Notice ID: 495856a3973e46f5b17c667fb3191ad0Sources SoughtArchived
Big Bend 230kV Tie-Line Switch Replacement
Archived on October 19, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM CDT
- Posted
- September 14, 2026
- Notice type
- Sources Sought
- NAICS
- 237130: Power and Communication Line and Related Structures Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTHWESTERN.ENDIST OMAHA.W071 ENDIST OMAHA
- Place of performance
- Big Bend Dam PowerhouseSD-47, 33573 N. Shore RoadFort Thompson, SD 57339, 57339
- PSC
- Z2MD: REPAIR OR ALTERATION OF EPG FACILITIES - HYDRO
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W9128F26SC003
- Notice ID
- 495856a3973e46f5b17c667fb3191ad0
Description
The U.S. Army Corps of Engineers (USACE) Omaha District intends to determine the extend of capable small businesses and other than small business firms that have the availability in providing the requirement described below. USACE is considering issue a Total Small Business Set-Aside Request for Proposal that will result in one (1) Firm Fixed Priced contract for the 230 kV Tie-Line Switch Replacement at Big Bend Powerhouse, Fort Thompson, SD. The North American Industry Classification System (NAICS) code is 237130, Power and Communication Line and Related Structures Construction. Estimated magnitude of construction is between $1,000,000 and $5,000,000. The general scope of work is to replace the disconnect switches connecting the Big Bend Power Plant to two (2) 230kV transmission tie lines. This equipment is located on top of the powerhouse structure and on the tailrace side of the dam next to the 230kV generator step-up transformers. Existing switch ratings are 242kV with a 900kV BIL; Ampacities range from 1,200A to 2,000A. The replacement scope is five (5) motor operated circuit switchers, two (2) load rated operated disconnects, six (6) grounding switches, and the associated equipment needed to place the 230kV switch connection back into service. Please respond to all information requested in this notice no later than 05 October 2026 at 2pm Central. Please include the Sources Sought Identification Number in the subject line of the email submission and send to Brianna.N.Wohlers@usace.army.mil. Please provide any comments or identify any concerns your company has regarding the planned solicitation. Note that the Government will not be responding to inquiries about the proposed solicitation at this time. Your responses and comments will be used by Government personnel to assess the viability and scope of the proposed solicitation and assist market research efforts, and will be kept in strictest confidence. Telephone inquiries will not be accepted.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Links (4)
- PIEE Solicitation Module Link for W9128F26SC003piee.eb.milPosted
- Web Based Training for the PIEE Solicitation Modulepieetraining.eb.milPosted
- Registration Instructions for the PIEE Solicitation Modulewww.acq.osd.milPosted
- Department of Defense Procurement Toolboxdodprocurementtoolbox.comPosted
Lifecycle
- 3Version 3Sources SoughtArchivedCurrent
Big Bend 230kV Tie-Line Switch Replacement
Similar Opportunities
Additional Details
Solicitation Number
W9128F26SC003
Archive Date
Oct 19, 2026
Office Address
OMAHA, NE, 68102-4901