TOBYHANNA ARMY DEPOT EMF RANGE EXPANSION
Archived on January 22, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM EST
- Posted
- December 23, 2025
- Notice type
- Sources Sought
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTH ATLANTIC.ENDIST PHILADELPHIA.W2SD ENDIST PHILADELPHIA
- Place of performance
- Tobyhanna, Pennsylvania, 18466
- Last updated
- Nov 4, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912BU26RAXXX
- Notice ID
- 9b1db8517fa34e2c9038d63b9e66c7b9
Description
SOURCES SOUGHT NOTICE
This is a SOURCES SOUGHT NOTICE for the purpose of obtaining market research only. NO PROPOSALS ARE BEING REQUESTED NOR ACCEPTED UNDER THIS SYNOPSIS. This is not a solicitation, offer, or active procurement, and no contract will be awarded from the notice. The U.S. Army Corps of Engineers, Philadelphia District, will use information obtained under this synopsis to develop an acquisition strategy to meet the requirements for the project described below.
Solicitation #: W912BU26RAXXX
Procurement Type: Sources Sought Notice
Project Title: TOBYHANNA ARMY DEPOT EMF RANGE EXPANSION
Classification Code: 23
NAICS Code: 237990 - "Other Heavy and Civil Engineering Construction"
Construction Magnitude: DFARS 236.204(ii) Between 25,000,000 and $100,000,000
Primary Point of Contact: Tiffany Chisholm, Contract Specialist Tiffany.Z.Chisholm@usace.army.mil | Phone: (215) 656-6761
Description:
This posting is intended to determine the availability and capability of potential Small Business, Women Owned Small Business (WOSB), Economically Disadvantaged Women Owned Small Business (EDWOSB), HUBZone, Service-Disabled Veteran Owned Small Business (SDVOSB),8(a) and Other socioeconomic categories per FAR Part 19, Small Business Programs for the project below. The Government anticipates a competitive method of procurement.
The Philadelphia District is issuing this Sources Sought Notice to determine if there is an adequate number of interested and qualified business firms capable of performing work described below.
This is not a solicitation and the items listed herein are subject to change or eliminated from the requirement. This survey is for market research purposes only. Only prospective contractors capable of performing this type of work should respond to this Sources Sought Notice.
Description of Proposed Work:
The project entails expansion of existing EMF Range facilities on Powder Smoke Ridge at Tobyhanna Army Depot. The major items of work to be performed are the following:
• Construct embankment from imported, compacted fill, supported in part by a Mechanically Stabilized Earth (MSE) wall, to provide the grades necessary for the new radome pad and other site features. The estimated imported fill quantity is approximately 400,000 cubic yards. Construct the radome foundation and support walls on an elevated concrete pad. The top elevation of the pad shall be 2135 feet above sea level. The concrete pad is a three-lobed irregular shape approximately 68,000 SF in area.
• Erect the Radome radar enclosure, approximately 110 feet in diameter, using government supplied materials. Construct two circular concrete expansion pads for the radome pads existing on-site. Construct two operational concrete test pads adjacent to the existing radome access road. Pad sizes are approximately 68,000 SF and 13,000 SF in area.
• Construct a 20 foot x 30 foot range (approximate size) control building adjacent to the new radome area. The building will contain workstations, storage for hard drives and removable media related to the radar units which will be stored while not in use, and a restroom. The building will be designed to allow for the storage of classified material. Construct an approximate 4,480 SF addition to Building 54.
• Construct a paved access road to connect the new radome pad with the existing radome access road. Construct a gravel improved, temporary access road along the fire break adjacent to Powder Smoke Ridge to facilitate truck access to the site for the delivery of fill materials needed to raise the radome to the required elevation, and other equipment and material access. Demolition of a metal test stand behind Building 54.
• Weather Station: Construct a weather station on Powder Smoke Ridge to provide weather calibration data to radar units on the ridge.
• Utility Work (includes but is not limited to): Connect the radome and range control building to the existing electrical and communications infrastructure on Powder Smoke Ridge. Construct a potable water line from Building 54 to provide water to the range control building. Construct sanitary holding tanks at the range control building and the Building 54 addition. Incidental work includes, but is not limited to, clearing/tree cutting, new and connections to existing utilities, site and building lighting misc. paving, pavement striping, sidewalks, building gutters, storm drainage facilities, soil and sediment erosion control features, topsoil and seeding, guide rail, fence replacement and miscellaneous site demolition.
