021: AMENDMENT 0005 POSTED. PROPOSAL DUE DATE EXTENDED TO 11 MAY 21 AT 2PM CENTRAL TIME. SEE AMENDMENT FOR ADDITIONAL CHANGES.** **04/09/2021: REFERENCE DOC IN RESPONSE TO PROJNET BIDDER INQUIRY 9104134** **03/29/2021: AMENDMENT 0004 IS POSTED. NO EXTENSION TO PROPOSAL DUE DATE** **03/12/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRIES 904123, 904124 & 9045637** **03/09/2021: AMENDMENT 0003 IS POSTED. NO EXTENSION TO PROPOSAL DUE DATE** **03/04/2021: REFERENCE DOCS IN RESPONSE TO PROJNET BIDDER INQUIRY 9071245** **02/16/2021: DOCUMENTS REFERENCES TO PROJNET INQUIRY 9009021 AND 9008811** **02/10/2021: AMENDMENT 0002 IS POSTED. RECIEPT OF PROPOSALS DATE HAS BEEN EXTENDED TO 20 APRIL 2021 AT 2:00 CENTRAL** **01/27/2021: REFERENCE DRAWINGS IN RESPONSE TO PROJNET BIDDER INQUIRIES 9017535 AND 9019225 POSTED** **01/21/2021: AMENDMENT 0001 IS POSTED** **01/20/21: WATER QUALITY REPORT POSTED IN RESPONSE TO BIDDER INQUIRY 8988556** **01/14/21: SITE VISIT PP PRESENTATION (PDF) POSTED** **01/13/21: SITE VISIT SIGN-IN SHEETS POSTED** **12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)** **SUMMARY OF CHANGES POSTED** The Government hereby issues the solicitation for the Fort Randall Major Unit Rehab. The solicitation closes on 25 March 2021 at 2pm Central. The solicitation is Unrestricted and Open to Both Large and Small Business Participation. ***UPDATED SITE VISIT INFORMATION*** Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020. Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary. Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained. To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020. During the site visit one unit will be dewatered and penstock open for turbine inspection. The turbine maintenance platform will be installed. The generator housing will be open with three upper hatches removed and will be available for inspection and measurements. The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split. Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection. Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Jessica R. Jackson
Contract Specialist
Secondary Contact
Nadine Catania
Contracting Officer
Documents
No documents available.
Lifecycle
Solicitation:
W9128F21R0005- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 3×Pre-SolicitationOct 5, 2020
Fort Randall Major Unit Rehabilitation Project
- 17×SolicitationCurrentDec 15, 2020
Fort Randall Major Unit Rehabilitation Project
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
********** SOURCES SOUGHT TECHNICAL DESCRIPTION AND MARKET SURVEY FOR LARGE-SCALE CIVIL WORKS CONSTRUCTION ********** ********** INTRODUCTION ********** ********** The United States Army Corps of Engineers (USACE), Chicago District is issuing this sources sought synopsis as a means of conducting market research to identify parties having an interest in and the resources to support the requirement for Thomas J O Brien Lock and Dam Major Rehabilitation - Construction, Chicago, Cook County, Illinois. The intention is to procure these construction services on a competitive basis. ********** ********** BASED ON THE RESPONSES TO THIS SOURCES SOUGHT NOTICE/MARKET SURVEY, THIS REQUIREMENT MAY BE SET-ASIDE FOR SMALL BUSINESSES (IN FULL OR IN PART) OR PROCURED THROUGH FULL AND OPEN COMPETITION. All Small Business Set-Aside categories will be considered. Telephone inquiries will not be accepted or acknowledged, and no feedback or evaluations will be provided to companies regarding their submissions. ********** ********** The contract type is anticipated to be Firm Fixed Price construction contract, using FAR Part 15 solicitation procedures. The proposed contract is subject to Construction Wage Rate Requirements. ********** ********** North American Industry Classification System Code (NAICS): 237990 - Other Heavy and Civil Engineering Construction (Size Standard: $45.0M) ********** Product Service Code (PSC): Z2KA - Repair or Alteration of Dams / Navigation Structures ********** Duration of Performance: Estimated at Three (3) Years; 1,095 calendar days. Specifics regarding the number of option periods will be provided in the solicitation. ********** Place of Performance: Thomas J O Brien