Notice ID: 40b1727dc21e4d8e8db14912ac519ad9Presolicitation

Fort Peck Butterfly Valve Rehabilitation Powerhouse 2

Archived. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−05:00
Posted
February 6, 2023
Notice type
Presolicitation
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W071 ENDIST OMAHA
Place of performance
Fort Peck, 59223
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W9128F23B0009
Notice ID
40b1727dc21e4d8e8db14912ac519ad9

Description

PRESOLICITATION NOTICE: FULL AND OPEN COMPETITION (UNRESTRICTED) On or about 21 February 2023, the U.S. Army Corps of Engineers (USACE), Omaha District (NWO), intends to pursue award of a contract to refurbish the eighteen (18} foot diameter spiral case inlet butterfly valves (BFVs) and associated systems for the two (2) generator units for Powerhouse 2 at Fort Peck Dam located near Glasgow, MT. This includes associated equipment such as valve operators (hydraulic cylinder), bypass piping and valves, spiral case and tunnel drain valves, valve access hatches and maintenance platforms, hydraulic power units (HPUs} and BFV controls. Nondestructive examination (NDE) of the penstock tunnels will also be required to assess tunnel wall corrosion. The BFVs will be refurbished in-place to improve internal bypass leakage on units 4 and 5 valve discs and address component end of life and system reliability. Refurbish existing bronze disc seals with new stainless steel mounting/adjusting hardware and o-rings, address coating deterioration and corrosion by sand blasting and recoating, perform non-destructive examination (NDE) of discs after blast and prior to re-coating, and replace BFV shaft and thrust bearings. Refurbished penstock BFV systems should be functional with limited maintenance required for a 50-year life. This contract may also include optional bid items to conduct paint repairs on the exterior of the penstocks and weld repairs on the valve discs. The contractor will be required to provide and implement proper PPE as necessary throughout the duration of the project. Contractor will be required to provide all equipment and certifications / licensure necessary to complete this project. Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting that they must perform at least 15% of the cost of the contract, not including cost of materials, with their own employees for general construction-type procurement. **NOTE** Please refrain from asking questions during the presolicitation 15 days, Bidder Inquiry will be open when the Solicitation is posted. Site Visit will to be determined.**

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W9128F23B0009
  1. Pre-Solicitation

Formal solicitation typically follows within 30–60 days. (estimate)

  1. Pre-SolicitationCurrentFeb 6, 2023

    Fort Peck Butterfly Valve Rehabilitation Powerhouse 2

    Notice 40b1727dc21e4d8e8db14912ac519ad9 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W9128F23B0009

Archive Date

Not specified

Office Address

OMAHA, NE, 68102-4901