Notice ID: 97198c918ac1dcb5795cc6fa154b0f8aAward NoticeAwarded
KC-46A Depot Maintenance Hanger - Tinker AFB, OK.
Awarded on August 29, 2019. Full description on SAM.gov.
Awarded tounder W912BV19C0015 (source: SAM.gov award notice)• $65.3M
Overview
- Posted
- August 30, 2019
- Notice type
- Award Notice
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of War
Notice details
- Place of performance
- Tinker Air Force Base, Oklahoma City, OH, 73145-8106
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 4, 2025
- Award date
- Aug 29, 2019
- Award amount (SAM.gov award notice)
- $65.3M
Identifiers
- Solicitation number
- W912BV18R0050
- Notice ID
- 97198c918ac1dcb5795cc6fa154b0f8a
- Award number (PIID)
- W912BV19C0015
Description
ATTENTION!!! ATTENTION!! ATTENTION!!! AMRDEC SAFE has been disabled and is not usable for transferring files ALL interested Vendors MUST send an email to both addresses listed below: Bruce.E.Hayes@usace.army.mil Brian.C.Hutchison@usace.army.mil In your email, you MUST state that you intend on submitting a proposal PRIOR to the deadline of 2:00PM today, 9 November 2018 which is the DEADLINE for proposal submissions for this procurement. An acknowledgment email will be sent to you with instruction on how to submit your Volume 1 & 2 proposals. If you have a medium to send large files to us, contact us IMMEDIATELY, PRIOR TO the deadline to submit your proposals.
Award Overview
Award Number
W912BV19C0015
Award Amount (SAM.gov award notice)
$65.3M
Award Date
Aug 29, 2019
Awardee
Awardee UEI
X3BYPXNZN8N1
Awardee CAGE Code
1D6R7
Original Solicitation
Notice ID: 97198c918ac1dcb5795cc6fa154b0f8a
Posted Date: Aug 30, 2019
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $56.2MSigned Aug 17, 2026
- $95.0KSigned Aug 14, 2026
- $126.3MSigned Aug 13, 2026
- $40.7MSigned Aug 11, 2026
- $150.0MSigned Aug 6, 2026
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912BV18R0050- Pre-Solicitation
- Awarded
This opportunity has been awarded.
- 7×Pre-SolicitationJul 30, 2018
KC-46A Depot Maintenance Hanger - Tinker AFB, OK.
- AwardedCurrentAug 30, 2019
KC-46A Depot Maintenance Hanger - Tinker AFB, OK.
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The U.S. Army Corps of Engineers (USACE), Tulsa District is issuing this Market Intelligence Survey for the 552 Air Control Wing Commander has a requirement to establish a secure facility for mission planning in support of bringing new capabilities to the E-3 Sentry Aircraft and E-7 Wedgetail and to relocate the 963rd and 964th operational airborne warning and control system flying squadrons. The intent is to provide a properly configured and sized facility to support multiple combat-coded squadrons with the required infrastructure and security levels to sustain combat mission readiness, training, and computer network/hardware requirements. This includes planning and executing combat training events with current, fourth-, and fifth-generation aircraft from the air and on land in direct support of the 23A system, ground control and reporting centers, and E-3/E-7 airborne warning and control system missions. | 69% | Special Notice | 12/01/2026 |
AMENDMENT 0001 The purpose of Amendment 0001 to Solicitation W519TC-26-Q-JOC1 is to extend the closing date to 16 November 2026, 5:00PM CST. All other terms and conditions of the solicitation remain unchanged. ****************************************************************************************************************************************************** The Solicitation will be for projects within the McAlester Army Ammunition Plant (MCAAP). The contractor shall perform all work required as specified within the Statement of Work (SOW) in each individual Task Order (TO). The general description of the work of this Job Order Contract (JOC) includes, but is not limited to, a broad range of sustainability, repair, and maintenance (SRM), and minor construction work on real property at MCAAP. The work is required in support of Directorate of Public Works (DPW) activities. The contract comprises a one-year (1) base period with four one-year (1) option periods. This requirement is a total small business set-aside under NAICS 236220 – Commercial and Institutional Building Construction, size standard $45M. Individual task orders will be firm-fixed price and contain the following limitations: The Base Year will have an established value with a minimum limit of $5,000 and a maximum limit of $19,800,000. Option Periods 