Lock and Dam Major Rehabilitation - Construction, Chicago, Cook County, Illinois ********** ********** DISCLAIMER: THIS SOURCES SOUGHT IS FOR INFORMATIONAL PURPOSES ONLY. THIS IS NOT A REQUEST FOR PROPOSAL (RFP) TO BE SUBMITTED. IT DOES NOT CONSTITUTE A SOLICITATION AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT. RESPONSES IN ANY FORM ARE NOT OFFERS AND THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. NO FUNDS ARE AVAILABLE TO PAY FOR PREPARATION OF RESPONSES TO THIS ANNOUNCEMENT. ANY INFORMATION SUBMITTED BY RESPONDENTS TO THIS TECHNICAL DESCRIPTION IS STRICTLY VOLUNTARY. RESPONSES WILL NOT BE RETURNED TO THE RESPONDER. NOT RESPONDING TO THIS NOTICE DOES NOT PRECLUDE PARTICIPATION IN ANY FUTURE REQUEST FOR QUOTE (RFQ) OR INVITATION FOR BID (IFB) OR RFP, IF ANY ISSUED. IF A SOLICITATION IS RELEASED, IT WILL BE SYNOPSIZED ON THE GOVERNMENT-WIDE POINT OF ENTRY (GPE). IT IS THE RESPONSIBILITY OF POTENTIAL OFFERORS TO MONITOR THE GPE FOR ADDITIONAL INFORMATION PERTAINING TO THIS REQUIREMENT. ********** ********** PROGRAM BACKGROUND ********** ********** The U.S. Army Corps of Engineers (USACE), Chicago District (LRC), is preparing an acquisition strategy for Phase 2 construction of the T.J. O Brien Lock and Controlling Works Major Rehabilitation project on the Calumet River in Chicago, Cook County, Illinois. The facility features a 110 ft by 1,000 ft lock chamber with concrete-capped circular sheet pile cells and low-lift sector gates regulating water exchange between Lake Michigan and the inland waterway network. As the requiring activity, USACE Chicago District delivers comprehensive engineering, design, and construction management to execute structural, mechanical, and electrical revitalization, ensuring long-term operational reliability and structural integrity. ********** ********** REQUIRED CAPABILITIES ********** ********** The scope of this requirement includes: ********** ********** *Repair and strengthening of the upper and lower guide walls and chamber lock walls through grout injection. ***Repair of a portion of the upper guide wall that was impacted by a barge in early 2026. ***Replacement of the existing sector gate operating machinery with modern equipment Revisions to the sump pump pits under the control houses for ease of maintenance ***Replacement of site hatches and covers, removal of unused pits, and rehabilitation of associated concrete and drains ***Replacement of the culvert valve gates and actuators ***Installation of two new jib cranes to service all four screens for gate openings on the controlling works ***Replacement of all gates and actuators at the controlling works ***Various upgrades to the electrical service, ductbank, and control systems associated with the items previously listed ***Upgrades to the emergency lighting and circuitry in the lock house and maintenance garage ***Upgrades to the backup generator and uninterruptible power supplies ***Revisions to the main lock house roof drain outfall to eliminate backups into the lock house when the lock water near the outlet freezes during cold weather. ********** ********** SPECIAL REQUIREMENTS AND MARKET INQUIRIES: ********** ********** Business Section ********** ********** Section A - CORPORATE CAPACITY and BONDING ********** ********** If your organization has the potential capacity to perform these contract services, please provide the following information: ********** ********** 1. This requirement involves large-scale, high-risk civil works construction. Potential offerors must demonstrate that their available single-project bonding limit and working capital capacity are sufficient to support a single contract whose total commitment significantly exceeds the annual revenue size standard established for NAICS 237990. Please submit a formal letter of bondability from your surety specifying your single-project limit, aggregate limit, and remaining uncommitted capacity. If utilizing a Joint Venture or teaming arrangement to meet bonding and financial underwriting requirements, detail the administrative structure and combined capacity. ********** ********** 2. Please note that under a Small-Business Set-Aside, in accordance with FAR 52.219-14 (Limitations on Subcontracting), the small business prime must perform at least 15% of the work themselves in terms of the cost of performance, excluding materials. Please provide your tailored capability statements addressing the particulars of this effort, with appropriate documentation supporting claims of organizational and staff capability. If significant subcontracting or teaming is anticipated in order to deliver technical capability, organizations should address the administrative and management structure of such arrangements. ********** ********** 3. Small Business Subcontracting: Should this requirement be solicited as Full and Open Competition, other-than-small-business offerors will be required to submit an acceptable Small Business Subcontracting Plan in accordance with RFO 19.109 and 52.219-9, as applicable. ********** ********** Interested firms are requested to describe their experience meeting small business subcontracting goals on comparable construction projects, identify potential subcontracting opportunities for small businesses, and provide preliminary estimated subcontracting percentages by socioeconomic category. Firms should also identify anticipated challenges and strategies to maximize small business participation. ********** ********** 4. Provide a comprehensive company profile including current small/large business status and socioeconomic ownership status (Small, Small Disadvantaged, Women-Owned, HUBZone, or Service Disabled Veteran-Owned Small Business Concern), company profile to include number of employees, annual revenue history, office locations, UEI number, etc. ********** ********** 5. Can or has your company managed a team of subcontractors before? If so, provide details. ********** ********** 6. Can or has your company managed a task of this nature? If so, please provide details. ********** ********** SECTION B - PROJECT LABOR AGREEMENT (PLA) EVALUATION ********** ********** To assist USACE in evaluating the practicability, efficiency, and market impact of a Project Labor Agreement (PLA) pursuant to OMB Memorandum M-25-29 and federal procurement law: ********** ********** 1. Would your firm submit an offer for this project if a PLA is mandated? ********** ********** 2. Does your firm currently operate under collective bargaining agreements with building and construction trades in Cook County / Northern Illinois? ********** ********** 3. What is your assessment of the local skilled labor pool in Cook County for specialized trades (e.g., marine divers, heavy rigging, hydraulic mechanics, certified structural welders)? ********** ********** 4. Would requiring a PLA impact your project pricing or labor cost structure? If yes, estimate the anticipated percentage impact and explain the underlying cost drivers (e.g., benefit contributions, work rules, specialty subs). ********** ********** 5. Identify any operational benefits or significant risks associated with utilizing a PLA for this specific requirement. ********** ********** Technical Section ********** ********** SECTION C - TECHNICAL CAPABILITIES AND EXPERIENCE ********** ********** 1. What specific technical skills does your company possess which ensure capability to perform the tasks? Refer to the above REQUIRED CAPABILITIES section, and clearly identify the skills you have and describe how related to those capabilities. This includes identification of performance as you as a prime, and what you need to subcontract. ********** ********** 2. Describe your firm and experience (within the last 10 years) managing heavy marine/civil infrastructure projects exceeding $75M involving active navigation locks, underwater mass tremie grouting, or cofferdam dewatering. ********** ********** 3. Detail your capability to execute high-density mechanical/electrical equipment replacement within a rigid 120-day lock outage schedule. ********** ********** SECTION D - STATUTORY ENVIRONMENTAL PRODUCTS ********** ********** 1. Recovered Materials: Are commercial grout mixes, tremie concretes, and backfill materials containing EPA CPG recovered content (e.g., coal fly ash, ground granulated blast-furnace slag) readily available in the Chicago metropolitan market meeting USACE