GovChime
Notice ID: 9969f97ed75047ffad653fb69f921666SolicitationArchived

Fort Peck PH 1 Surge Tank Roof Replacement

Archived on August 6, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM CDT
Posted
July 22, 2025
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
238160: Roofing Contractors
Agency
Department of WarDepartment of the Army

Notice details

Office
W071 ENDIST OMAHA
Place of performance
Nashua, 59248
Last updated
Nov 11, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W9128F25BA002
Notice ID
9969f97ed75047ffad653fb69f921666

Description

BID ABSTRACT HAS BEEN UPLOADED INTO THE ATTACHMENT SECTION. ========================================================= AMENDMENT 0003 FOR ACCEPTABLE BIDS IN STEP ONE THAT ARE TO STEP - TWO PRICING ARE AS FOLLOWED BELOW ONLY: 1. AOD RBT ROOFING JV; 2. A-VET ROOFING; 3. BLUE FROG ROOFING LIMITED; 4. TRADESMEN GROUP, LLC.; 5. TRI COAST CONSTRUCTION THE SPECIFICATION AND DRAWINGS ARE 100% COMPLETE IN THE ATTACHMENT SECTION AND AMENDMENT 0003 HAS BEEN INCLUDED IN THE ATTACHMENT SECTION. UPON SUBMITTING STEP-2 PRICING, ACKNOWLEDGE ALL AMENDMENT FROM STEP-1 AND STEP-2 WITH YOUR FINAL OFFER. =========================================================== AMENDMENT 0002 PLUS AMENDMENT NARRATIVE, AM0002 01 12 00 FP PH1 SURGE TANK SPECS, AND AM0002 W9128F25BA002 4 OF 4 FP PH1 SURGE TANK REPAIR REFERENCE DRAWINGS ARE POSTED IN THE ATTACHMENT SECTION OF THIS SOLICITATION. ACKNOWLEDGEMENT OF ALL AMENDMENTS MUST BE PROVIDED WHEN SENDING IN STEP ONE AND STEP TWO OF THE OFFER. =========================================================== AMENDMENT 0002 TO EXTEND THE SOLICITATION DUE DATE FROM 5 JUNE 2025 12 JUNE 2025 WILL BE POSTED TOMORROW MORNING. =========================================================== AMENDMENT 0001 TO UPDATE THE 2100 INSTRUCTIONS. PLEASE REVIEW AND ACKNOWLEDGE THE AMENDMENT AND PROVIDE WHEN SENDING IN THE STEP-ONE TECHNCIAL APPROACH. =========================================================== SITE VISIT SIGN IN SHEET POSTED. ============================================================ This SOLICITATION is for W9128F25BA002. The U.S. Army Corps of Engineers, Omaha District intends to issue a Two-Step IFB solicitation for Fort Peck PH 1 Surge Tank Roof Replacement . The solicitation will close on or about 5 June 2024 by 2:00 PM CT. Step-One will be for the Technical only. NO pricing information will be provided during the Step-One process. DESCRIPTION OF WORK: The Surge Tank roof of the Ft. Peck Powerhouse, constructed in the 1940s, requires restoration to its original design in compliance with Montana State Historical Preservation Office (SHPO) regulations. The project involves the complete removal of existing roofing layers, including felt and Ludowici Provincial clay tile shingles, and the replacement with new Ludowici tiles that match the original materials to ensure historical accuracy. The roof, situated 272.48 feet above grade with an 8:12 slope and spanning 40 feet in diameter (2,500 square feet), currently features original clay tiles, 15-pound asphalt-impregnated waterproof felt with coal-tar pitch, and 2 " nailable precast concrete roof slabs secured with copper nails. The restoration will replace the clay tiles, copper flashings, and potentially the asphaltic waterproofing, while preserving the structural integrity of the precast concrete panels and maintaining the historical character of the Ft. Peck Dam. Comprehensive documentation will be kept throughout the project to track all aspects of the restoration and ensure adherence to historical preservation standards. Site Visit: A Site Visit will be scheduled and additional information regarding the site visit will be provided in the solicitation. Site Visit Date, Time and location is listed under FAR 52.236-27. Please respond to Mr. Zachary Watts your intent to attend the site visit. MAGNITUDE OF CONSTRUCTION: The estimated magnitude of construction for this project is between $1,000,000 and $5,000,000. Place of Performance: Fort Peck Dam, Valley County, Montana Contracting Office Address: USACE Omaha District 1616 Capital Ave, Omaha, NE 68102-4901 Point Of Contact: All questions regarding this pre-solicitation should be made to the Contract Specialist, Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database (https://sam.gov) exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov. Registration is required to access solicitation documents. SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendment current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update. Lynne Reed, who can be reached by email: lynne.d.reed@usace.army.mil.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (15)