Project Location: Tobyhanna, PA 18466
Estimated Duration of Work: 5 calendar years
Bonding Capacity: $50M to $100M
Sources Sought/Market Survey Responses Requested:
Interested Offerors can respond to this Sources Sought Synopsis to include the following information:
1. Offeror’s company name, address, home office immediate area, UEI, and Commercial and Government Entity (CAGE) Codes, and points of contact name, telephone numbers and e-mail addresses.
2. Business size/classification shall be indicated on the first page of the submission.
3. Interested parties must submit a Capability Statement, including evidence of relevant past performance and similar completed projects, to demonstrate their ability to execute the described work. The statement should address the following items to show the contractor’s capability:
- The contractor’s ability to manage, as prime contractor, the types and magnitude of tasking described in the project description above
- The contractor’s technical ability to perform at least 50% of the cost of the contract incurred for personnel with its own employees.
- The contractor’s capacity to conduct the requirements of the SOW. At minimum, 2 completed projects (costing a minimum of 50 million dollars) completed in the last 5 years to demonstrate capacity and technical ability.
- Contractor shall provide overview of these past projects completed and how much they self-performed.
Submission Instructions:
Sources Sought submission, EXCLUDING PLA information (see below required PLA information) shall be no more than 10 pages in length.
Interested parties who consider themselves qualified to perform the above-listed requirement are invited to submit a response to this Sources Sought Notice NLT 5:00PM EST, 07 January 2026. All responses under this Sources Sought Notice must be emailed to Tiffany Chisholm (tiffany.z.chisholm@usace.army.mil) referencing the sources sought number W912BU26RAXXX.
Telephone inquiries will not be accepted or acknowledged, and no feedback or evaluations will be provided to companies regarding their submissions. If you have any questions concerning this opportunity please contact: Tiffany Chisholm (tiffany.z.chisholm@usace.army.mil) and/or Cherita Williams (cherita.l.williams@usace.army.mil).
COLLECTION OF INFORMATION FOR THE DETERMINATION OF THE USE OF PROJECT LABOR AGREEMENT (PLAs)
Executive Order 14063, Use of Project Labor Agreements for Federal Construction Projects, issued 04 February 2022, requires the use of PLAs in connection with large-scale construction projects (defined as projects where the total estimated cost to the Federal Government of the construction contract is $35 million or more) to promote economy and efficiency in Federal procurement.
Attached below are a few questions for interested parties to provide a response in order for the Government to make a determination for the use or non-use of PLAs.
1. Do you have knowledge that a PLA has been used in the local area on projects of this kind? If so, please provide supporting documentation.
2. Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? If so, please elaborate and provide supporting documentation where possible.
3. Are you aware of time sensitive issues/scheduling requirements that would affect the rate at which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible.
4. Identify specific reasons why or how you believe a PLA would advance the Federal Government’s interest in achieving economy and efficiency in Federal procurement.
5. Identify specific reasons why you do not believe a PLA would advance the Federal Government’s interest in achieving economy and efficiency in Federal procurement.
6. Identify any additional information you believe the Government should take into consideration regarding the use of a PLA on the referenced project.
7. Does your company intend to bid/propose on this project if a PLA requirement is included in the solicitation? Does your company intend to bid/propose on this project if a PLA requirement is not included in the solicitation?
8. What are the likely cost impacts, if any, to your bid/proposal price if a PLA requirement is included in the solicitation? Please provide as much detail as possible regarding any anticipated cost impacts (positive or negative) of the inclusion of a PLA requirement, including any information you can provide about the magnitude of the anticipated impact.
(i) The information gathered in this exercise should include the following information on projects completed in the last 2-5 years (or other timeframe, as appropriate):
1) Project Name and Location
2) Detailed Project Description
3) Initial Cost Estimate vs. Actual Final Cost
4) Was the project completed on time?
5) Number of craft trades present on the project
6) Was a PLA used?
7) Were there any challenges experienced during the project?
