GovChime
Notice ID: 01b5ef6bb3be44d9827cfcfe649a523eSpecial Notice

Industry Day - Delaware Bayshore, Beneficial Use of Dredged Material

Responses closed . Full description on SAM.gov.

Overview

Response deadline
5:00 PM EDT
Posted
August 13, 2026
Notice type
Special Notice
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTH ATLANTIC.ENDIST PHILADELPHIA.W2SD ENDIST PHILADELPHIA
Place of performance
Delaware
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W912BU26BA027
Notice ID
01b5ef6bb3be44d9827cfcfe649a523e

Description

Special Announcement - Industry Day 2026 - Delaware River, Philadelphia to Sea Beneficial Use of Dredged Material The U.S. Army Corps of Engineers Philadelphia District would like to invite dredging industry contractors to Industry Day 2026 for the Delaware River, Philadelphia to Sea Beneficial Use of Dredged Material Project. Project Authorization: The Delaware River, Philadelphia to the Sea deep draft navigation project was originally authorized in House Document (HD) 61-733 as modified by HD 71-304, River and Harbors Committee Document 73-5, Senate Document 75-159, HD 76-580, HD 77-340, HD 83-358 and HD 85-135, and provides for a 45 FEET deep Federal channel in the Delaware River, from the entrance of Delaware Bay to the Ben Franklin Bridge in Philadelphia. In order to meet the goals of the Delaware River, Philadelphia to Sea Beneficial Use of Dredged Material Project (Delaware Bayshore), the dredged sand would be beneficially used as beach nourishment along two or more of the following Delaware Bayshore towns of Pickering Beach, Kitts Hummock, Bowers Beach, and Slaughter Beach IAW Section 401 of the Water Resources Development Act (WRDA) 2020 and as generally described in the Chiefs Report dated March 2020 and approved by the chief of Engineers on 6 March 2020. Federal funds for the DPS Project were provided in the Consolidated Appropriations Act of 2024 to initiate design and construction of the Project under Section 204(d) of WRDA 1992 as authorized by Section 8327 of WRDA 2022. This proposed project is intended to be done in conjunction with routine maintenance dredging between January of 2027 and May of 2028, subject to the availability of funds to advertise and award a dredging contract before the end of Fiscal Year (FY) 2027. The event will be held 15 September, 2026 at 10:00 am at the Slaughter Beach, DE Firehouse located at 359 Bay Ave, Milford DE 19963. The purpose and focus of the event will be to seek dredging industry input and their questions regarding best practices for the technical execution of the placement of sandy dredged material from the Brandywine Range of the Delaware River, Philadelphia to Sea Deep Draft Navigation Project main channel onto 2 or more of the Delaware Bayshore communities indicated above. Material in the channel has been characterized as predominately sand, based on the historic vibracore sampling and testing to a depth of -50 feet MLLW, and past dredging events to at least -45 feet MLLW depths. Work is in a dynamic coastal environment with shallow water extending for several miles from these communities out into the Delaware Bay. The meeting will allow for attendees to have the opportunity to ask questions and provide feedback or concerns. All interested attendees must pre-register by sending an e-mail to Contract Specialist Eric Leach at Eric.A.Leach@usace.army.mil no later than September 7, 2025. Registration must include name, company, daytime telephone number, e-mail address, and your relation to the marine construction industry as reason for attendance. You are requested to provide a count of how many people (from each registered Contractor) will be in attendance. Telephone requests will not be accepted. This is a non-fee event. This announcement is not a contract solicitation, request for proposal of any sort, a promise to issue any future contract, a forum to discuss upcoming work (other than for the Delaware River, Philadelphia to Sea Beneficial Use of Dredged Material Project), or a commitment to offer work of any kind on the part of the Government. Contracting Office Address: US Army Engineer District, Philadelphia, Attn: CECT-NAP, 1650 Arch Street, Philadelphia, PA 19103 SEE THE ATTACHMENTS SECTION FOR DRAFT SPECIFICATIONS AND DRAFT DRAWINGS.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Lifecycle