  • FP Surge Tank Roof Repair Abstract.pdf

    136 KBAdded in Solicitation version 11Posted
    Download
  • Solicitation Amendment W9128F25BA0020002 SF 30.pdf

    3.3 MBAdded in Solicitation version 9Posted
    Download
  • AM0002 W9128F25BA002Narrative.pdf

    96 KBAdded in Solicitation version 9Posted
    Download
  • AM0002 - 01 12 00 W9128F25BA002 FP PH1 Surge Tank Specs.pdf

    595 KBAdded in Solicitation version 9Posted
    Download
  • AM0002 - W9128F25BA002 4 of 4 FP PH1 Surge Tank Repair Reference Drawings.pdf

    1.2 MBAdded in Solicitation version 9Posted
    Download
  • Solicitation Amendment W9128F25BA0020001 SF 30.pdf

    3.3 MBAdded in Solicitation version 4Posted
    Download
  • SITE_VISIT_ATTENDEE_LIST.pdf

    24 KBAdded in Solicitation version 3Posted
    Download
  • Solicitation STEP 1 - W9128F25BA002.pdf

    5.7 MBAdded in Solicitation version 2Posted
    Download
  • Attachment A - Past Performance Questionnaire.pdf

    106 KBAdded in Solicitation version 2Posted
    Download
  • Attachment B - MT20250057 March 14_2025.pdf

    80 KBAdded in Solicitation version 2Posted
    Download
  • Attachment C - Antiterrorism - AT-OPSEC Form 6055.pdf

    103 KBAdded in Solicitation version 2Posted
    Download
  • Attachment D - DRAFT - Bid Schedule-FP PH1 Surge Tank Roof .pdf

    591 KBAdded in Solicitation version 2Posted
    Download
  • Attachment E - FP PH1 Roof Repair STEP 1 Specs.pdf

    1.7 MBAdded in Solicitation version 2Posted
    Download
  • Attachment F - FP PH1 Surge Tank Roof STEP 1 Drawings.pdf

    11 MBAdded in Solicitation version 2Posted
    Download
  • Attachment G - FP PH1 Surge Tank Roof STEP 1 Drawing-2.pdf

    1.3 MBAdded in Solicitation version 2Posted
    Download

Lifecycle

  1. 7
    Version 7PresolicitationArchived

    Fort Peck PH 1 Surge Tank Roof Replacement

    Notice 28a825fd9db5487993ff656594a49053 on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Type changed from Presolicitation to Solicitation

    Fort Peck PH 1 Surge Tank Roof Replacement

    Notice ae772678f52c448fbb89a6832b10c8b3 on SAM.gov

  3. 3
    Version 3SolicitationArchived

    Fort Peck PH 1 Surge Tank Roof Replacement

    Notice 912e5114f4f94648b39324e538278440 on SAM.gov

  4. 4
    Version 4SolicitationArchived

    Fort Peck PH 1 Surge Tank Roof Replacement

    Notice 52a50974e992444a8a7d6291c76a009e on SAM.gov

  5. 5
    Version 5SolicitationArchived

    Fort Peck PH 1 Surge Tank Roof Replacement

    Notice 8f44e8ac11454c74b0565703dc7002df on SAM.gov

  6. 9
    Version 9SolicitationArchived

    Fort Peck PH 1 Surge Tank Roof Replacement

    Notice 62f44853ac154f498f60009eef550387 on SAM.gov

  7. 11
    Version 11SolicitationArchivedCurrent

    Fort Peck PH 1 Surge Tank Roof Replacement

    Notice 9969f97ed75047ffad653fb69f921666 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W9128F25BA002

Archive Date

Aug 6, 2025