GovChime
Notice ID: d11db8e7698947d0a56801bec43d5474Sources Sought

Mather Fueling System Repairs

Archived on May 6, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−06:00
Posted
December 18, 2025
Notice type
Sources Sought
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237120: Oil and Gas Pipeline and Related Structures Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTHWESTERN.ENDIST OMAHA.W071 ENDIST OMAHA
Place of performance
Mather, CA, 95655
PSC
Y1GC: CONSTRUCTION OF FUEL STORAGE BUILDINGS
Last updated
Aug 21, 2026

Identifiers

Solicitation number
W9128F26RA070
Notice ID
d11db8e7698947d0a56801bec43d5474

Description

This project involves modifying a 12,000-gallon jet fuel (F-24) horizontal aboveground storage tank and the surrounding fueling area. The tank work includes installing a sampling/gauging hatch on a tank manway, installing a clock type mechanical gauge on another manway, recoating the exterior of the tank, replacing collision barriers, adding a catwalk that extends the entirety of the tank, and replacing the audible and visual alarms. The remote containment basin drainage pipe shall be repaired and sloped positively to the drain inlet/manhole direction. The asphalt near the fueling facility shall be replaced to allow better storm water drainage. The refueler parking concrete shall also be replaced. The dispenser fuel monitor shall be replaced by a non-coalescing filter and a hand pumped water draw off system shall be installed as well. Near the truck offload area, some asphalt is getting replaced with concrete to prevent the degradation of the asphalt when fuel is spilled. The POL building is getting replaced in kind at the same location. The ATG system is getting upgraded from a Veeder Root TLS-350 Plus to a Veeder Root TLS-450 Plus. The generator located inside the compartmentalized unit is being moved outside.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W9128F26RA070
  1. Market Research

Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)

  1. Market ResearchCurrentDec 18, 2025

    Mather Fueling System Repairs

    Notice d11db8e7698947d0a56801bec43d5474 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

W9128F26RA070

Archive Date

May 6, 2026

Office Address

OMAHA, NE, 68102-4901