  1. 1
    Version 1Special NoticeCurrent

    Industry Day - Delaware Bayshore, Beneficial Use of Dredged Material

    Notice 01b5ef6bb3be44d9827cfcfe649a523e on SAM.gov

Other notices for this solicitation

  1. Market ResearchRelated noticeMay 7, 2026

    Delaware Bayshore, Beneficial Use of Dredged Material

    Notice 657b20653f834defa4eae0daee0d1f3a on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This announcement constitutes a Special Notice. This announcement seeks information from industry and will only be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SPECIAL NOTICE. Respondents will not be notified of the results of the evaluation. This is a SAVE-THE-DATE special notice for an industry day event on 18 November 2026 at 9:00AM EST. All interested Offerors are required to access SAM.gov for future updates. Please view registration information and details below. The presentation slides and list of attendees will be made available and posted to the subject special notice on SAM.gov after the conclusion of the event. The U.S. Army Corps of Engineers, Jacksonville District will be holding an Industry Day event to gauge the interest, capabilities, and qualifications of various members of the Construction Community, to include Small Businesses, and to also provide information and obtain feedback from interested Offerors prior to issuance of the official solicitation. This requirement is for fiscal year (FY) 2028 award. NAICS Code 237990: Other Heavy and Civil Engineering Construction Small Business Standard: $37 million Magnitude of Construction: $100 - $500 million Project Title: Tampa Harbor Improvements Industry Day. Purpose: The purpose of this scheduled Industry Day is to provide the latest information regarding the future advertisement and award of Contract 1 for the Tampa Harbor Deepening Project. The scheduled event will include a detailed presentation by the Jacksonville District US Army Corps of Engineers, Tampa Harbor Project Delivery Team (PDT) followed by open Q&A and 1-1 meeting opportunities with contracts to ask more in-depth questions and get feedback as the design and permitting moves forward. Project Description: The project includes construction dredging to deepen and widen specified areas within the federal navigation channel of Tampa Harbor. The project is planned for six (6) contracts over an estimated 8–10-year period. The Scope of Work for this Industry Day will be focused on Contract 1. Contract 1 work includes deepening of Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel and Cut-D (HB) to a depth of 49 feet MLLW, deepening the Port Sutton Terminal Channel to a depth of 44 feet MLLW, and deepening the East Bay Channel Extensions 1 and 2 to a depth of 41 feet MLLW. The Contract 1 work also includes widening of Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel. All areas of deepening and widening will incorporate +1 foot of allowable overdepth. All dredged material from the project will be disposed of in the East Bay Placement Area, DMMA 2-D and DMMA 3-D. Estimated quantities to be dredged are roughly 4.4 million cubic yards. Link to the Tampa Harbor Improvements USACE website: https://www.saj.usace.army.mil/Tampa-Harbor/-30-/ Requests for Information: Industry is asked to consider the following questions and provide input at the Industry Day: 1. Company/Contractor name, address, point of contact, phone number and e-mail address. 2. Does the Contractor plan to submit a proposal for this contract? 3. Describe the proposed construction methods and sequencing and equipment needed to complete the project. At a minimum, address pre-dredging, side-casting of pre-dredging material, and placement into the East Bay Placement Area including constructing the containment perimeter and filling within the area. The contract will include geologic data of the dredge and placement areas as well as the geotechnical requirements for materials considered suitable for constructing the containment perimeter. The contractor will propose the dredging sequence to accomplish constructing the containment perimeter that meets required geotechnical specifications. Describe the factors considered in determining the dredging sequence, such as the material type, proposed equipment, proximity to the placement area, etc.? 4. Describe any constructability, stability, safety concerns with East Bay Placement Area. Describe additional equipment or methods required to place infill above water and/or above the proposed crest of the containment perimeter. Describe any concerns for drainage of the placement area. 5. Describe how filling the East Bay Placement Area will not result in material migrating out of the placement area and into the federal channel. At a minimum, address how existing soft material at the placement area will be contained when disturbed. 6. Will the proposed East Bay Placement Area construction methods require equipment to be located within the federal channel for extended periods of time acting as obstructions for vessel traffic, or obstruct Port Tampa Bay Berth 150? 7. For East Bay Placement Area, describe any temporal facilities, staging and laydown areas, and utilities that would be required or preferred in adjacent upland areas. 