Notice ID: a853cde621f140eab556719954ade96fSolicitation
Oahe Switchyard Disconnect Switch Replacement
Archived on August 4, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−05:00
- Posted
- June 30, 2023
- Notice type
- Solicitation
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W071 ENDIST OMAHA
- Place of performance
- Pierre, 57501
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W9128F23R0003
- Notice ID
- a853cde621f140eab556719954ade96f
Description
****UPDATE 30 JUNE 2023: Amendment 0003 posted to SAM.gov. Date proposals are due has been extended to 20 July 2023. ****UPDATE 27 JUNE 2023: Amendment 0002 posted to SAM.gov. Date proposals are due has been extended to 14 July 2023. Updated specifications uploaded to Attachments. Site visit sign in sheets from 14 June and 27 June has also been uploaded to Attachments. ****UPDATE 22 JUNE 2023: Amendment 0001 posted to SAM.gov. Updated Specifications and drawings uploaded to Attachments. The U.S. Army Corps of Engineers, Omaha District, hereby announces the solicitation for “Oahe Switchyard Disconnect Switch Replacement”. The solicitation will close on 06 July 2023. The solicitation is Unrestricted and Open to Both Large and Small Business Participation. Site Visit: A Site Visit is scheduled and additional information regarding the site visit is provided in the solicitation via FAR Clause 52.236-27. The site visit is scheduled for 14 June 2023. Project Description: This project will involve the replacement of the high voltage disconnect switches in the 115kV and 230kV switchyards which includes 40 manual switches, 13 MODs, and 15 grounding switches. The steel switch supports will be re-used with new mounting plates added for mounting the new switches. The suspension insulators connecting the switches to the generator step-up transformers and transmission lines will also be replaced. The horizontal 1 ½” bus sections between the breakers and disconnect switches will be replaced with 3 ½” aluminum tubular bus. All vertical bus sections will be replaced with AAC (all aluminum conductor) cables. An inspection of the 230kV and 115kV switchyard aluminum main and auxiliary buses will be conducted with a total allowance in the bid documents of 60 inches of weld repair for deficiencies found. Feeder and control cables will be replaced for the new MODs. The Contractor will be required to commence work upon receipt of contract award and complete the work 730 calendar days after receipt of Notice to Proceed, this is subject to change after solicitation issuance. Estimated Construction Costs: The estimated construction cost of this project is between $5,000,000.00 and $10,000,000.00. NAICS Code: The Primary North American Industry Classification System (NAICS) code anticipated for solicitation is 237130 - Power and Communication Line and Related Structures Construction, with a size standard for Small Business of $45M. Obtaining Solicitation Documents: Solicitation documents are posted to the web via SAM.gov (sam.gov). Find solicitation announcement in SAM.gov (sam.gov). Use the ‘All Award Data' to locate the project (by entering the solicitation number. By using the ‘login' feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted. Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the left side reading ‘Attachments/Links’. Contracting Office Address: USACE Omaha District 1616 Capital Ave, Omaha, NE 68102-4901 Point Of Contact: All questions shall be submitted on ProjNet (ProjNet access, and additional guidance are contained within the solicitation). Place of Performance: Oahe Dam Pierre, SD 57501 Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be up-dated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov (sam.gov). Registration is required to access solicitation documents. SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendments.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Brianna Boehne
Secondary Contact
Daniel D. Monahan
Documents
No documents available.
