GovChime
Notice ID: cb4c36515bc44578a6bcc422049d4085Solicitation

Robert S Kerr Powerhouse Turbine/Generator Rehabilitation

Archived on January 28, 2021. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−06:00
Posted
December 22, 2020
Notice type
Solicitation
Agency
Department of WarDepartment of the Army

Notice details

Office
W076 ENDIST TULSA
Place of performance
Robert S. Kerr Powerhouse, Keota, OK, 74941-6569
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912BV19R0042
Notice ID
cb4c36515bc44578a6bcc422049d4085

Description

The requirements of this contract are to provide all equipment, labor, materials, and work required to refurbish Robert S. Kerr turbine generating Units 1 through 4 at the R.S Kerr Power Plant located in Keota, Le Flore County, Oklahoma. This is not a full and complete listing of the required work listed in the specification. Specifically, the proposed plan of work involves the Contractor furnishing all supervision, engineering, labor, materials, and equipment to perform the stated work in strict accordance with the detailed requirements of the contract. The existing Kaplan turbines will be replaced with new Kaplan turbine runners with a rated output of 49,300 hp. to accommodate the new rewound generators. Besides the replacement of the turbine runner the majority of the turbine work will be focused around head covers, wicket gates, turbine shaft, runner, bearings, operating ring, servomotors, and facing plates. The wicket gates will be replaced. A discharge ring insert will be fabricated, installed and machined to proper profile. The rest of the turbine equipment will be inspected and/or replaced/refurbished to include but not limited to stay ring, stay vane, vacuum breaker, head covers, bottom ring, and facing plates. The Contractor shall also be required to rehabilitate Units 1 through 4 by replacement of the generator stator winding. The new stator winding shall be rated no less than 37,895 KVA at a power factor of 0.95 with a temperature rise not to exceed 75 degrees C above a cooler discharge air temperature of 40 degree C., when operated at rated load. Replacements of Units 1 through 4 generator stator cores will be included as an option. The field winding will be inspected, tested, and cleaned, but may be reinsulated as an option. The generator upper and lower bearing pads, thrust bearing shoes and runner will be refurbished. The thrust bearing collar on the generator shaft will be inspected and optionally refurbished. One new set of thrust bearing shoes will be fabricated as spares. Amendment 0001 is issued to update the Bidder Inquiry key. Amendment 0002 is issued to update the information pertaining to the site visit. Amendment 0003 is issued to extend the proposal due date, update FAR 52.204-24 and 52.204-25, update the wage determination, and incorporate a generator test report. Amendment 0004 is issued to extend the proposal due date. Amendment 0005 is issued to extend the proposal due date; replace the proposal schedule; update Sections 00 22 11, 00 72 00, and 00 73 00; update the wage determination; and update the specifications section. Amendment 0006 is issued to extend the proposal due date. Amendment 0007 is issued to update information pertaining to bonding requirements and specification changes in Sections 00 21 16, 00 73 00, 01 00 00, 01 22 00.00 26,48 13 13.01 26, 48 13 13.04 26 and 48 13 16.00 26. Amendment 0008 is issued to extend the proposal due date.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Julie S. Hill
Contract Specialist

Secondary Contact

Brian Hutchison
Contracting Officer
Fax: 9186697436

Documents

No documents available.

Lifecycle

Solicitation:W912BV19R0042
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 3×
    Special NoticeJun 20, 2019

    Robert S Kerr Powerhouse Turbine/Generator Rehabilitation

    Notice 152af0ddca3b486995eb4eed1e2e5675 on SAM.gov

  2. Pre-SolicitationJun 5, 2020

    Robert S Kerr Powerhouse Turbine/Generator Rehabilitation

    Notice 297a9f0170f849a789b059035ac86406 on SAM.gov

  3. Special NoticeJun 5, 2020

    Robert S Kerr Powerhouse Turbine/Generator Rehabilitation

    Notice 62d1f14a181d497b8faf086a88c38fe2 on SAM.gov

  4. 12×
    SolicitationCurrentJul 10, 2020

    Robert S Kerr Powerhouse Turbine/Generator Rehabilitation

    Notice cb4c36515bc44578a6bcc422049d4085 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912BV19R0042

Archive Date

Jan 28, 2021

Office Address

TULSA, OK, 74137-4290