engineering standards? ********** ********** 2. BioPreferred Products: Can your firm source USDA BioPreferred certified biodegradable hydraulic fluids, gear lubricants, and form release agents that satisfy severe marine environmental operating criteria? ********** ********** 3. Long-Lead Items: Identify any long-lead equipment items (e.g., custom gearboxes, sluice gates, jib cranes) that could exceed 12 months fabrication time. ********** ********** SUBMISSION DETAILS (CAPABILITIES STATEMENT) ********** ********** Interested parties are requested to submit the capability requirements in Sections A thru D, within ten (10) pages in length, and a font of not less than 10 pitch. Please only include a narrative of the requested information; additional information will not be reviewed. ********** ********** The deadline for response to this request is no later than 2:00 PM, Central Time November 27, 2026. All responses under this Sources Sought Notice must be e-mailed to ericka.d.hillard@usace.army.mil and sara.t.king@usace.army.mil. Include in the subject line the title of this requirement. ********** ********** The Government will evaluate market information to ascertain potential market capacity to: ********** ********** 1. provide services consistent, in scope and scale, with those described in this notice and otherwise anticipated; and ********** ********** 2. secure and apply the full range of corporate financial, human capital, and technical resources required to successfully perform similar requirements. ********** ********** Your response to this Sources Sought, including any capabilities statement, shall be electronically submitted to the Contract Specialist, Ericka Hillard, and Contracting Officer, Sara King, in either Microsoft Word or Portable Document Format (PDF), via email to ericka.d.hillard@usace.army.mil and sara.t.king@usace.army.mil. ********** ********** All data received in response to this Sources Sought that is marked or designated as corporate or proprietary will be fully protected from any release outside the Government. No phone calls will be accepted. All questions must be submitted to the contract specialist and contracting officer identified above. The Government is not committed nor obligated to pay for the information provided, and no basis for claims against the Government shall arise as a result of a response to this Sources Sought. ********** | 80% | Market Research | 11/27/2026 |
PROJECT TITLE: JOHN DAY UNIT 10 PACKING BOX REPLACEMENT PROJECT LOCATION: JOHN DAY DAM, SHERMAN COUNTY, OREGON THIS IS A FULL AND OPEN PROCUREMENT. IN ACCORDANCE WITH RFO 19.110, THIS PROJECT REQUIRES THE HUBZONE 10% PRICE EVALUATION. THE JOHN DAY DAM ON THE COLUMBIA RIVER BETWEEN SHERMAN COUNTY, OREGON, AND KLICKITAT COUNTY, WASHINGTON. THE ESTIMATED MAGNITUDE OF CONSTRUCTION IS BETWEEN $500,000.00 AND $1,000,000.00. THE NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE FOR THIS ACTION IS 237990; OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION WITH A SMALL BUSINESS SIZE STANDARD OF $45M. AS PRESCRIBED IN DFARS 204.7504(A), THIS REQUIREMENT INCLUDES DFARS CLAUSE 252.204-7021 COMPLIANCE WITH THE CYBERSECURITY MATURITY MODEL CERTIFICATION (CMMC) LEVEL REQUIREMENTS. THE CMMC LEVEL REQUIRED BY THIS SOLICITATION IS CMMC LEVEL 1. BID OPENING WILL OCCUR ONE (1) HOUR AFTER BID CLOSING AT 2:00 PM PST DECEMBER 4TH, 2026. | 75% | Solicitation | 12/04/2026 |
* Bid Abstract uploaded September 21, 2026. * Amendment 0003 - The purpose of this amendment is to make the following changes to the solicitation: SOLICITATION CLOSING DATE The solicitation closing date is hereby extended from Friday, September 18, 2026, at 9:00 PM Pacific Daylight Time (PDT) to Monday, September 21, 2026, at 9:00 AM Pacific Daylight Time (PDT). NEW SOLICITATION CLOSING DATE: Monday, September 21, 2026, at 9:00 AM Pacific Daylight Time (PDT) BID OPENING The bid opening will be conducted on Monday, September 21, 2026, at 10:00 AM Pacific Daylight Time (PDT). Bids received prior to the solicitation closing date and time will be secured and opened at the date and time specified above. Will send TEAMs link once BID is received. *Amendment 0002 - The purpose of this amendment is to make the following changes to the solicitation: 1. Extend the Solicitation Closing Date: The solicitation closing date is hereby extended by one week, from September 11, 2026, to September 18, 2026. 