8. Dredging and placement of material will be conducted in a manner to minimize turbidity. Describe the turbidity control measures, such as turbidity curtains, that would be incorporated into the proposed construction methodology. If hydraulic placement of infill is proposed for the East Bay Placement Area, describe how affluent will be managed. 9. Based on prior dredging construction experience either in Tampa Bay or other locations in Florida, what are some of the challenges USACE could streamline to improve contract execution? 10. Describe any concerns with execution of the environmental species monitoring and reporting. Event Date: Wednesday, 18 November 2026 at 9:00 AM EST. Event Location: Port of Tampa – Cruise Terminal 6 1331 McKay Street Tampa, Florida 33602 *Parking available onsite For more information, please see the Industry Day Agenda copy under the Attachments. Contact Info: Manny Vianzon, Project Manager (904) 232-3292 Emmanuel.A.Vianzon@usace.army.mil If you cannot attend in person: Link Meeting: https://www.microsoft.com/EN-US/MICROSOFT-TEAMS/JOIN-A-MEETING Meeting ID: 993 212 869 457 Passcode: tG6Ff3Gt Join by phone: 604-262-2433 Phone conference ID: 972 118 411# NOTES: NO REIMBURSEMENT WILL BE MADE FOR ANY COST ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO SAID NOTICE, ATTENDANCE AT THE VIRTUAL INDUSTRY DAY EVENT OR ANY FOLLOW-UP INFORMATION SUBSEQUENTLY REQUESTED. You must be registered with the System for Award Management (SAM) in order to receive a Government contract award. To register, go to www.sam.gov. For additional information visit the website for the Federal Service Desk (www.FSD.gov) which supports SAM or contact them at 866-606-8220 for assistance.
87%
Special Notice11/18/2026
Description of Work: Contract work consists of a large-scale earthwork project to construct approximately 25,000 linear feet of earthen embankments at the Pedricktown North Dredged Material Placement Facility (DMPF) adjacent to the Delaware River in Salem County, NJ. Approximately 1,000,000 cubic yards of dredged materials must be moved from within the approximately 500-acre site, compacted in lifts and final graded to meet the lines and grades required. Significant experience and expertise with large scale earthwork projects and access to a significant amount of earthmoving equipment and labor will be required to complete all work within an 18-month period of performance. The soils that comprise the available dredged materials are predominately fine-grained in nature (i.e., contain silts and clays of low and high plasticity), with some sand and gravel in limited areas. As such, these soils are highly susceptible to changes in moisture content which may limit construction activities during periods of wet or freezing weather. Contractor must be able to deal with problems that include seepage of water into excavations, softening of exposed subgrade soils, loss of soil shear strength, etc. It is anticipated that the existing dredged material proposed to construct the dikes will require consistent and active moisture conditioning to achieve a moisture content near or at optimum to achieve the specified compaction requirements. Consequently, prudent earthwork techniques such as disking, stockpile management, aeration, promoting positive drainage, limiting construction traffic and allowing for drying days must be utilized to facilitate fill placement and compaction activities. It should be anticipated that protection of exposed excavation subgrades will need to be exercised to minimize disturbance. The contract documents will include all available date from the latest subsurface investigations and associated geotechnical laboratory testing. A licensed Geotechnical Engineer will be required for the evaluation of this data and assistance in preparation of bid documents as well as work plans that will be required of the successful bidder. The work will also require the installation of three steel sluice structures and associated 30-inch steel outfall pipes for site drainage. The sluice structures and pipes will be provided as Government Furnished Materials. Solicitation Number W912BU23R0008 will be issued on or about 27 June 2023 with a proposal due date occurring at least 30 days after the Solicitation. The award will be made based on the best overall (i.e., best value) proposal that is determined to be the most beneficial to the Government, with appropriate consideration given the four (4) evaluation factors: Technical Approach, Past Performance, Small Business Participation and Price. The period of performance will be 550 calendar days. Estimated cost range of the project is $10,000,000 to $25,000,000. Sources Sought: This is a Sources Sought Notice and is for information purposes only. THIS IS NOT A REQUEST FOR PROPOSALS, QUOTATIONS, OR BIDS. A Market Survey is being conducted to determine if there are adequate HUBZone, 8(a), Service Disabled Veteran Owned, and Small Business contractors for the following proposed work. The Army Corps of Engineers, Philadelphia District, is interested in awarding one (1) Firm Fixed Price Contract for Dike Raising Construction, Pedricktown North, Salem County, NJ. Performance and Payment Bonds will be required for 100% of contract award. The NAICS Code for this project is 237990 and the small business