GovChime
Notice ID: d264028dd18b40209c9bc4530bf17f29Solicitation

W912BU23B0013 – Beach Nourishment of Oakwood Beach

Archived on December 31, 2023. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−04:00
Posted
September 22, 2023
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W2SD ENDIST PHILADELPHIA
Place of performance
Salem, NJ, 08079
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912BU23B0013
Notice ID
d264028dd18b40209c9bc4530bf17f29

Description

September 22, 2023- This update is to post the Bid Abstract as a result of the Bid opening conducted on September 18, 2023. Please reference the attachments section for a copy of the Bid Abstract. September 12, 2023 - Amendment 0002 is issued to provide answers for Request For Information (RFIs) submitted pertaining to the Oakwood project. This Amendment does NOT extend the bid opening date. August 29, 2023 - Amendment 0001 issued to Solicitation W912BU23B0013 for the Oakwood Beach Nourishment, located in Elsinboro Township, Salem County, New Jersey This project is to conduct pre-placement condition surveys and place up to 75,050 tons of sand at various locations along a 9,500-foot stretch of shoreline of the Delaware River, with the objective of restoring the beach to 50-feet wide at Elevation +6.0 feet NAVD88. The base contract includes placement of up to 57,750 tons of sand. Three (3) quantity options (3,300 tons, 5,750 tons and 8,250 tons) will be included to place more sand depending on need. Suitable sand, as specified, will be provided by the contractor and will be delivered and placed via truck. Dredging of sand from an offshore borrow area will not be allowed under this contract. The contract work also includes replacement of sand fence, clearing and grubbing of the existing beach, restoration of a parking area, and restoration and paving of local roads. This project is a Total Small Business Set-Aside. The NAICS Code for this project is 237990 Other Heavy and Civil Engineering Construction. The Magnitude of Construction for the project is between $1,000,000.00 and $5,000,000.00. Bonding will be required at the time of bid opening, by separate Bid Bonds; and after award but before Notice to Proceed, Performance and Payment Bonds will be required. The award will be made as a whole to one bidder in accordance with FAR Part 14 Sealed Bidding Procedures. Solicitation documents, plans, and specifications will only be available electronically via the System for Award Management (SAM) homepage located at https://www.sam.gov. No written or fax requested for the solicitation will be accepted. Information within this Solicitation notice is subject to change. It is the responsibility of interested bidders to monitor www.sam.gov for any solicitation amendments. The solicitation contains FAR provision 52.204-7; therefore a bidder must be registered in the SAM database. Construction Wage Rates application to this contract. Questions about this notice should be sent to Frederick Conway, at frederick.conway@usace.army.mil. Please review the solicitation instructions for the Request for Information (RFI) question submission process and deadline. The current RFI question deadline is 6 September, 2023.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912BU23B0013
  1. Market Research
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 3×
    Market ResearchApr 4, 2023

