GovChime
Notice ID: f2da72eff7349ef3c940e08c6aea9f63Award NoticeAwarded

Y--Denison Bridge Crane Rehabilitation at Denison Powerhouse, TX

Awarded on September 14, 2012. Full description on SAM.gov.

Awarded tounder W912BV-12-C-0022 (source: SAM.gov award notice)• $1.4M

Overview

Posted
September 17, 2012
Notice type
Award Notice
Agency
Department of WarDepartment of the Army

Notice details

Office
W076 ENDIST TULSA
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 5, 2025
Award date
Sep 14, 2012
Award amount (SAM.gov award notice)
$1.4M

Identifiers

Solicitation number
W912BV12R0033
Notice ID
f2da72eff7349ef3c940e08c6aea9f63
Award number (PIID)
W912BV-12-C-0022

Description

This requirement will consist of rehabilitation of the 225 ton bridge crane at the Denison Dam Powerhouse located at Denison Texas. Specific requirements include removal of all electrical equipment and wiring on the bridge crane, and the design, fabrication, factory testing, and installation of a new operator's cab and all electrical equipment and associated systems. The equipment includes main-line conductors and collectors, motors, brakes, complete control systems with cab and radio control, conduit, wiring, and auxiliary devices to replace the crane's electrical power, control, and lighting systems. Also required will be the cleaning and visual inspection of existing mechanical equipment installation of new machinery bases, motors, brakes, couplings, gears, gear reducers, wire rope, limit switches, couplings, drums and rail realignment. The crane will also be repainted after all repairs are made.

Full description on SAM.gov

Award Overview

Award Number

W912BV-12-C-0022

Award Amount (SAM.gov award notice)

$1.4M

Award Date

Sep 14, 2012

Awardee

Awardee UEI

Q89TUUQ8N5R3

Original Solicitation

Notice ID: f2da72eff7349ef3c940e08c6aea9f63

Posted Date: Sep 17, 2012

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

psmoody, (918)669-7457 USACE District, Tulsa

Documents

No documents available.

Lifecycle

Solicitation:W912BV12R0033
  1. Awarded

This opportunity has been awarded.

  1. AwardedCurrentSep 17, 2012

    Y--Denison Bridge Crane Rehabilitation at Denison Powerhouse, TX

    Notice f2da72eff7349ef3c940e08c6aea9f63 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912BV12R0033

Archive Date

Oct 17, 2012