1 through 4 will have an established value with a minimum of $5,000 and a maximum limit of $19,800,000. The total maximum value of all Task Orders issued under this Master Agreement (including all option years) shall not exceed $99,000,000.00. EVALUATION OF PROPOSALS Proposal shall contain the complete solicitation number (W519TC-26-Q-JOC1), and a complete detailed proposal for the sample TO as specified in the EXAMPLE Statement of Work (SOW) titled, "50’x100’x18’ Red Iron Storage Facility". The sample TO is for evaluation purposes ONLY. The single, comprehensive coefficient proposed for the sample TO, representing all direct and indirect costs not included in the RSMeans Unit Price Book (UPB), shall be the coefficient utilized by the contractor for all future TOs. This single coefficient is the only price factor to be proposed. Any questions should be addressed no later than 30 OCT 2026 (10 days before end of solicitation) and sent via email to Jessica Parr at jessica.m.parr2.civ@army.mil. Sample proposal is DUE 09 NOV 2026 no later than 5:00PM CST via email to jessica.m.parr2.civ@army.mil. Work under any TO issued as the result of any contract awarded shall be performed in strict accordance with the TO SOW, the broad SOW incorporated in this solicitation, and all applicable federal, state and local environment laws, regulations, and policies No work shall commence without a formally executed Task Order. The process shall be as follows: A. Joint Scope Meeting: Upon identifying a need, MCAAP and Contractor shall conduct a site visit to jointly define the precise Scope of Work (SOW). B. Proposal Submission: The Contractor shall submit a detailed price proposal based strictly on the agreed SOW, utilizing the Unit Price Book (UPB) line items, exact quantities, and the applicable Adjustment Factor. C. Issuance: Upon MCAAP review and approval of the proposal, MCAAP will issue a signed Task Order detailing the exact firm-fixed price and the Required Completion Date. If a required task or material is not listed in the UPB, it shall be classified as a Non-Pre-Priced (NPP) item. For any Non-Pre-Priced (NPP) item required during the performance of a Task Order, the Contractor must obtain and submit a minimum of three (3) independent quotes from subcontractors or suppliers. The Contractor may then apply their accepted NPP Markup Factor to the lowest responsive quote. NPP items must not exceed 10% of the total cost of any individual Task Order. Payment & Performance Bonds: The Contractor shall provide a Payment and Performance Bond for 100% of the value of any individual Task Order exceeding $35,000 (or as dictated by local statute). Insurance: The Contractor must maintain Commercial General Liability, Worker’s Compensation, and Automobile insurance for the duration of this Master Agreement, naming the Owner as an additional insured. If the Contractor fails to complete a Task Order within the time specified in that specific Task Order, the Contractor shall pay MCAAP liquidated damages at the rate specified in the individual Task Order (e.g., $500 per calendar day) until the work is substantially complete. PRICING & THE UNIT PRICE BOOK (UPB) Pricing for all standard work under this contract shall be based on RSMeans Facilities, RSMeans Electrical, RSMeans Heavy Construction, RSMeans Mechanical, and RSMeans Plumbing. All publications are dated 2026. The prices in the UPB serve as the firm-fixed baseline. The Contractor’s accepted bid Coefficients (Adjustment Factors) will be applied to the UPB line items to calculate the final price of each Task Order. The Contractor's negotiated Adjustment Factors are: COEFFICIENT/PRICE SCHEDULE Contractor a. The R. S. Means (RSM) Facilities Construction Cost Data Book (current edition at the time of bid submission) shall be used when developing coefficients for each year of the base period. RSM and 4Clicks Project Estimator software, E4Clicks Premier Version 2.615 (http://www.4clicks.com), shall be used to develop proposals in response to each task order RFP. b. The price offer shall be comprised of coefficients. A coefficient, as defined in AFARS 5117.9001, is "a numerical factor that represents costs (generally indirect costs) not considered to be included in RSM unit prices (e.g., general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, equipment rental, and also contractor's profit)." c. Coefficients proposed and accepted upon award are multiplied by unit prices in RSM to price