_upCurrent Project Details: For the project under consideration, the Federal acquisition team can fill in the following table to detail the factors needed to consider when deciding whether an exception to PLA requirements may be requested:
Project Description
Estimated cost, duration, deadline, and complexity
Which trade or trades are expected to be employed on the projects?
Does the project involve specialized construction work that is available from only a limited number of contractors or subcontractors?
What market share does union labor have in the geographic area for this project or type of construction?
Does the local market contain the sufficient number of available skilled workers for this project? Are the other projects in the vicinity going to limit the pool of skill labor available for your project?
Has a project like this been done before in the local market?
Will the completion of the project require an extended period of time or have sensitive deadlines?
Is the need for the project is of such an unusual and compelling urgency that a project labor agreement would be impracticable? (See, e.g., FAR 6.302-2.)
Have PLAs been used on comparable projects undertaken by the public or private sector in this geographic region?
Have PLAs been used on this type of project in other regions?
Are there collective bargaining agreements (CBAs) that are likely to expire during the course of the project under consideration that might cause delays?
How do open shop and union wage rates influence prevailing wage rates in the local market and compare to Davis Bacon rates? What impact does unionization in the local market have on wages?
Could a PLA contribute to cost savings in any of the following ways:
Harmonization of shifts and holidays between the trades to cut labor costs?
Minimizing disruptions that may arise due expiration of CBA?
Availability of trained, registered apprentices, efficient for highly skilled workforce?
Allowing for changes in apprentice to journeyman ratio.
Serving as a management tool that ensures highly skilled workers from multiple trades are coordinated in the most efficient way.
Could a PLA minimize risk and contribute to greater efficiency in any of the following ways:
• Mechanisms to avoid delays
• Complying with labor standards, safety rules and EEO and OFCCP laws.
• Ensuring a steady supply of skilled labor in markets with low supply or high competition for workers.
Are there ways in which a PLA might increase costs on this particular project?
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Lifecycle
- 1Version 1Sources SoughtArchived
TOBYHANNA ARMY DEPOT EMF RANGE EXPANSION
- 3Version 3Sources SoughtArchivedCurrent
TOBYHANNA ARMY DEPOT EMF RANGE EXPANSION
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Houston Ship Channel (HSC) Expansion Channel Improvement Project (ECIP) 11, Package 9, Segment 4 Boggy Bayou to Sims Bayou located in Harris County, Texas | 62% | Solicitation | 12/01/2026 |
62% | Awarded | Open | |
This is a Presolicitation Notice only. This is not a Solicitation (Request for Quote). No purchase order will be awarded from this announcement. Any applicable attachments for this project (i.e., Drawings and Specifications) will be issued at the time of the Solicitation. This procurement is a 100% Total Small Business Set-Aside. All interested and capable small business offerors are encouraged to submit a quote. Project Description The Millvale LPP was constructed by U.S. Army Corps of Engineers (USACE) in 1980 under the authority of Section 205 of the Flood Control Act of 1948 as amended. The project consists of about 6,200 feet of channel improvement including concrete gravity retaining walls, concrete wall supports, anchored concrete toe blocks, concrete cap walls, stone-filled gabion mattresses, flap gates and access ramps. The LPP is an urban Flood Control Work (FCW), and it is not a multipurpose project. Heavy rains from 1-12 April 2024 caused flooding which damaged the Project within Girty’s Run, including bank erosion, shoaling, erosion of the improved channel, ruptured gabion baskets, washed-out concrete buttresses, and erosion of grouted riprap. Of particular concern are the washed-out buttresses which have migrated to the center of the improved channel, impeding streamflow. If the buttresses are not removed and stream bank improvements continue to deteriorate, there is a risk that debris will continue to accumulate and could ultimately damage the channel downstream of the impediment. To address these damages, Allegheny County requested rehabilitation assistance from USACE through the PL 84-99 program, which authorizes USACE to rehabilitate eligible Federal and non-Federal LPPs damaged or destroyed by floods. An agreement was signed on 6 August 2025 between the Borough of Millvale and USACE to complete the necessary repairs. Some of the major features of work are, but