Notice ID: cc7d33396897400d8eb2910c93bc2028Solicitation
GBSD Integrated Command Center - FE Warren AFB
Archived on March 30, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−05:00
- Posted
- December 20, 2023
- Notice type
- Solicitation
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W071 ENDIST OMAHA
- Place of performance
- FE Warren AFB, WY, 82001
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W9128F23R0022
- Notice ID
- cc7d33396897400d8eb2910c93bc2028
Description
***AM-0008 - Updated Wage Rate*** ***AM-0007 - Updated Wage Rate and Offeror Acceptance Period Revision*** ***AM-0006 - Updated Wage Rate and Offeror Acceptance Period Revision*** ***AM-0005- Revised Specs/Drawings, Proposal Due Date Extension*** ***AM-0004 - Revised Specs/Drawings*** ***AM-0003 - Revised DIV 21/22, updated Specs/Drawings and removal of NOFORN*** ***AM-0002 - Revised DIV 22 and Specs/Drawings*** ***AM-0001 - Revised DIV 22 and updated header to CUI/NOFORN*** ***Specifications and Drawings must be requested via DoD SAFE, in order to access drawings*** This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION. The construction acquisition method is design-bid-build (construction). Project Description: This project consists of renovating an approximate 60,000 Square Foot (SF) facility to support the Ground Based Strategic Deterrent (GBSD) Intercontinental Ballistic Missile mission at F.E. Warren Air Force Base. This project will include a space or spaces constructed to secure area standard Intelligence Community Directive/Intelligence Community Standard 705 (ICD/ICS 705) See 01 14 00 WORK RESTRICTIONS for additional information and requirements. This project will include space or spaces for emergency power, High-altitude Electromagnetic Pulse (HEMP), and Chemical, Biological, Radiological protection measures. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The facility should be compatible with applicable DoD, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria. All work shall be in accordance with RFP documents issued within this solicitation. The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within 900 calendar days after receipt of NTP. Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required. The magnitude of construction costs for this project is between $100,000,000 and $250,000,000.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Scott Dwyer
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W9128F23R0022- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationFeb 15, 2023
GBSD Integrated Command Center - FE Warren AFB
- Special NoticeMar 15, 2023
Draft RFP - GBSD Integrated Command Center, FE Warren AFB
- 13×SolicitationCurrentJun 13, 2023
GBSD Integrated Command Center - FE Warren AFB
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Project Labor Agreement Survey - Construction of Base Operations and Mobility Center at Offutt AFB, NE. | 78% | Special Notice | 04/10/2026 |
Login at https://piee.eb.mil and search for 'W912HN26R3101' to obtain more details.* | 75% | Solicitation | 07/31/2026 |
The purpose of Block 14 (Description of Amendment/Modification): Amendment 0002 toSolicitation W912DY26RA136 (FY26 Luke AFB Dorm Building 635 Renovation) is to incorporatethe following changes:1) Extend the proposal due date from 08 September 2026 to 10 September 2026 at 2PM CDT.Incorporate the following documents:2) Attachment 1: SOW Revision, dated 02 September 20263) Attachment 12: Amended DIV 01Specifications, dated 27 August 20263) Attachment 17: Appendix 16 - Bldg. 635 Concept Floor Plan4) Government Response to Additional Questions.All other terms and conditions of the original solicitation remain unchanged. The Purpose of this Amendment 0003 is to provide submission requirements within Section L. Proposal due date remains unchanged at 10 September 2026, 1400 CDT. | 74% | Solicitation | 09/10/2026 |
Sources Sought Notice/RFI for W912HP27RA010, Emergency Operations Center, Savannah River Site, SC. | 72% | Market Research | 11/20/2026 |
***ADDRESS HAS BEEN UPDATED in the LOCATION/LOGISTICS SECTION*** The U.S. Army Corps of Engineers (USACE) Louisville District is issuing this special notice to announce an Industry Day for upcoming construction requirement for Construction of a 300-member Army Reserve Center (ARC) at Defense Supply Center, Richmond, VA. The Louisville District is considering Construction Manager at Risk (CMAR) under 10 USC §2808a Other Transaction Authority for this requirement. This notice is for informational and planning purposes to allow interested parties to prepare for and provide feedback prior to the official Request for Qualifications (RFQ) release. INDUSTRY DAYS USACE intends to conduct an Industry Day on 19 November 2026 at 0900 Eastern Time to provide an overview of the project, potential acquisition strategy, and anticipated requirements. This event will provide interested parties with an opportunity to gain additional insight into the project and potential Construction Manager at Risk (CMAR) approach under an Other Transaction (OT) framework, ask questions, and provide input in advance of the official RFQ release. General questions from industry participants will be permitted during the Industry Day; however, all discussions and responses provided during the event are considered unofficial and for informational purposes only. Statements made during the Industry Day do not constitute commitment, authorization, or binding guidance related to the future RFQ. Official Questions and Answers (Q&A) will be accepted and addressed following the release of the RFQ. Contractors and subcontractors interested in participating are requested to submit their Name, Company Name and contact information (email and phone) to the USACE Contracting Specialist no later than 1600 on 17 November 2026. Please use the information below to request Installation/Base access: Step 1: Badge Requests: To obtain pass/badge for one day or more, the contractor shall complete DBIDS pre-registration online using the following link DBIDS Pre-Enrollment or at https://dbids-global-enroll.dmdc.mil/preenrollui/#/landing-page. Once pre-registration has been complete, the visitor/contractor shall record and send the QR code/alpha-numeric code as a PDF/screenshot to the COR/PM via email (if multiple people are visiting or being vetted, the contractor shall compile all QR/alpha-numeric codes into a single email) at least 5 business days prior to visit/start date. The contractor shall include requested dates, times and names of personnel in the email. Failure to provide all the above information may lead to delays in requests being processed which could result in missed site visits, meetings etc. The COR/PM will notify the contractor upon their approval or denial. If approved, the contractor will have 30 days to pick up their visitor pass or project badge. When picking up the project badge the contractor is required to present their QR or alphanumeric code along with a valid form of ID. When filling out the QR code form, for the Service Site - select All. State – Virginia. Filter – Defense Logistics Agency Richmond. Note, a valid DOD ID card (Retired military, CAC etc.) is NOT permitted to be used to enter DCSR for commercial purposes. Step 2: Send a copy of their QR codes to Steven.Hall@DLA.MIL and he can forward them to security for vetting. Usually security will get back within a day or two of the submittal and let me know if they’ve been approved or not and then they are able to come and pick up a badge at the pass office. LOCATION/LOGISTICS Industry Day Presentation Location: 6090 Strathmore Road (Bldg 70), North Chesterfield, VA 23237 (Red, brick building with a large chimney right past the visitors center when you enter the gate) NOTE: Onsite parking space may be limited, overflow parking is available in the vicinity. PROJECT OVERVIEW Project Title: Construction of Army Reserve Center (ARC) Location: Richmond, Virginia Agency: U.S. Army Corps of Engineers, Louisville District NAICS Code: 236220 PROJECT DESCRIPTION Primary facilities include a 56,500 SF Army Reserve Center and 1200 SF Unheated Storage Building. Facilities will be designed in accordance with the Army Reserve Design Guide. Supporting facilities include land clearing, general site improvements, lighting, walks, signage, curbs and gutters, storm drainage, paving, information systems, and utility connections. Sustainability/Energy and cybersecurity measures are included. All fixtures, furnishings, and equipment will be provided. Antiterrorism force protection and physical security measures will be incorporated into the design including minimum standoff distances from roads, parking areas and vehicle unloading areas. Access for individuals with disabilities will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria 1-200-02 including energy efficiencies, building envelope and integrated building systems performance. The project contains options such as: Bona fide need collateral equipment. The Contract Duration is estimated at 790 calendar days from Notice to Proceed on Construction Award. ACQUISITION STRATEGY – PRE-AWARD USACE, Louisville District plans to use a streamlined competitive selection process: Step 1 – White Papers/Qualification Statements: Interested parties will submit a Statement of Qualifications (max # of pages to be defined in formal RFQ. Following evaluation of the qualification packages, the Government intends to down-select a target of three (3) highest qualified firms to proceed to Step 2. Step 2 – Pitch Presentations: Down-selected firms will participate in live pitch meetings. One company will be selected as the Construction Manager for negotiation and award of Agreement 1 for preconstruction services. The Government intends to negotiate a Guaranteed Maximum Price (GMP) for construction of the ARC, which will be added as a bilateral modification at a later date. ACQUISITION STRATEGY – AWARD The agreement would be awarded to the most qualified Construction Manager at Risk (CMAR) to provide preconstruction services and construction. Phase 1 of the CMAR agreement would include pre-construction services. The selected CMAR would act as an expert consultant to the Government, collaborating directly with USACE and the third-party Designer of Record during active design progression. The Government’s intent is to award the Phase I Agreement for Preconstruction Services prior to the 95% design review meeting. Phase 2 of the agreement would include scope for all construction activities necessary to complete the project. The agreement will be Firm-Fixed-Price (FFP). All interested parties should monitor the official solicitation announcement, which will provide complete details and submission instructions. Draft documents may be provided at a future date for feedback and informational purposes only and are subject to change upon issuance of the formal Project RFQ. VIRTUAL PARTICIPATION OPPORTUNITY For those who are unable to attend the Industry Day event in person, the Louisville District plans to stream the event through Microsoft Teams. The details related to the MS Teams event are provided below: Microsoft Teams Meeting Join: https://dod.teams.microsoft.us/meet/993202545806?p=OoGJrDe3gE2XSV5cjy Meeting ID: 993 202 545 806 Passcode: aR7VH6d9 | 72% | Special Notice | 11/16/2026 |
Additional Details
Solicitation Number
W9128F23R0022
Archive Date
Mar 30, 2024
Office Address
OMAHA, NE, 68102-4901