    W912BU23B0013-OakwoodBeachNourishment

    Notice 8000987abaa8413ba19ec3477b3813d0 on SAM.gov

  2. 4×
    SolicitationCurrentAug 18, 2023

    W912BU23B0013 – Beach Nourishment of Oakwood Beach

    Notice d264028dd18b40209c9bc4530bf17f29 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Sandbridge Beach Erosion and Hurricane Protection Beach Renourishment Project. Invitation for Bids. Amendment 0001: To provide instructions and specifications for the site visit. Amendment 0002: To provide revised plans, specifications, and bid schedule. Incorporates site visit log and survey data. Amendment 0003: To provide revised specifications, incorporate the Globalinx Map, and incorporate the ProjNet Bidder Inquiries. 10/06/2026: Publishing Bid Abstract
72%
Solicitation10/02/2026
Update - BID OPEING LOG IN INSTRUCTIONS for August 19, 2026 **AM03 - Updates Section 00 70 00 to include Clause 52.217-5. Nothing else is changed by way of this amendment* AM02 - Updates to Sections 00 07 00, 00 73 46, 01 57 19 and revised plan drawings. AM01 - Extends the due date to 19 Aug 2026, 1300 Local time. Additionally, the wage rates are also updated. Dredging of Los Angeles River Estuary and Port of Long Beach (Los Angeles County, CA) Construction services consisting of dredging (estimated quantities: 400,000 cubic yards) and disposal of material from the federal navigation channels of San Pedro Bay, specifically the Approach Channel at the Port of Long Beach (POLB) and the Los Angeles River Estuary (LARE) leading to the Queensway Marina. Disposal of the dredged material will be at an EPA approved ocean disposal site (LA-2). POLB design channel depths are 76 ft MLLW, and LARE channel depths are as deep as 25 ft MLLW. Estimated Construction magnitude is Between $5,000,000 and $10,000,000 NAICS Code 237990 Size Determination Size Determination $45.0M Period of Performance/Calendar Days- *Reference DIV00 Section 00 73 00. BE ADVISED. Files labeled with FIO are FOR INFORMATION ONLY. They are not provided as a material part of this acquisition, but are only provided for information only.
71%
Solicitation08/19/2026
The US Army Corps of Engineers, Enterprise Dredge Delivery Center (EDDC), is soliciting comments from the construction community addressing the potential use of Project Labor Agreements (PLA) for a large-scale construction project (exceeding $35 million) within the Cape May To Lower Township, New Jersey, Brigantine Inlet To Great Egg Harbor Inlet (Absecon Island), New Jersey, And Barnegat Inlet To Little Egg, Inlet (Long Beach Island), New Jersey area. This procurement is for Coastal Storm Risk Management (CSRM). Cape May to Lower Township, NJ (Navigation Mitigation – Beachfill): Work for the beachfill placement dredging will require a hopper and pipeline/mechanical dredge(s). The dredge(s) must have the capability to dredge material up to a depth of -40 ft NAVD88 and to transport the dredged sand to the designated areas approximately 2.6 miles away. The project for navigation mitigation (beach nourishment) is located on the Atlantic coast of New Jersey, extending from the Cape May Inlet southwest jetty to the 3rd Ave terminal groin in Cape May City. It includes the communities of the City of Cape May and Lower Township, and the US Coast Guard Training Center. The contract work will consist of a base bid to conduct pre-placement condition surveys and pump/place 600,000 cubic yards of sand from two borrow areas approximately 2.6 miles south of the Cape May Inlet jetties onto the beach at 2 locations: Area 1 (540,000 cu yds), the US Coast Guard Training Center and Area 2 (60,000 cu yds), Wilmington Ave. Options to place additional sand (100,000 cu yds) from the same borrow areas to achieve the full project design template at these same two beach locations will also be included. Sand must come from the offshore borrow areas. Trucking-in sand will not be permitted under this contract. All work under the contract must be completed no later than 1 March 2028. Brigantine Inlet to Great Egg Harbor Inlet (Absecon Island), NJ (CSRM – Beachfill): Contract work consists of a base bid to place approximately 1,500,000 cubic yards of beachfill, along the Atlantic Ocean coastline of Absecon Island, Atlantic County, New Jersey. The project area encompasses the municipalities of Atlantic City, Ventnor, Margate, and Longport. The contract work may also consist of separate options to place additional amounts of beachfill per option, if awarded, in locations within and outside of the Base bid areas. The project work for the Base Bid and Options, if awarded, also may include, in addition to beachfill: the construction or repair of pedestrian, vehicle, and ADA compliant dune crossovers; planting dune grass; installing sand fencing; the repair or extension of existing storm water outfalls and drainage structures; and the relocation or removal of various existing structures or fill to accommodate the beachfill and dunes. The beachfill material for this contract must come from the authorized borrow areas, which are shown on the contract drawings, located within and adjacent to the Absecon Inlet in the Atlantic Ocean, and a separate designated area located approximately 2 – 3 miles offshore of Absecon Island in the Atlantic Ocean. Barnegat Inlet to Little Egg, Inlet (Long Beach Island), NJ (CSRM – Beachfill): Contract work consists of a base bid to place approximately 2,000,000 cubic yards of beachfill to repair the dune and berm system along the Atlantic Ocean coastline of Long Beach Island, Ocean County, New Jersey. The project area encompasses the municipalities of Long Beach Township, Borough of Harvey Cedars, Borough of Surf City, Borough of Ship Bottom, and Borough of Beach Haven. The contract work may also consist of separate options to place additional amounts of beachfill per option, if awarded, in locations within and outside of the Base