a job or project on individual task orders. The coefficients proposed are incorporated in the Job Order Contract (JOC). Offerors who submit separate coefficients for separate line items in RSM will be considered unacceptable and the offer will be rejected. Coefficients are limited to three decimal places and submitted as a whole number. For example: 1.015. d. When developing proposals, use "Average" rows in RSM if shown. If only "Minimum/Maximum” rows are shown, use the "Minimum" row. Also, use the column entitled "Total Bare Costs" which includes material, labor, and equipment. Do not use the column "Total Incl O & P." e. The offeror's price coefficient must include but is not limited to the following: 1. Overhead 2. Profit (prime and subcontractors) 3. Insurance 4. Compliance with environmental laws, protection and safety 5. Tax Laws 6. Protection or moving of Government property 7. Administrative work 8. All costs associated with bonding (bond premiums) 9. Submittals 10. Price quotations 11. Contractor adjustments to RSM unit prices 12. Clean-up 13. All waste and excess materials 14. Permits, licenses and fees 15. Mobilization and close-out for total contract and each delivery order 16. Signs and barriers 17. Project management and supervision 18. Quality Control 19. Office management and equipment 20. Interest associated with funding of equipment and payroll 21. Depreciation of site offices 22. Employee payroll taxes, insurance and fringe benefits 23. Risk of lower-than-expected contract dollar volume 24. Risk of high inflation costs for coefficients bid for future years 25. Risk of poor subcontractor performance and re-performance 26. Other risks of doing business 27. Business taxes, contributions, memberships, corporate headquarters support (legal, financial, etc.) 28. The offeror should consider the cost of final clean-up and removal and hauling of trash, debris and rubbish in the coefficients. The Government will not pay nor accept line items for the final clean-up or rubbish, hauling, etc., on delivery orders, unless it is explicitly excluded by the line items in RSM. 29. Travel 30. Performance and Payment bonds. 31. As-built drawings 32. City cost indexes The unit prices stated in RSM include labor, materials and equipment. Cost of performance and payment bonds are part of the coefficient, per AFARS 17.9001. All costs shall be included in the proposed coefficients as no allowance will be made after award. The offeror must provide their coefficient formula with their proposal. Work Hours Normal Working Hours (6:00 AM – 4:30 PM, M-T) Other-Than-Normal Working Hours (Nights, Weekends, Holidays) BASIS FOR CONTRACT AWARD (A) Contract Vehicle: The award will result in a Firm-Fixed-Price (FFP), Job Order Contract (JOC). The awardee will have a total maximum capacity (ceiling) of $99,000,000 over the life expectancy of the contract, which includes a one (1) year base ordering period and four (4) one-year optional ordering periods. (B) Fair Opportunity: The Government does not guarantee any specific volume of work beyond the minimum guarantee of $5,000 for the base contract awardee. (C) Evaluation and Selection: Award will be made to the responsible offeror whose proposal represents the Best Value to the Government. For the purposes of this solicitation, all non-price factors combined are significantly more important than price. The Government intends to evaluate proposals and award this contract without discussion but reserves the right to conduct discussions if determined necessary. Proposals will be evaluated based on the following factors: Factor 1: Past Performance. The Government will evaluate the offeror's demonstrated record of successfully performing work of similar size, scope, and complexity. Offerors must provide 3-5 completed government projects ranging from $100,000.00 to $3,000,000.00. The evaluation will assess the quality and relevance of the contractor’s experience based on the following information for each project: Contract Number and Value Detailed Description of Work Demonstrated Technical Quality Evidence of Cost Control Adherence to Schedule/Timeliness Management/Business Relations and Customer Satisfaction Small Business Subcontracting achievements Factor 2: Price. The price evaluation will be based on the total evaluated price for the sample TO, derived from the offeror’s proposed coefficient. While price is the least important factor, it will be evaluated for fairness and