Lifecycle
Solicitation:
W9128F23R0003- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 3×Pre-SolicitationMay 3, 2023
Oahe Switchyard Disconnect Switch Replacement
- 5×SolicitationCurrentMay 31, 2023
Oahe Switchyard Disconnect Switch Replacement
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The project is to replace two 80 KVA Uninterruptable Power Systems (UPSs) with two distributed redundant 75 KVA UPSs within the Readiness and Control building on the Missile Defense Complex at Fort Greely. TO RECEIVE A COPY OF THE SOLICITATION AND AMENDMENTS PLEASE EMAIL BRITTNEY MORRISON AT BRITTNEY.MORRISON@USACE.ARMY.MIL AND MICHELLE NELSEN AT MICHELLE.NELSEN@USACE.ARMY.MIL | 61% | Solicitation | 01/22/2026 |
5 AUGUST 2026 UPDATE TO AMENDMENT 0007: Please note bid inquiries through 8 July 2026 have been posted to PIEE Solicitation (link below) due to known accessibility issues. $1.7B UNR TWO-PHASE DB/DBB MATOC FOR CONSTRUCTION OF THE GBSD UTLITY CORRIDOR AT F. E. WARREN AFB, WY. Reference Section 00 00 00 Procurement and Contracting Requirements for additional not included on the SF 1442 description. The Phase Two Seed Project Specifications and Drawings contain Controlled Unclassified Information and instructions to request access to these documents are located in Section 00 00 00. Vendors must be registered in both System for Award Management and Procurement Integrity Enterprise Environment to obtain approval for access to all CUI documents and submit proposals. Reference Solicitation Section 00 22 10 for registration instructions to access these systems. Reference the Solicitation for compliance with NIST and Cybersecurity Maturity Model Certification requirements as it pertains to this acquisition. | 54% | Solicitation | 09/03/2026 |
This contract was awarded on November 12, 2026 to Martin Brothers Construction for $26,711,770.00. | 52% | Awarded | Open |
Introduction: The U.S. Army Corps of Engineers, Japan District (POJ), is performing market research for an upcoming Design-Bid-Build (DBB) requirement entitled, “DLA DWCF B1907 Backup Power Generator, Yokosuka, Japan.". This announcement represents a market survey that is intended for planning purposes only. The purpose of this notice is to identify sources capable of performing this project and to receive responses from those firms to assist the Government's acquisition planning. This survey does not constitute a commitment by the Government for any follow-on announcements, solicitation, or award. This notice is NOT a solicitation. The Government will not pay for any information provided as a result of this market survey. This market survey is intended for local sources only. Local sources are those sources physically located and licensed to conduct business in Japan. Firms interested and capable of performing this work are highly encouraged to submit a response (submission requirements are located within this notice). We are committed to partnering with industry as much as we can throughout this process and therefore encourage all interested companies to respond to this sources sought. Market research and industry feedback is an essential part of the acquisition process. The information requested in this announcement will be used within POJ to facilitate decision-making and will not be disclosed outside the agency. However, respondents submitting business information pursuant to this announcement should consult 41 C.F.R. parts 105-60 and other implementing regulations concerning the release of such information to third parties under the Freedom of Information Act (FOIA). All information submitted by respondents that they consider confidential and not releasable to third parties outside of USACE, and its employees, agents, consultants, and representatives, must be clearly and conspicuously marked. SYSTEM FOR AWARD MANAGEMENT (SAM) All interested companies, including joint ventures, shall be registered in the SAM database in order to be eligible for award of Government contracts. https://www.sam.gov LOCAL SOURCES Firms which have not done business with U.S. Army Corps of Engineers, Japan Engineering District, are requested to visit the following website: https://www.poj.usace.army.mil/Business-With-Us/ for general information. This contract will be performed in its entirety in the country of Japan and is intended only for local sources. Only local sources will be considered under this solicitation. Local sources are sources (e.g. corporations, partnerships, or Joint Ventures [For a Joint Venture, the Joint Venture as an independent entity must satisfy the local source requirements or, in the alternative, each member of the Joint Venture must individually satisfy the local source requirements]) that are physically located in Japan and authorized (i.e. licensed and registered) to perform construction in Japan. Specifically, a prospective offeror must be duly authorized to operate and conduct construction business in Japan and must fully comply with all applicable laws, decrees, labor standards, and regulations of Japan during the performance of the resulting contracts. In addition, offerors must possess a Japanese civil construction (doboku isshiki koji) license or Japanese architectural construction (kenchiku isshiki koji) license by the proposal due date and time. The U.S. Government will verify that the offeror has the license through the Ministry of Land, Infrastructure, Transport and Tourism (MLIT) website at https://etsuran2.mlit.go.jp/TAKKEN. It is the responsibility of