bid areas. The project work for the Base Bid and Options, if awarded, also may include, in addition to beachfill: the construction or repair of pedestrian, vehicle, and ADA compatible dune crossovers; planting dune grass; providing sand fencing; and the relocation or removal of various existing structures to accommodate the beachfill, dunes and other project features. The beachfill material for this contract must come from the authorized borrow areas located approximately 2-3 miles offshore of Long Beach Island in the Atlantic Ocean, and/or the Little Egg Inlet as designated on the contract drawings. The solicitation is expected to be available in FY2027. A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C 158(f). Federal Acquisition Regulation (FAR) Policy: (a) Project Labor Agreement (PLA) is a tool that agencies may use to promote economy and efficiency in Federal procurement. Pursuant to Executive Order 14063, agencies are encouraged to consider requiring the use of project labor agreements in connection with large-scale construction projects. (b) An agency may, if appropriate, require that every contractor and subcontractor engaged in construction on the project agree, for that project, to negotiate or become a party to a project labor agreement with one or more labor organizations if the agency decides that the use of project labor agreements will (1) Advance the Federal Government's interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and (2) Be consistent with law. Reference: Provision: 52.222-33 Notice of Requirement for Project Labor Agreement and Clause 52.222-34 Project Labor Agreement. (i) Requested are responses to the following: 1) Do you have knowledge that a PLA has been used in the local area on projects of this kind? If so, please provide supporting documentation. 2) Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? If so, please elaborate and provide supporting documentation where possible. 3) Are you aware of time sensitive issues/scheduling requirements that would affect the rate at which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible. 4) Identify specific reasons why or how you believe a PLA would advance the Federal Government’s interest in achieving economy and efficiency in Federal procurement. 5) Identify specific reasons why you do not believe a PLA would advance the Federal Government’s interest in achieving economy and efficiency in Federal procurement. 6) Identify any additional information you believe the Government should take into consideration regarding the use of a PLA on the referenced project. 7) Does your company intend to bid/propose on this project if a PLA requirement is included in the solicitation? Does your company intend to bid/propose on this project if a PLA requirement is not included in the solicitation? 8) What are the likely cost impacts, if any, to your bid/proposal price if a PLA requirement is included in the solicitation? Please provide as much detail as possible regarding any anticipated cost impacts (positive or negative) of the inclusion of a PLA requirement, including any information you can provide about the magnitude of the anticipated impact. (ii) The information gathered in this exercise should include the following information on projects completed in the last 2-5 years (or other timeframe, as appropriate): 1) Project Name and Location: 2) Detailed Project Description: 3) Initial Cost Estimate vs. Actual Final Cost: 4) Was the project completed on time? 5) Number of craft trades present on the project: 6) Was a PLA used? 7) Were there any challenges experienced during the project? Responses shall be submitted via email to Terri Adams at terri.m.adams@usace.army.mil and Ros Shoemaker at rosalind.m.shoemaker@usace.army.mil no later than 3:00 PM EDT on 02 November 2026. The email should be titled: New Jersey CSRM PLA Response This is NOT a Request for Proposal and does not constitute any commitment by the Government. Responses to this labor market survey will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitation announcements separately from responses to this survey.
69%
Market Research11/02/2026
The US Army Corps of Engineers, Enterprise Dredge Delivery Center (EDDC), is soliciting comments from the construction community addressing the potential use of Project Labor Agreements (PLA) for a large-scale construction project (exceeding $35 million) within the Bethany Beach and South Bethany Beach, DE (CSRM - Beachfill), Fenwick Island, DE (CSRM – Beachfill), and Rehoboth Beach & Dewey Beach, DE (CSRM – Beachfill): areas. This procurement is for Coastal Storm Risk Management (CSRM). Bethany Beach and South Bethany Beach, DE (CSRM - Beachfill): The work for the Bethany Beach and South Bethany Beach, CRSM projects will include periodic renourishment of the beach berm and dune to the original design template. It is estimated that approximately 532,000 cubic yards of sand would be required to restore Bethany Beach and South Bethany Beach to the original design template and approximately 165,000 CY of optional sand could be provided for advanced nourishment for the project. The base bid work would also include repair/replacement of dune grass, fencing and crossovers. Borrow Area E will be the source used for sand to restore this beach area and will require the use of a hopper or hydraulic cutterhead since Borrow Area E is located approximately two to three miles offshore of the Town of South Bethany. Fenwick Island, DE (CSRM – Beachfill): The work for the Fenwick Island, CRSM project will include periodic renourishment of the beach berm and dune to the original design template. It is estimated that approximately 207,000 cubic yards of sand would be required to restore Fenwick Island to the original design template and approximately 60,000 CY of optional sand could be provided for advanced nourishment for the project. The base