reasonableness. Offers, along with all required documents, shall be submitted electronically via email to the Contract Specialist at jessica.m.parr2.civ@army.mil. Offerors should include “Response to W519TC-26-Q-JOC1” within the subject line. Packages are DUE 09 NOV 2026 by 5:00 p.m. CST via email. Questions shall be submitted in the same manner as Offers, electronically via email to the Contract Specialist no later than 10 days before Solicitation closes, or 30 OCTOBER 2026, to allow sufficient time to respond and Amend Solicitation as needed. NOTE: Questions not received within a reasonable time prior to close of the Solicitation WILL NOT be considered. PAYMENT: The Wide Area Workflow (WAWF) System, available through the Procurement Integrated Enterprise Environment (PIEE) System, is required for use under any resultant TO. This is the Government's electronic process for receipt and acceptance documents and contractor payment. Please provide the following information: Unique Entity ID: DUNS Number: Cage Code: Taxpayer ID Number: Email Address: Point of Contact The point of contact for this award is Contract Specialist, Jessica M. Parr at jessica.m.parr2.civ@army.mil | 68% | Combined Synopsis | 11/16/2026 |
**Down Select Notification will occur on/about 09 November 2026. This special notice is to inform industry that those companies down selected to participate in Phase 2 will be invited to attend a site visit at the place of performance on 18 November 2026. SITE VISIT FOR DOWN-SELECTED OFFERORS - The Government intends to provide a site visit for the three (3) down-selected offerors during the Draft RFP review period. Attendance is not required, but strongly encouraged. The purpose of the site visit is to provide the down-selected offerors a common factual understanding of site conditions relevant to proposal development. Attendance requirements, access procedures, safety requirements, allowable attendees, and other administrative instructions shall be provided by the Government. Any questions arising from the site visit shall be submitted through the official Request for Information (RFI) process. Oral statements made during the site visit are not binding unless incorporated into the solicitation by formal written amendment. Site Visit Date, Time, and Location - A site visit at Letterkenny Army Depot will be held 18 November 2026, 8:00-3:30 p.m. EST, prior to the Proprietary Meetings (2 hours per site visit). Coordinates: Building 2 CAC and ID Center; 39.997017, -77.633519. Meeting Room: TBD; Date: TBD; Time: TBD; Proposed Site Visit Agenda: TBD; Site Visit Access and PPE - To enter the installation, a current and valid REAL ID will be required. Once you have been notified that you have been selected to move forward in the procurement process, email TONJA DREKE at tonja.j.dreke@usace.army.mil, and LAUREN ELAMENUEL at Lauren.N.Elamenuel@usace.army.mil, to confirm you plan to attend the site visit. All site visit attendees must be U.S. citizens. Attendees are also requested to bring their own eye protection, hard hat, and preferably steel-toed boots, though closed-toed shoes will be acceptable. Site Visit Attendee Limit - Offerors are requested to limit site visit attendance to six (6) people. Completed AMLD 4497 forms (as applicable) and a list of attendees must be provided to the Contracting Officer no later than 4 p.m. EST on 10 November 2026 prior to the site visit and shall include each individuals first and last name and associated firm, so that LEAD security can process visitor forms (attached). You will be provided with a secure link to send your completed AMLD 4497 forms. DO NOT email the completed AMLD 4497 form directly to USACE emails due to the required Personal Identifiable Information (PII). Those with non-expired badges will only need names and position titles; those with non-expired CACs should review forms and will need names and position titles. For all others, all forms are required and should be prepared and ready for submission in case you are one of the down selected firms. Submission will be due by 4 p.m. EST on 10 November 2026 allowing for the greatest ability for clearance to the site visit on 18 November 2026. Anyone submitting after that time and date cannot be guaranteed to be cleared due to the Veterans Day holiday. Transportation will be provided for those attending the site visit. We will board the Government provided transportation and travel to the project site, where the actual