2. Clarify Bidder Inquiry Deadline: The bidder inquiry provision is revised from: No response will be posted to inquiries after Close of Business on the seventh business day preceding the solicitation due date to: The deadline for submission of bidder inquiries is Close of Business on the seventh business day preceding the solicitation due date. Inquiries received after this deadline may not be answered. 3. Add Pertinent Documents/Attachments: The following six (6) documents/attachments are hereby added to the solicitation: A9 - Work Space Access Trailer and Parking Location, A10 - Pump Access, A11 - Propeller Condition, A12 - JDA Fish Pump rehab drawings, A13 - SouthFishwayPumps_OandM Manual, A14 - SouthFishTurbine-Unit3_OandM Manual (all documents previously designated as CUI have been downgraded) 4. Remove Attachment: Attachment AMD0002_Technical Sections.pdf is hereby removed from the solicitation. 5. Revise Specifications: The following revisions are hereby incorporated into the solicitation specifications: File Section Changes Specifications 15 00 00.03 25 Paragraph 1.4.2 is revised to change pump shaft assembly and propeller assembly to vertical shaft assembly. Paragraph 2.1.2 is revised to change pumpshaft to pump propeller. Specifications 01 10 10.00 25 Paragraph 1.6.b is amended to extend the outage window through June 30, 2028.Specifications 09 97 02.00 25 Paragraph 3.5 is amended to include the extension shaft in the painting schedule. All other terms and conditions of the solicitation remain unchanged.*Amendment 0001 - The purpose of this amendment is to extend the solicitation closing date by two weeks from August 28, 2026 to September 11, 2026. All other terms and conditions of the solicitation remain unchanged. PROJECT TITLE: JOHN DAY FISH PUMP REHABILITATION PROJECT LOCATION: JOHN DAY LOCK AND DAM, RUFUS, OR DESCRIPTION: REMOVAL, REFURBISHMENT, AND REPLACEMENT OF MAJOR COMPONENTS OF FISH PUMP UNIT 1, INCLUDING BUT NOT LIMITED TO SHAFTS, BEARINGS, BEARING BRACKETS, AND RIGHT-ANGLE DRIVE GEARBOXES. MAGNITUDE OF CONSTRUCTION: BETWEEN $5,000,000 - $10,000,000 NAICS: 237990 OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION SIZE STANDARD: $45,000,000 SOCIO-ECONOMIC CONSIDERATIONS: TOTAL SMALL BUSINESS SET-ASIDE Bid Opening: Monday, September 21st, 2026, at 10:00 AM Pacific Daylight Time (PDT). Will send TEAMs link once BID is received. Due to CMMC access requirements, in order to gain access to CUI attachments, please verify your organization has a minimum CMMC Level 1 Self verification and submit your CMMC Unique Identifier Number and CAGE Code via email to joseph.b.jarvis@usace.army.mil and cory.r.pfenning@usace.army.mil. BIDS DUE: Friday, September 18th, 2026, at 09:00 PM Pacific Daylight Time (PDT). BID OPENING: Monday, September 21st, 2026, at 10:00 AM Pacific Daylight Time (PDT). | 75% | Solicitation | 09/21/2026 |
EVENT DETAILS: Date: 3 December 2026 Time: 0930-1430 PT Format: Presentation & Site walk Registration Due Date: 23 November 2026, 1200 PT; Please register by returning completed Request for Visit Authority (RVA) by email to: Sarah Malowicki, Project Manager, at sarah.m.malowicki@usace.army.mil, AND Londres Medranda, Contract Specialist, at londres.medranda@usace.army.mil. Confirmation email will be sent upon receipt of completed RVA. Who Should Attend: Interested vendors, including small businesses, large businesses, and other industry partners. Attendance is limited to 2 personnel per company. Attendance is limited to United States Citizens. Attendance at this event is not mandatory. Pre-registration is required. DESCRIPTION: In accordance with the Revolutionary Federal Acquisition Regulation Overhaul (RFO) 15.101(a) Early exchanges with industry, the United States Army Corps of Engineers (USACE), Seattle District (NWS) is hosting an Industry Day on 3 December 2026 at Chief Joseph Dam in Bridgeport, Washington. This Industry Day provides an opportunity for interested parties to inspect the existing 