the offeror to ensure that it has the license (Japanese civil construction or Japanese architectural construction), and that it is accurately shown on the MLIT website, by the proposal due date and time. Failure to comply with this requirement will be cause for rejection of your offer. The U.S. Government will not offer “United States Official Contractor” status under Article XIV of the US-Japan Status of Forces Agreement (SOFA) to U.S. contractors normally resident in the United States; nor will the U.S. Government certify employees of such contractors as “Members of the Civilian Component” under Article I(b) of the SOFA. PROJECTS INFORMATION: Project Title: DLA DWCF B1907 Backup Power Generator Project Location: Yokosuka Japan Project FSC: Y1MZ - Construction of EPG (Electric Power Generation) Facilities—Other, Including Transmission Project NAICS: 237130 - Power and Communication Line and Related Structures Construction Project Magnitude: Between ¥500,000,000 and ¥2,000,000,000 (Japanese YEN) Project Description: Design-Bid-Build. Install a backup generator to support the mission at Building 1907. The new backup generator is expected to provide backup power to B1907 for the next 10 years at minimum. The generator has been sized to handle the following planned future loads: five new VLMs assumed to be rated the same as the existing VLMs(total of ~45 kW), operation of all four existing conveyor elevators (currently only two are operational at this time; two conveyors are fed from a 200A @ 210V, 3ph/3w feed), and an expected 20% increase in loads for the server rooms (total of ~20 kW). Anticipated Period of Performance: 518 Calendar Days Procurement Method: The Government intends to issue an Invitation for Bid (IFB) Solicitation. The Government anticipates that a solicitation will be issued approximately in May 2027. This survey does not constitute a commitment by the Government for any follow-on announcements, solicitation(s), or award(s). Any solicitation(s) pursued will be intended for local sources only. Local sources are those sources physically located and authorized to perform construction work in Japan. Draft plans and specifications are being provided for INFORMATIONAL PURPOSES. Offerors are cautioned that these drawings and specifications are in DRAFT FORMAT. ========================================================================== REQUESTED INFORMATION Interested firms are requested to reply with the following information no later than 11 December 2026 Japan Standard Time. Please submit your responses via e-mail to Mr. Ryan Marzetta, Contracting Officer at ryan.j.marzetta@usace.army.mil and Mr. Jiro Miyairi, Contract Specialist at jiro.miyairi@usace.army.mil Name of your company, address, phone number, email, SAM UEI, CAGE Code, and English Speaking Point of Contact (POC) name. Does your company have CMMC certification? If yes, what level and when does it expire. Identify your current construction bonding levels: a. Single Contract Amount b. Aggregate Maximum Contract Amoun c. Name of Sureties Identify which project(s) your firm is interested in and describe your firm's interest, capability and experience relative to the work described in the interested Project Description. Please provide at least one (1) project, but no more than three (3) projects, that is comparable to this project your company has completed (for government or commercial customers) in the past six (6) years. a. Project Title and Location b. Customer/Agency c. Project Value and Brief Description d. Date Completed or Percent Complete e. Your role (Prime, Subcontractor, Designer of Record, Joint Venture, etc) Technical Questions a. Does the Period of Performance seem reasonable? If not, provide what your company believes to be the Period of Performances (PoP) for the project. b. Are you expecting any long lead items? If so, which items and how long will it take to procure. c. Will a 1100 KVA package unit generator readily available in Japan. Will it need to be custom made? Do you have any other concerns related to the Draft technical specifications and drawings? Are there any other comments or suggestions that may increase your interest? Additional Info: U.S. Army Corps of Engineers, Japan District, Camp Zama, Japan Contracting Office Address: USACE District, Japan Attn: CEPOJ-CTN Unit 45010 APO, AP 96343-5010 Points of Contact: Jiro Miyairi 046-407-8837 jiro.miyairi@usace.army.mil Ryan Marzetta 046-407-8725 ryan.j.marzetta@usace.army.mil | 52% | Market Research | 12/11/2026 |
SOURCES SOUGHT NOTICE Electrical Upgrades to Support Future Three-Phase Power Supply Service - Lac qui Parle Dam near Watson, MN Notice ID: W912ES27SS0001 Issuing Office: U.S. Army Corps of Engineers (USACE) - St. Paul District Response Due Date and Time: 19 Nov 2026, 5:00pm (central time) 1.0 General Information Primary Point of Contact: Name: Justin Rose Title: Contract Specialist Email: justin.h.rose@usace.army.mil Secondary Point of Contact: Name: Sharon Frank-Scheierl Title: Contracting Officer Email: sharon.m.frank-scheierl@usace.army.mil NAICS Code: 237130, Power and Communication Line and Related Structures Construction Small Business Size Standard: $45 million Place of Performance: Lac qui Parle Dam, Watson, MN 56295. 