size standard is $45 Million. To be considered small for purposes of Government procurement, a firm must perform at least 40 percent of the volume dredged with its own equipment or equipment owned by another small dredging concern. Responses to this sources sought announcement will be used by the Government to make appropriate acquisition decisions. All interested HUBZone, 8(a), Service Disabled Veteran Owned, Small Business contractors should submit a narrative demonstrating their experience in the specified work, as well as, their technical capabilities. Please include size/classification of your firm, bonding capacity (single project and aggregate), details of similar projects, completion dates, references and contract amount. Narratives shall be no longer than FIVE (5) pages. Responses should be sent to Zaquette Everett at zaquette.everett@usace.army.mil on or before 22 April 2023 11:45 p.m. Eastern
86%
Market Research04/22/2023
The Purpose of Amendment 0001 to Solicitation W912BU26BA007 is as follows:a.) Provide answers to the RFIs submitted.b.) Update DFARS 252.236-7001 to include XYZ data. Additionally, revise Specification Section 3520 23, Appendix B41, W912BU26BA007-DWG_AM0001.pdf, and Plan Sheet C-401.c.) Add FAR 52.222-90 Addressing DEI Discrimination by Federal Contractors.d.) Add FAR 52.219-9 Small Business Subcontracting Plane.) Update FAR Provision 52.252-3, Alterations in Solicitation.PURPOSE: The U.S. Army Corps of Engineers, Philadelphia District, intends to award a firm fixed contract for Maintenance Dredging, Delaware River, Philadelphia to Trenton. DESCRIPTION: Base contract work consists of maintenance dredging of approximately 500,000 cubic yards of sediment within the Delaware River, Philadelphia to Trenton main navigation channel between Newbold Range (Station 124+700) and Cochran Range (Station 150+000). Work includes mechanical dredging with placement of the dredged material into the Biles Island Disposal Area in Falls Township, PA. Dredging will be required to a depth of 24? MLLW (Datum) plus 1? allowable overdepth. There will be an Option for dredging approximately 70,000 cubic yards of material from the Fairless Turning Basin with dredged material placement at the Money Island Disposal Area, in Falls Township, PA. Dredging in the Basin will be required to a depth of 41? MLLW (Datum) plus 1? allowable overdepth. The period of performance is 240 calendar days. All dredging must be completed by 15 March 2027 due to environmental restrictions. DISCLOSURE OF MAGNITUDE OF THE PROPOSED CONSTRUCTION PROJECT: $10,000,000 and $25,000,000. NAICS CODE AND SBA SIZE STANDARD: 237990, DREDGING AND SURFACE CLEANUP ACTIVITIES, Size Standard $37.0M. PERIOD OF PERFORMANCE: 240 Calendar Days from the Notice to Proceed (NTP).SYSTEM FOR AWARD MANAGEMENT (SAM): Bidders are required to be registered in the System for Award Management (SAM) database (https://sam.gov) and PIEE at the time a bid is submitted in order to comply with the annual representations and certifications requirements. Registration for PIEE is required as this is the only place bids shall be submitted. Bids must be submitted in PIEE Solicitation Module. ADDITIONAL INFOMRATION: Specific information pertaining to this procurement will be available in the solicitation. The solicitation documents will be posted on the SAM.gov website, https://sam.gov and PIEE Solicitation Module. It is and will continue to be the responsibility of all potential Bidders to monitor the SAM.gov website for any amendments, updates, responses to questions and answers, etc. as the Government will not be maintaining a mailing list.
82%
Solicitation05/22/2026
The U.S. Army Corps of Engineers (USACE), Philadelphia District has a requirement for the Maintenance Dredging, Delaware River, Philadelphia to Sea and Wilmington Harbor FY26 Project. Contract work consists of maintenance dredging of approximately 2.5 million cubic yards of sediment within the Delaware River, Philadelphia to Sea main navigation channel between Stations 0+000 and 515+000 and approximately 350,000 cubic yards within Wilmington Harbor, Christina River. Work includes hydraulic cutterhead dredging only south of Station 190+000 and mechanical or hydraulic cutterhead dredging north of Station 190+000 with placement of the dredged material into the Pedricktown, Delaware City, and/or Killcohook disposal areas. All dredging will be performed to the required depths indicated with 1 or 2-foot allowable overdepth. All dredging shall be performed as contour dredging. Before and after dredging surveys for measurement will be performed by the government. The period of performance will be 240 calendar days.***** AMENDMENT 0001 - 11 JUN 2026 - The purpose of Amendment 0001 to Solicitation W912BUBA006 is as follows: a) To revise Section 00 21 00 - Instructions; Instructions, Conditions and Notices to Bidders; 1.11 Prospective Bidders Questions and Requests for Information (RFI); RFIs due date from 08 JUL 2026 to 23 JUN 2026. b) To provide Request for Information (RFI) questions and responses. c) Update FAR 52.252-3, Alterations in Solicitation. ***** AMENDMENT 0002 - 29 JUN 2026 - The purpose of Amendment 0002 to Solicitation W912BUBA006 is as follows: a) To provide additional Request for Information (RFI) questions and responses. b) Update FAR 52.252-3, Alterations in Solicitation. *****