bid work would also include repair/replacement of dune grass, fencing and crossovers. The Fenwick Island borrow area will be the source used for sand to restore this beach area and will require the use of a hopper or hydraulic cutterhead since the Fenwick Borrow Area is located approximately one to three miles offshore of the Town of Fenwick Island. Rehoboth Beach & Dewey Beach, DE (CSRM – Beachfill): The work for the Rehoboth Beach to Dewey Beach, CRSM projects will include periodic renourishment of the beach berm and dune to the original design template. It is estimated that approximately 390,000 cubic yards of sand would be required to restore Rehoboth Beach and Dewey Beach to the design template and approximately 120,000 CY of optional sand could be provided for advanced nourishment for the project. The base bid work would also include repair/replacement of dune grass, fencing and crossovers. Borrow Area B will be the source used for sand to restore this beach area and will require the use of a hopper dredge due to the four to six mile transit distance that must be made in the Atlantic Ocean to travel to and from the sand borrow area. The solicitation is expected to be available in FY2027. A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C 158(f). Federal Acquisition Regulation (FAR) Policy: (a) Project Labor Agreement (PLA) is a tool that agencies may use to promote economy and efficiency in Federal procurement. Pursuant to Executive Order 14063, agencies are encouraged to consider requiring the use of project labor agreements in connection with large-scale construction projects. (b) An agency may, if appropriate, require that every contractor and subcontractor engaged in construction on the project agree, for that project, to negotiate or become a party to a project labor agreement with one or more labor organizations if the agency decides that the use of project labor agreements will (1) Advance the Federal Government's interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and (2) Be consistent with law. Reference: Provision: 52.222-33 Notice of Requirement for Project Labor Agreement and Clause 52.222-34 Project Labor Agreement. (i) Requested are responses to the following: 1) Do you have knowledge that a PLA has been used in the local area on projects of this kind? If so, please provide supporting documentation. 2) Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? If so, please elaborate and provide supporting documentation where possible. 3) Are you aware of time sensitive issues/scheduling requirements that would affect the rate at which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible. 4) Identify specific reasons why or how you believe a PLA would advance the Federal Government’s interest in achieving economy and efficiency in Federal procurement. 5) Identify specific reasons why you do not believe a PLA would advance the Federal Government’s interest in achieving economy and efficiency in Federal procurement. 6) Identify any additional information you believe the Government should take into consideration regarding the use of a PLA on the referenced project. 7) Does your company intend to bid/propose on this project if a PLA requirement is included in the solicitation? Does your company intend to bid/propose on this project if a PLA requirement is not included in the solicitation? 8) What are the likely cost impacts, if any, to your bid/proposal price if a PLA requirement is included in the solicitation? Please provide as much detail as possible regarding any anticipated cost impacts (positive or negative) of the inclusion of a PLA requirement, including any information you can provide about the magnitude of the anticipated impact. (ii) The information gathered in this exercise should include the following information on projects completed in the last 2-5 years (or other timeframe, as appropriate): 1) Project Name and Location 2) Detailed Project Description 3) Initial Cost Estimate vs. Actual Final Cost 4) Was the project completed on time? 5) Number of craft trades present on the project 6) Was a PLA used? 7) Were there any challenges experienced during the project? Responses shall be submitted via email to Terri Adams at terri.m.adams@usace.army.mil and Ros Shoemaker at rosalind.m.shoemaker@usace.army.mil no later than 3:00 PM EDT on 02 November 2026. The email should be titled: Delaware CSRM PLA Response This is NOT a Request for Proposal and does not constitute any commitment by the Government. Responses to this labor market survey will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitation announcements separately from responses to this survey.
68%
Market Research11/02/2026
****Related Prior Solicitation Number W911XK26RA012 and W911XK27BA002**** The U.S. Army Corps of Engineers (USACE) Detroit District is seeking contractors with the capability to provide environmental (mechanical) dredging and placement of contaminated sediment construction services in the Monguagon Creek Upper Trenton Channel (MCUTC) located in Riverview, Michigan. The project consist of work associated with the environmental maintenance dredging of the Monguagon Creek Upper Trenton Channel located in Riverview, Michigan. There are no options included with the solicitation. The channel is situated just south of Bridge Road and the Grosse Ile Toll Bridge. The primary goal of the project is to remove contaminated sediment from Sediment Management Area 1 (maximum 4 feet depth) and Area 2 (maxi-mum 25 feet depth). Approximately 28,100 cubic yards of material is planned to be re-moved using mechanical dredging means with transport and placement of the contaminated dredged material into Cell 5 of the Pointe Mouillee Confined Disposal Facility (CDF).
67%
Solicitation12/10/2026

Additional Details

Solicitation Number

W912BU23B0013

Archive Date

Dec 31, 2023

Office Address

PHILADELPHIA, PA, 19103-2029