Notice ID: 7a3e33d9ed72476da2e695c7377244c0Solicitation
Dewater Skiatook and Birch Lakes Stilling Basins, Osage County, Oklahoma
Archived on September 29, 2020. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−05:00
- Posted
- September 2, 2020
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W076 ENDIST TULSA
- Place of performance
- Skiatook
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W912BV20Q0088
- Notice ID
- 7a3e33d9ed72476da2e695c7377244c0
Description
Skiatook Stilling Basin: Contractor will provide all labor, supplies, and materials to successfully stop water from outlet works and pump water out of Stilling Basin downstream past higher area of channel. A cofferdam will not be required as discharge piping can be placed on the fisherman’s sidewalk serving as a diversion path to the downstream outlet channel. Sidewalk has weep holes and can be plugged to ensure discharged water continues downstream. A cofferdam will only be needed if a large rain event occurs during the dewater process. All service, emergency, and low flow gates will be operated by USACE employees and will provide safety lock-out tag-out measures. A 6-in pump with enough suction pipe will be placed in the stilling basin and water will be pumped up the fisherman’s sidewalk. As the stilling basin’s water decreases the use of a smaller diameter pump may be required due to suction issues. A minimum of 3-in pump will be placed where the outlet channel flows away from the stilling basin. All pumps will be supplied by contractor. Coal dust, rags, and cotton seed hulls will be supplied by contractor and inserted upstream of the emergency/service gate to reduce leakage past the gates. This dewater activity is only for inspection purposes and no repairs will be done during this limited time that the stilling basin is open. The govt will provide the contractor with drawings such as plan view of outlet channel, stilling basin, etc.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W912BV20Q0088- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- SolicitationCurrentSep 2, 2020
Dewater Skiatook and Birch Lakes Stilling Basins, Osage County, Oklahoma
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912BV20Q0088
Archive Date
Sep 29, 2020
Office Address
TULSA, OK, 74137-4290