site visit will occur. No pictures are permitted during this site visit. Participants will be required to identify themselves by signing the attendance sheet. Participants will be required to keep their visitor day pass for the site visit and government issued identification with them for the full duration of the site visit. AGAIN, THIS IS ONLY FOR THOSE WHO RECEIVE NOTICE OF DOWN SELECT ON 09 November 2026. **The purpose of this amendment is to: A. Correct percentage in Factor 1 for General contractor. B. Make clarification on projects for DOR in Factor 1. C. Correct period of performance for clarification; 730 calendar days. D. Remove Item 4 Schedule from Team Integration, Factor 2. E. Add site visit date for reference or planning purposes; noting this will only be applicable to those who are down-selected to Phase 2, F. Provide updated attachments Experience in Relevant Projects and Past Performance Questionnaire. All other terms and conditions remain unchanged. This amendment has four (4) attachments. This is a two-phase Design-Build to Budget (DBtB) solicitation for the design and construction of the Component Rebuild Shop in accordance with procedures at RFO 36 and part 15. This solicitation is being issued on a Full and Open, Unrestricted basis. The Government will evaluate Phase I - Technical Proposals in response to this solicitation in accordance with the criteria described herein. The budget for this project will be $79,600,000.00 The North American Industry Classification System (NAICS) code for this acquisition is 236220 Commercial and Institutional Building Construction, size standard $45M. NOTICE: Procurement Integrated Enterprise Environment - Solicitation Module (PIEE-SOL) is the only authorized means of submitting a response to this Request for Proposal (RFP), any other form of submission WILL NOT BE ACCEPTED. PROJNET is the only authorized platform for submission of Request for Information (RFI) by interested parties. Any other form of submission, including email, WILL NOT BE ACCEPTED. ProjNet provides the official record of RFI submission and responses. Guidance for the use of both PIEE-SOL and PROJNET are located in Section 00 20 00 and 00 21 00 of the solicitation. This solicitation has five (5) attachments. | 66% | Special Notice | Open |
Child Development Center (CDC), Tinker Air Force Base, Oklahoma. THIS PROJECT IS FOR A NEWLY CONSTRUCTED CDC FACILITY WILL ACCOMMODATE 228 CHILDREN AGED FROM INFANT TO FIVE-YEARS OLD, 80 STAFF MEMBERS AND VISITORS. CONSTRUCTION INCLUDES A SINGLE-STORY FACILITY WITH DRILLED PIER FOUNDATION, CONCRETE SLAB, STEEL FRAME, DOUBLE WYTHE MASONRY EXTERIOR WALLS, AND STANDING SEAM METAL ROOF. PROJECT INCLUDES CORE ADMINISTRATIVE SPACES, STAFF AND FACILITY SUPPORT SPACES, CHILD ACTIVITY AREAS, MULTI-PURPOSE ROOMS, ISOLATION ROOMS, LAUNDRY ROOMS LACTATION ROOMS, STORAGE ROOMS, KITCHEN AND EQUIPMENT, AND AUTHORIZED EQUIPMENT SUCH AS CCTV SYSTEM, PLAYGROUND AREA AND EQUIPMENT. THIS ACQUISITION IS FULL AND OPEN COMPETITION. THIS SOLICITATION AND RESULTING CONTRACT ARE UTILIZING A BEST VALUE TRADE-OFF PROCUREMENT METHOD AS DESCRIBED IN RFO PART 15. THE MAGNITUDE OF CONSTRUCTION IS BETWEEN $50,000,000.00 AND $75,000,000.00. THE NAICS CODE FOR THIS PROJECT IS 236220, COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION. THE SIZE STANDARD IS $45,000,000. DPAS RATING: DO-C2, REFER TO CLAUSE FAR 52.211-15, DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS. Amendment 0001 provides site visit information. Amendment No. 0002 is hereby issued. Please see attachments for full summary of changes. Amendment No. 0003 is hereby issued. Please see attachments for full summary of changes. Amendment No. 0004 is hereby issued to update Section 01 45 00. | 65% | Solicitation | 12/01/2026 |
This is a request for proposal (RFP) for the construction of a new vehicle maintenance shop and supporting facilities at Kadena Air Base, Okinawa, Japan. A firm-fixed price construction contract will be awarded based on a tradeoff source selection approach in which the non-price factors are approximately equal to the price factor. The work will include substantial earthworks, demolition of existing structures, and new construction. Please review all attachments. A site visit was held on 10 November 2026. The attendee sign-in sheet is attached. | 65% | Solicitation | 02/16/2027 |
Additional Details
Solicitation Number
W912BV18R0050
Archive Date
Jan 1, 2022
Office Address
TULSA, OK, 74137-4290