not limited to: Temporary Stream Diversion, Dewatering, and Environmental Controls Stream Flow Control: Design, furnish, operate, maintain, and remove a temporary stream diversion and bypass pumping system to perform all channel bottom and bank work in a dry, dewatered state. Effluent Filtration: Discharge from pumping systems must pass through approved sediment and debris control filtration before re-entering Girty's Run. E&S Controls: Install, inspect, and maintain erosion and sediment controls compliant with PADEP Publication 363-2134-008. The project is located along Girty’s Run and Boomer Run between Station 68+00 and Station 73+80, Allegheny County, Pennsylvania. The work is to be completed within 365 calendar days after written Notice to Proceed (NTP). The Anticipated Construction Cost is between $300,000.00 and $350,000.00. The contractor is responsible for all project submittals, including a Quality Control Plan, Accident Prevention Plan, and various shop drawings and product data for government approval. Special Notice: Safety and Qualification Requirements Safety Compliance (EM 385-1-1): Offerors are advised that all work on this project must strictly comply with the latest edition of the U.S. Army Corps of Engineers (USACE) Safety and Health Requirements Manual (EM 385-1-1) (Link: https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE%2015March2024.pdf). Prior to commencing work, the contractor must submit and secure Government approval for a site-specific Accident Prevention Plan (APP) and comprehensive Activity Hazard Analyses (AHAs). To enforce these standards, the contractor must employ a full-time, dedicated Level 1 Site Safety and Health Officer (SSHO) who must be present on-site at all times when work is in progress. The SSHO may also serve as the Quality Control System Manager (QCSM) but is strictly prohibited from serving as the project Superintendent. See Personnel and Contractor Qualifications. Personnel and Contractor Qualifications: To ensure technical competency and safe execution of this project, the Government requires key personnel to meet strict experience thresholds. The contractor must assign a Project Superintendent with a minimum of five (5) years of construction experience, with at least five (5) of those years acting as a superintendent on earthwork and channel restoration projects similar in size and complexity. Additionally, the contractor must provide a Quality Control System Manager (QCSM) who has a minimum of five (5) years of construction experience on similar projects and holds a valid "Construction Quality Management for Contractors" (CQM-C) certification, as well as a dedicated Site Safety and Health Officer (SSHO). General Information The North American Industrial Classification Code (NAICS) is 237990 – Other Heavy and Civil Engineering Construction. The Small Business Size Standard is $45,000,000.00. Any resultant award will be for one (1) Firm-Fixed-Price (FFP) Purchase Order. The solicitation will be issued on or about 4 November 2026, via the Procurement Integrated Enterprise Environment (PIEE), which posts the opportunity to SAM.gov. The anticipated award date is 30 November 2026. The basis of award will be of best value to the Government. Basis of Award is best value to the Government. Quotes will be evaluated in accordance with (IAW) RFO 12.203(a) and RFO 13.202, price and past performance. The Government reserves the right to reject any quotes that are unrealistically low or exceed available funds for this requirement. Small Business Contractors are advised that APEX Accelerators provide free, expert assistance to small businesses interested in competing for federal, state, and local government contracts. Small businesses are strongly encouraged to connect with their local APEX Accelerators to leverage these valuable services. The APEX Accelerators Website is: https://www.apexaccelerators.us/#/. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on “View FFP Contract Changes Playbook Here”. To submit a quote for this project, your company must: 1) Be registered in the System for Award Management (SAM) and maintain an active registration status. 