15.5KV Main Unit XJ Breaker disconnects first-hand. By hosting this first-hand inspection, the government aims to gather technical feedback and explore industry alternatives for modernizing this equipment. We are seeking input from qualified, experienced sources, capable of performing this modernization work. PROJECT BACKGROUND: At Chief Joseph Dam the current Unit 1-16 XJ Breaker disconnects are original BBC (Brown Boveri Corporation) equipment and rated 6000A according to the BBC shop drawings. The switch operators are pneumatically driven, and are actuated by operation of a complex key interlocking scheme with the circuit breaker. The load side and source side disconnects are mechanically linked and simultaneously operated by a single shared pneumatic actuating system. The current Units 17-27 breaker disconnects are original GE equipment. The load side and source side disconnects are mechanically linked and simultaneously controlled by mechanically operated hand crank. USACE is evaluating options to improve reliability, maintainability, remote-operating capability, and overall generating-unit availability. • Option 1: Refurbish and restore existing disconnect switches to an approved condition equivalent to original design intent, as technically feasible. Integrate motorized mechanisms on the switch arms to enable remote operation, and comprehensively overhaul and test the existing main unit breakers to ensure optimal system protection. • Option 2: Replace the disconnect switches with new electrically operated units and refurbish the existing breakers. • Option 3: Replace both the disconnect switches (with new electrically operated units) and the main unit circuit breakers. • Option 4: Replace the entire switchgear assembly with new enclosures, modern electrically operated disconnect switches, and new circuit breakers (includes associated controls, protection, buswork and new enclosure). Chief Joseph Dam has several critical limitations that affect this project, primarily related to space constraints. This Industry day will present the options under consideration, obtain industry feedback on technical feasibility and constructability, and identify potential risks, constraints and cost drivers. USACE is requesting feedback on the following questions and relevant, non-binding information: Does your company have the ability, capacity, interest and willingness to perform the proposed options? Does your company have experience with comparable medium-voltage/high-current generation-station disconnect and breaker modernization projects? We are not currently requiring quotes or bids, however rough estimates would be greatly appreciated. Recommended technical approaches or alternatives Major schedule outage, access, safety, supply-chain or constructability risks. Do you believe all aspects of this requirement could be successfully performed by the small business sector under NAICS 237990 (Size standard $45M)? (Yes/No). If No, what estimated percentage do you think can be subcontracted out to small business? Small Business (SB) ______% Small Disadvantaged Business (SDB) ________% Woman-Owned SB (WOSB) _______% Veteran Owned SB (VOSB) _______% Service Disabled VOSB (SDVOSB) _______% Historically Underutilized Business Zone (HUBZone) _______% Important Notice: Attendance and participation is not required for consideration on future contracts related to this work. The U.S. Government is not obligated to pay for any information, documentation, demonstrations, or data provided, nor will it reimburse any costs incurred by your organization in preparing responses, traveling to, or participating in this Industry Day and physical equipment inspection. All costs associated with attending this event and participating in this information exchange are solely at the responding party’s expense. Small Business Program Inquiries: Enshane Hill-Nomoto: Enshane.Nomoto@usace.army.mil https://www.nws.usace.army.mil/Business-With-Us/Small-Business/ Thank you for your interest in this USACE project. | 73% | Special Notice | 11/23/2026 |
68% | Awarded | Open |
Additional Details
Solicitation Number
W9128F21R0005
Archive Date
May 26, 2021
Office Address
OMAHA, NE, 68102-4901