81%
Solicitation07/08/2026
Virtual Industry Day for FY27 USACE Enterprise Dredge Delivery Center National Small Business MATOC The Virtual Industry Day Meeting for the USACE Enterprise Dredge Delivery Center National Small Business MATOC will occur on 12 January 2027 from 1300ET to 16:00ET via Teams. All interested dredging companies are encouraged to attend. If you would like to provide comments or questions prior to the Industry day, please do so on wwww.projnet.org. All questions or comments are due by 04 January 2027 at 1100 ET. Solicitation Number: W912PM27RA007 Bidder Inquiry Key: PV63ES-IJ49PU National Small Business Multiple Award Task Order Contract (MATOC): The United States Army Corps of Engineers (USACE) executes construction contracts for regular, reoccurring, and emergency National Enterprise Dredging requirements at various coastal harbors, inland rivers, canals, and connecting channels throughout the United States. Individual projects are typically annual requirements and may utilize mechanical, hydraulic, or a combination of dredging equipment and techniques with activities to include but not limited to maintenance and new work dredging, dredged material placement, and other activities such as Confined Disposal Facility (CDF), Dredged Material Disposal Facility (DMDF), or upland placement site maintenance, groundskeeping, other earthwork at placement sites, surveying, or other work connected with dredging and placement requirements. Task orders issued under this MATOC will require the contractor to mobilize dredge plant and support vessels to the project location, perform dredging as shown on the respective plan(s), place dredged material—which may include beach nourishment, open-water placement, CDFs, DMDFs, beneficial use, or alternative placement strategies as indicated in individual task orders—, provide for any necessary environmental required protected species observers (PSOs) or environmental surveys, and demobilize once complete. The maximum ordering capacity for the 5-year ordering period of the MATOC and maximum task order amounts are TBD. Below are the draft source selection criteria proposed: FACTOR 1: Technical Capability a. Submission Requirements: Dredge Information: The offeror shall provide documentation for any dredges being proposed for use under this solicitation/contract, and any subsequent task orders. If the proposal does not include at least one of the identified dredges below, then Factor 1 will be rated “Unacceptable”. Proposed dredges must include a minimum of at least one of the following: Cutter Suction Dredge - employs a mechanical cutter to break up material which is then excavated hydraulically and transported to the placement site through a pipeline. Minimum Requirement: 10-inch discharge diameter or larger Mechanical Dredge - uses of some form of bucket to excavate and raise submerged material. Minimum Requirement: 5 cubic yard bucket or larger Offeror can submit more than one dredge(s) that meets the minimum requirements above in responding to this evaluation factor. Dredges that are still under construction or are in the process of undergoing major reconstruction will not be considered. The dredge documentation must include the following information: dredge type; certify that the dredge meets minimum requirements stated above; proof offeror owns the dredges submitted (leased dredges are not acceptable). FACTOR 2: Past Performance Submission Requirements: Offerors will be required to provide three (3) past performance examples of recent and relevant maintenance dredging projects for the type of dredge submitted under Factor 1 – Technical Capability, which demonstrate that they have experience accomplishing the following: dredging of Navigation Channels, Rivers, Harbors, Inland Waterways with depths ranging from 6 feet to 50 feet. The past performance examples must include dredging that has been performed within the last six (6) years from the date of the solicitation. In addition to submitted examples, the Government may review any other sources of information for evaluation of past performance. If the Offeror is proposing as a Joint Venture (JV), Partnership and/or Teaming Arrangement and past performance cannot be provided as such, each partner shall submit past performance information but shall not exceed the three (3) projects total for this factor. Note 1: NAA: The Offeror will be required to provide documentation related to EM 385-1-1 requirements such as Floating Service Naval Architecture Analysis (NAA) with either MATOC or Task Order proposal. 2. Note 2: The Offeror may be required to submit a letter of commitment with their proposal from a surety that confirms that the offeror's bonding capacity meets a specified minimum amount. Please RSVP no later than 9AM ET 11 January 2027 to both Ros Shoemaker and Elizabeth (Lisa) Trimble at Rosalind.m.shoemaker@usace.army.mil and Elizabeth.M.Trimble@usace.army.mil if you plan to attend the Industry Day. A Teams calendar invite will be sent out to all RSVP’s.
80%
Special Notice01/12/2027

Additional Details

Solicitation Number

W912BU26BA027

Archive Date

Aug 13, 2027

Office Address

PHILADELPHIA, PA, 19103-2029