2) be registered in the Procurement Integrated Enterprise Environment (PIEE) for the Solicitation Module with the PROPOSAL MANAGER Role. System for Award Management (SAM) Registration Registering in SAM.gov includes both entity validation and entity registration. To register in SAM: a) Navigate to SAM.gov b) Select Sign-In (top right) c) Select Create an Account then follow the instructions d) After Account is set-up, Select Sign-In e) Under the Entity Management widget, select “Get Started” button f) Select Register Entity. As part of the entity registration, a Unique Entity ID will be assigned. For additional information on SAM To Register your Entity (Company), please visit https:/www.fsd.gov/gsafsd_sp?id=gsa_index. Here you will find the following: Get Started with your Registration Check Registration Status – ACTIVE, INACTIVE, PENDING Update your Registration Become an Entity Administrator Validate your Entity *Access User Guides *By selecting this option, you can obtain a Quick Start Guide for Contract Registrations. Also, here you will find in addition to the User Guides - FAQs, Videos, and Definitions. PLEASE NOTE: It is mandatory that all companies be registered in SAM in order to receive federal contracts. There is no charge to register or maintain your company (entity) registration. Login.gov manages usernames and passwords for SAM.gov. *Important* Registration Information Registration can take at least ten (10) business days to be active in SAM.gov. Registration must be in active status upon offer submission and remain active during award period. Registration must be renewed every 365 days to remain active. The Federal Service Desk (FSD) for SAM questions, may be contacted. Phone Number: 866-606-8220 Hours of Operation: Monday-Friday 8 a.m. to 8 p.m. ET Procurement Integrated Enterprise Environment (PIEE) Solicitation Module Registration. To register for PIEE follow the below instructions. Register in PIEE: a) Navigate to https://piee.eb.mil/ b) Select New User (top right) c) Select Register d) Select Vendor e) Create a User ID and Password and follow the prompts (next) f) Create Security Questions (next) g) Complete your User Profile Information (next) h) Complete your supervisor or Approving Official Information (next) i) Complete Roles i) Step 1: Select SOL-Solicitation ii) Step 2: Select Proposal Manager iii) Step 3: Click Add Roles iv) Step 4: Fill in your Location Code (CAGE Code) (next) i) Provide Justification for your registration (next) j) Follow the remaining prompts to submit your registration The Procurement Integrated Enterprise Environment (PIEE) help desk may be reached by calling Telephone Number 866-618-5988 for assistance. | 62% | Pre-Solicitation | 11/03/2026 |
This is a Pre-solicitation Notice (Synopsis) and is for informational purposes only. THIS IS NOT A REQUEST FOR PROPOSALS, QUOTATIONS, OR BIDS. The Army Corps of Engineers, Philadelphia District, intends to issue an Invitation for Bids (IFB) solicitation for one (1) Firm Fixed Price Contract for Maintenance Dredging of the Delaware River, Philadelphia to Sea and Christina River, Wilmington Harbor. Contract work consists of maintenance dredging of approximately 2.7 million cubic yards of sediment within the Delaware River, Philadelphia to Sea main navigation channel between Stations 0+000 and 215+000 and approximately 475,000 cubic yards within Wilmington Harbor, Christina River. Work includes hydraulic dredging with placement of the dredged material into the Pedricktown and/or Reedy Point disposal areas. All dredging will be performed to the required depths indicated with 1-foot allowable overdepth. All dredging shall be performed as contour dredging. Before and after dredging surveys for measurement will be performed by the government. The contract duration for construction is anticipated at approximately 165 calendar days. In accordance with FAR 36.204 and DFARS 236.204, the Magnitude of Construction for this project is between $25,000,000 and $100,000,000. The NAICS Code for this project is 237990 and the small business size standard is $37 million. Solicitation No. W912BU23B0007 is anticipated to be issued on or about June 27, 2023, as a full and open procurement. The Government intends to award a firm fixed price contract to the responsible offeror whose proposal conforms to the terms of the solicitation notice. Offerors should review the entire solicitation once it is posted. Information within this presolicitation notice is subject to change. The clauses at FAR 52.236-2, Differing Site Conditions and 52.236-3, Site Investigations and Conditions Affecting the Work will be included in the solicitation and contract award. Accordingly, bidders are urged to inspect the site where the work will be performed. Bonding will be required at the time of bid opening, by separate Bid Bonds; and after award but before Notice to Proceed, Performance and Payment Bonds will be required. Any contract awarded from the solicitation will contain Liquidated Damages, FAR 52.211-12 – Liquidated Damages - Construction, and the amount will be published with the solicitation. Vendors must be registered with the System for Award Management (SAM) database to receive a government contract award. Vendors may register for SAM online at www.sam.gov or by calling 1-836-606-8220. Point of Contact is Zaquette Everett at zaquette.everett@usace.army.mil. | 62% | Pre-Solicitation | 06/12/2023 |