2.0 Disclaimer This Sources Sought notice is issued in accordance with Revolutionary FAR Overhaul (RFO) Federal Acquisition Regulation (FAR) 15.201 for market research and planning purposes only and does not constitute a solicitation or a promise to issue a solicitation in the future. This notice does not commit the U.S. Government to contract for any supply or service whatsoever. The Government will not award a contract based on responses to this notice. The Government is not responsible for any costs incurred by respondents in the preparation of information for submission in response to this notice. All information received in response to this notice that is marked as proprietary will be handled accordingly. Responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. All responsible sources may submit a capability statement, which shall be considered by the agency. 3.0 Project Description & Background The USACE - St. Paul District is conducting market research to identify qualified sources capable of performing electric upgrades at Lac qui Parle Dam near Watson, MN. Anticipated Scope of Work: The anticipated work is intended to prepare the dam for future three-phase gate-actuator upgrades while maintaining operation of existing 120/240-volt, single-phase actuators. The construction contractor’s anticipated work includes furnishing all labor, tools, equipment, supervision, testing, and incidental work necessary to: Maintain/refeed the single phase 120/240-volt transformer located on the southeast side of the dam for lighting, gage house, and toilet area; Supply and install multiple utility poles (likely from the south heading north); Supply and install three (3) 480-volt transformers and metering equipment on final utility pole near dam; Connection from an existing 480-volt, three-phase source to a new service/distribution panel; Existing conduit and conductors will be demolished and cut (removal of demolished conduit will be completed by USACE); Existing single-phase feed to the dam will be disconnected by the contractor, the contractor may salvage the wire; Coordinate easements with the U.S. Army Corps of Engineers (and Lac qui Parle County for any work is off USACE property); Coordinate metering, transformers, power access, and other needs with USACE and MN Valley Light and Power (local utility service); Testing, grounding, submittals, and applicable state inspection; Potential for tree and brush removal. Objective: USACE is seeking market feedback on: The availability of qualified small businesses; Appropriate NAICS and size standard; Feasibility of a small-business set-aside; Likely construction duration, lead times, and site/utility coordination constraints. Schedule Flexibility: The Government anticipates coordinating the work with the serving utility. Any resulting solicitation will identify the anticipated period of performance, access procedures, outage coordination requirements, and site-visit information. Estimated Magnitude for Construction: The estimated magnitude of this project is between $30,000.00 and $70,000.00. The Government is seeking information to assess market capability, small-business interest, appropriate acquisition strategy, and potential schedule or utility-coordination concerns. 4.0 Information Requested from Interested Parties Interested firms are invited to submit a capability statement of no more than two (2) pages, not including attachments like letters of commitment. The Government is requesting only the minimum information necessary to determine capability, in accordance with RFO FAR 10.001. Your response must include the following information: Firm name, address, primary point of contact (name, title, phone, email); SAM UEI/CAGE and business-size/socioeconomic status under the selected NAICS; Please certify your firm's status for NAICS 237130: Small Business (SB), 8(a) Business Development, HUBZone, Service-Disabled Veteran-Owned Small Business (SDVOSB), Woman-Owned Small Business (WOSB), or Other than Small Business Confirmation of capacity to perform licensed electrical construction work in Minnesota; At least two (2) relevant projects, with a brief description and approximate value; Whether the firm can self-perform the principal electrical work; Interest in a site visit, if one is contemplated; Any material concerns with the anticipated scope, schedule, utility coordination, outage requirements, or permitting/inspection. Capability and Experience Capability Narrative: A brief narrative describing your firm's capabilities, special qualifications, certifications, and equipment relevant to performing the work described in Section 3.0 above. Relevant Project Experience: Provide at least two (2) examples of projects completed within the last five (5) years that are similar in size, scope, and complexity to this requirement. For each project, provide: * Project Title and Location * Contract Number and Type * Initial and Final Contract Value and Completion Dates Period of Performance * Role (Prime Contractor or Subcontractor) and percentage of work self-performed. * A brief narrative describing the project and how it relates to the scope of this notice. * A customer point of contact (Name, Title, Phone, Email). 5.0 Submission Instructions Responses are due no later than the date and time specified in this notice. Submit responses electronically to the Primary and Secondary Points of Contact. The email subject line shall read: "Sources Sought Response: Notice ID W912ES27SS0001 - [Your Company Name]" or similar. Marketing materials are not requested and will not be reviewed. Do not submit a proposal. | 52% | Market Research | 11/19/2026 |
Additional Details
Solicitation Number
W9128F23R0003
Archive Date
Aug 4, 2023
Office Address
OMAHA, NE, 68102-4901