REQUEST FOR INFORMATION THIS IS A REQUEST FOR INFORMATION (RFI)/SOURCES SOUGHT NOTICE BEING RELEASED PURSUANT TO FEDERAL ACQUISITION REGULATION (FAR) PART 10: MARKET RESEARCH. This RFI is issued solely for informational, market research, and planning purposes only. It does not constitute an Invitation for Bid (IFB), Request for Quote (RFQ), or Request for Proposal (RFP) or a promise to issue an RFQ/IFB/RFP in the future. No solicitation document exists at this time. Issuance of this notice does not constitute any obligation on the part of the Government and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. In addition, respondents are advised that the United States Government is under no obligation to pay for any information or administrative cost incurred in response to this RFI. At this time, proprietary information is not being requested, and respondents shall refrain from providing proprietary information in response to this RFI. The specifications for this requirement will only be available upon solicitation issuance. Requirement: The U.S. Army Corps of Engineer (USACE), Philadelphia District (NAP), anticipates a requirement for Delaware Avenue Revetment CAP 14 Project in Cape May, NJ. The estimated magnitude of this project is between $5,000,000 and $15,000,000. Description: The purpose of the project is to manage the risk of on-going shoreline erosion along Delaware Avenue which is threatening the integrity of the road and a sanitary sewer utility line (8-inch force main) that runs along the northern right-of-way of the road, approximately 4 feet under the surface. The least cost alternative and selected plan identified in the feasibility study involves the removal of approximately 8,400 cubic yards (CY) of existing rubble (sand, rock, concrete and paving debris) along the shoreline and the placement of approximately 3,000 CY of rip-rap. Once the rip-rap is placed, the water ward side of the structure will be backfilled with approximately 5,000 CY of sand and planted with native wetland vegetation. The estimated period of performance will be 165 calendar days. The anticipated North American Industrial Classification System (NAICS) code is 237990, Other Heavy and Civil Engineering Construction, with a SBA Size standard of $45.0M. The Product Service Code (PSC) is Y1QA - Construction of Restoration of Real Property (Public or Private). Survey: The Government is issuing this notice to determine a competitive basis. This is not a solicitation and the items listed herein are subject to change. This survey is for market research purposes only. Only prospective contractors capable of performing this type of work should respond to this Request for Information. Your response to this survey is requested by 2:00 PM Eastern Time, November 11, 2026. Please send by email to Jessica Hazen at Jessica.A.Hazen@usace.army.mil and Connor Struckmeyer at Connor.A.Struckmeyer@usace.army.mil. Include in the title "Sources Sought - Delaware Avenue Revetment" as the subject line in email communications. All submitted responses must be in either Microsoft Word or Adobe pdf format. 1.) Name of your firm: 2.) CAGE/Unique Entity Identifier: 3.) Point of Contact, Phone Number, and E-mail Address: 4.) List up to three (3) projects completed within ten (10) years of the date of this notice that demonstrates experience, as a prime contractor or subcontractor, related to the type of construction provided in the description above. a.) Project Name: Contract Number (if applicable): Year Completed: Was the project completed on time? Prime or Subcontractor: Type and percentage of work self-performed (based on contract value): Dollar Amount: General description of project: b.) Project Name: Contract Number (if applicable): Year Completed: Was the project completed on time? Prime or Subcontractor: Type and percentage of work self-performed (based on contract value): Dollar Amount: General description of project: c.) Project Name: Contract Number (if applicable): Year Completed: Was the project completed on time? Prime or Subcontractor: Type and percentage of work self-performed (based on contract value): Dollar Amount: General description of project: 5.) Are you a Small Business classified under the above NAICS code? If so, do you fall into a sub-category (e.g. HubZone, 8(a), SDVOSB, WOSB, etc.)? 6.) For this requirement, what percentage of this work would you subcontract (reference RFO 52.219-14, Limitations on Subcontracting? 7.) What type of work requirements will you subcontract out to small businesses? 8.) Do you plan to subcontract to only small businesses? 9.) If the answer to question 8 is "yes", are these small businesses with a sub-category (e.g. e.g. HubZone, 8(a), SDVOSB, WOSB, etc.) 10.) What is your bonding capacity per contract? 11.) What is your aggregate bonding capacity per contract? 12.) If this requirement is advertised, do you anticipate submitting a proposal? | 61% | Market Research | 11/11/2026 |
Additional Details
Solicitation Number
W912BU26RAXXX
Archive Date
Jan 22, 2026
Office Address
PHILADELPHIA, PA, 19103-0000